== 2017-12-11 ==
 * --(Double check prism heights.)--
 * --(Do mirror gluing.)--
 * --(Check mirror gluing.)--
 * Assemble SR2 IP.
  * --(Hassle Miyo-kun for pico driver.)--
  * --(Set up for testing IP with pico driver.)--
  * --(Make pico cable.)--
  * --(Glue Misumi plug in movable mass (also glue remaining disks in IM flags).)--
  * Assemble IP.
  * Test IP picos.
 * --(Weigh BF.)--
  * --(Find accessories.)--
  * --(Do weighing.)--
== 2018-01-15 ==
 * Cable RM OSEMs to rack.
 * Setup QPD and do temporary cables to rack.
 * Do TFs from RM OSEMS to OL pitch/roll.
 * Make IM OSEMs.
 * Install load gauge adapter.
 * Lift IM/RM/SR with LGA, check/adjust total mass and pitch/yaw balance.
 * Test IM picos.

== 2018-01-22 ==
 * Crane in BF.
 * Hook IM.
 * Route cables via flying saucer up to under BF.
 * Recheck total mass and pitch/roll balance.
 * Check BF yaw pico.

== 2018-01-28 ==
 * Install IRM.
 * Adjust IM OSEMs.
 * Cable IM OSEMs.
 * Do TFs from IM OSEMs to IM OSEMs, OL pitch/yaw.
 * Install pre-calculated BF trim mass.
 * Lift
 
Line 36: Line 46:
  * --(2 x Type 3-6m )--
Line 38: Line 47:
  * --(4)-- 3 x Type 4-1.5m
Line 40: Line 48:
  * --(7 x Type 2-2m)--
 * --(Set up SR2 rack)--
  * --(Get ADC/DAC/DIO cards)--
  * --(Get cables/cards for SR2)--
  * --(Get BIO white cables x 10)--
  * --(Hassle Miyakawa/Yamamoto to connect rack to DC power, Internet, etc.)--
  * Get SR2 real-time model running (Yamamoto-san).
 * Do inventory of ballast masses.
 * Adjust verticality of assembly frame; center and immobilize optical table.
 * --(Find and attach feedthroughs.)--
 * --(Find circuit boards for geophones)-- (Okutomi-san says we have 5 free plus 5 tied up in his experiment till Feb-Mar 2018.)
  * --(Check if they have sockets soldered on.)-- (Yes.)
  * --(Check if they come with hex posts.)-- (Yes.)
 * Set up SR2 rack
  * Get more 1-m power cables and connect up remaining boxes.
  * Run LAN and power cables for stepper drivers.
 * Review Shoda-san's Guardian.
 * Decide if we're really going to renumber IP channels.
 * Review DIO stuff.
 * Review SR2 model (especially screens, macro text file).
 * Review DAC channel requests.

<<Anchor(SRPrepTasks)>>

== SR Prep Tasks - To Be Scheduled ==
Line 55: Line 62:
  * Cu O-rings for pod (two sizes)   * --(Cu O-rings for pod (two sizes).)--
Line 61: Line 68:

<<Anchor(SRPrepTasks)>>

== SR Prep Tasks - To Be Scheduled ==
 * Get geophone circuit boards from Okutomi-san.
 * Find fourth feedthrough
Line 66: Line 71:
 * Install new jack receptacles (in SR3 area, second floor) on load gauge adapter (SR2 area, second floor).
Line 71: Line 75:
 * Get geophone circuit boards from Okutomi-san.
 *

VIS Type B SR Near Term To-Do List

Archived To-Do Items

Every Week

Coming Weeks

Preparation for SR Installation

Every Week

Facilities

  • Vacuum and roll floor.
  • Wipe ladders.
  • Tidy tools, parts.
  • Get stuff from ../WishList

2018-01-15

  • Cable RM OSEMs to rack.
  • Setup QPD and do temporary cables to rack.
  • Do TFs from RM OSEMS to OL pitch/roll.
  • Make IM OSEMs.
  • Install load gauge adapter.
  • Lift IM/RM/SR with LGA, check/adjust total mass and pitch/yaw balance.
  • Test IM picos.

2018-01-22

  • Crane in BF.
  • Hook IM.
  • Route cables via flying saucer up to under BF.
  • Recheck total mass and pitch/roll balance.
  • Check BF yaw pico.

2018-01-28

  • Install IRM.
  • Adjust IM OSEMs.
  • Cable IM OSEMs.
  • Do TFs from IM OSEMs to IM OSEMs, OL pitch/yaw.
  • Install pre-calculated BF trim mass.
  • Lift
  • Find in-vac cables:
    • 1 x Type 3-2m
    • 5 x Type 1-2m
  • Set up SR2 rack
    • Get more 1-m power cables and connect up remaining boxes.
    • Run LAN and power cables for stepper drivers.
  • Review Shoda-san's Guardian.
  • Decide if we're really going to renumber IP channels.
  • Review DIO stuff.
  • Review SR2 model (especially screens, macro text file).
  • Review DAC channel requests.

SR Prep Tasks - To Be Scheduled

  • Find out (from Takahashi-san) specifications for geophone pod items:
    • Screws for pod (cap-neck and neck-body).
    • Cu O-rings for pod (two sizes).

    • Viton O-ring for under geophone.
    • Screws for immobilizing geophone (M4?).
    • Screws for geophone to interface plate.
    • Screws for interface plate to PI.
  • Find or order geophone items.
  • Get geophone circuit boards from Okutomi-san.
  • Find fourth feedthrough
  • Hassle Miyo-kun for stepper drivers.
  • Finish mass budget for SR2/SR3/SRM (Fabian) - mostly done.
  • Design final SF ballast masses (Fabian).
  • Get safety bars moved.
  • Get air hose connection moved.