2467
Comment:
|
1977
|
Deletions are marked like this. | Additions are marked like this. |
Line 21: | Line 21: |
== 2017-12-11 == * --(Double check prism heights.)-- * --(Do mirror gluing.)-- * --(Check mirror gluing.)-- * Assemble SR2 IP. * --(Hassle Miyo-kun for pico driver.)-- * --(Set up for testing IP with pico driver.)-- * --(Make pico cable.)-- * --(Glue Misumi plug in movable mass (also glue remaining disks in IM flags).)-- * Assemble IP. * Test IP picos. * --(Weigh BF.)-- * --(Find accessories.)-- * --(Do weighing.)-- |
== 2017-12-18 == * --(Assemble SR2 IP.)-- * --(Final assembly.)-- * --(Test IP picos.)-- |
Line 36: | Line 26: |
* --(2 x Type 3-6m )-- | |
Line 38: | Line 27: |
* --(4)-- 3 x Type 4-1.5m | |
Line 40: | Line 28: |
* --(7 x Type 2-2m)-- * --(Set up SR2 rack)-- * --(Get ADC/DAC/DIO cards)-- * --(Get cables/cards for SR2)-- * --(Get BIO white cables x 10)-- * --(Hassle Miyakawa/Yamamoto to connect rack to DC power, Internet, etc.)-- * Get SR2 real-time model running (Yamamoto-san). |
* Set up SR2 rack * Get more 1-m power cables and connect up remaining boxes. * Run LAN and power cables for stepper drivers. * Debug SR2 real-time model (Yamamoto-san). |
Line 48: | Line 33: |
* Adjust verticality of assembly frame; center and immobilize optical table. * --(Find and attach feedthroughs.)-- * --(Find circuit boards for geophones)-- (Okutomi-san says we have 5 free plus 5 tied up in his experiment till Feb-Mar 2018.) * --(Check if they have sockets soldered on.)-- (Yes.) * --(Check if they come with hex posts.)-- (Yes.) |
* Assembly frame stuff: * --(Center and immobilize optical table.)-- * --(Adjust verticality of assembly frame.)-- * --(Remove internal crossbars for SF and BF.)-- * Adjust external crossbar heights. |
Line 55: | Line 40: |
* Cu O-rings for pod (two sizes) | * --(Cu O-rings for pod (two sizes).)-- |
Line 61: | Line 46: |
* Install new jack receptacles (in SR3 area, second floor) on load gauge adapter (SR2 area, second floor). * Review Shoda-san's Guardian. * Review DIO stuff. * Review SR2 model (especially screens, macro text file). * Review DAC channel requests. |
|
Line 65: | Line 55: |
* Get geophone circuit boards from Okutomi-san. * Find fourth feedthrough |
|
Line 66: | Line 58: |
* Install new jack receptacles (in SR3 area, second floor) on load gauge adapter (SR2 area, second floor). | |
Line 71: | Line 62: |
* Get geophone circuit boards from Okutomi-san. * |
VIS Type B SR Near Term To-Do List
Preparation for SR Installation
Every Week
Facilities
- Vacuum and roll floor.
- Wipe ladders.
- Tidy tools, parts.
Get stuff from ../WishList
2017-12-18
Assemble SR2 IP.
Final assembly.
Test IP picos.
- Find in-vac cables:
- 1 x Type 3-2m
- 5 x Type 1-2m
- Set up SR2 rack
- Get more 1-m power cables and connect up remaining boxes.
- Run LAN and power cables for stepper drivers.
- Debug SR2 real-time model (Yamamoto-san).
- Do inventory of ballast masses.
- Assembly frame stuff:
Center and immobilize optical table.
Adjust verticality of assembly frame.
Remove internal crossbars for SF and BF.
- Adjust external crossbar heights.
- Find out (from Takahashi-san) specifications for geophone pod items:
- Screws for pod (cap-neck and neck-body).
Cu O-rings for pod (two sizes).
- Viton O-ring for under geophone.
- Screws for immobilizing geophone (M4?).
- Screws for geophone to interface plate.
- Screws for interface plate to PI.
- Find or order geophone items.
- Install new jack receptacles (in SR3 area, second floor) on load gauge adapter (SR2 area, second floor).
- Review Shoda-san's Guardian.
- Review DIO stuff.
- Review SR2 model (especially screens, macro text file).
- Review DAC channel requests.
SR Prep Tasks - To Be Scheduled
- Get geophone circuit boards from Okutomi-san.
- Find fourth feedthrough
- Hassle Miyo-kun for stepper drivers.
- Finish mass budget for SR2/SR3/SRM (Fabian) - mostly done.
- Design final SF ballast masses (Fabian).
- Get safety bars moved.
- Get air hose connection moved.