== 2017-12-11 == * --(Double check prism heights.)-- * --(Do mirror gluing.)-- * --(Check mirror gluing.)-- * Assemble SR2 IP. * --(Hassle Miyo-kun for pico driver.)-- * --(Set up for testing IP with pico driver.)-- * --(Make pico cable.)-- * --(Glue Misumi plug in movable mass (also glue remaining disks in IM flags).)-- * Assemble IP. * Test IP picos. * --(Weigh BF.)-- * --(Find accessories.)-- * --(Do weighing.)-- * Find in-vac cables: * --(2 x Type 3-6m )-- * 1 x Type 3-2m * --(4)-- 3 x Type 4-1.5m * 5 x Type 1-2m * --(7 x Type 2-2m)-- * --(Set up SR2 rack)-- * --(Get ADC/DAC/DIO cards)-- * --(Get cables/cards for SR2)-- * --(Get BIO white cables x 10)-- * --(Hassle Miyakawa/Yamamoto to connect rack to DC power, Internet, etc.)-- * Get SR2 real-time model running (Yamamoto-san). * Do inventory of ballast masses. * Adjust verticality of assembly frame; center and immobilize optical table. * --(Find and attach feedthroughs.)-- * --(Find circuit boards for geophones)-- (Okutomi-san says we have 5 free plus 5 tied up in his experiment till Feb-Mar 2018.) * --(Check if they have sockets soldered on.)-- (Yes.) * --(Check if they come with hex posts.)-- (Yes.) * Find out (from Takahashi-san) specifications for geophone pod items: * Screws for pod (cap-neck and neck-body). * Cu O-rings for pod (two sizes) * Viton O-ring for under geophone. * Screws for immobilizing geophone (M4?). * Screws for geophone to interface plate. * Screws for interface plate to PI. * Find or order geophone items. |
==== Plan for week of 3/5 ==== * See important pump down-related stuff at [[../ToDoBS]]. * Calibrate SF LVDT. * Cable SF FR. * Add SF cap. * Lift SF/... with LGA and check weight/balance. * Get SRM mushroom installed. * Start BF rebuild. |
Line 65: | Line 33: |
* Hassle Miyo-kun for stepper drivers. * Install new jack receptacles (in SR3 area, second floor) on load gauge adapter (SR2 area, second floor). |
* Review Shoda-san's Guardian. * Decide if we're really going to renumber IP channels. * Review DIO stuff. * Review SR2 model (especially screens, macro text file). * Review DAC channel requests. * Find out (from Takahashi-san) specifications for geophone pod items: * Screws for pod (cap-neck and neck-body). * Screws for geophone to interface plate. * Screws for interface plate to PI. * Find or order geophone items. * Get geophone circuit boards from Okutomi-san. * Find fourth feedthrough |
Line 71: | Line 49: |
* Get geophone circuit boards from Okutomi-san. * |
* Glue SR3. * Set up SR3 rack. * Set up SRM rack. * Rebuild two BFs. * Disassemble two top filters. * Rebuild three top filters. |
VIS Type B SR Near Term To-Do List
Preparation for SR Installation
Every Week
Facilities
- Vacuum and roll floor.
- Wipe ladders.
- Tidy tools, parts.
Get stuff from ../WishList
Plan for week of 3/5
See important pump down-related stuff at ../ToDoBS.
- Calibrate SF LVDT.
- Cable SF FR.
- Add SF cap.
- Lift SF/... with LGA and check weight/balance.
- Get SRM mushroom installed.
- Start BF rebuild.
SR Prep Tasks - To Be Scheduled
- Review Shoda-san's Guardian.
- Decide if we're really going to renumber IP channels.
- Review DIO stuff.
- Review SR2 model (especially screens, macro text file).
- Review DAC channel requests.
- Find out (from Takahashi-san) specifications for geophone pod items:
- Screws for pod (cap-neck and neck-body).
- Screws for geophone to interface plate.
- Screws for interface plate to PI.
- Find or order geophone items.
- Get geophone circuit boards from Okutomi-san.
- Find fourth feedthrough
- Finish mass budget for SR2/SR3/SRM (Fabian) - mostly done.
- Design final SF ballast masses (Fabian).
- Get safety bars moved.
- Get air hose connection moved.
- Glue SR3.
- Set up SR3 rack.
- Set up SRM rack.
- Rebuild two BFs.
- Disassemble two top filters.
- Rebuild three top filters.