== 2017-12-11 ==
 * --(Double check prism heights.)--
 * --(Do mirror gluing.)--
 * --(Check mirror gluing.)--
 * Assemble SR2 IP.
  * --(Hassle Miyo-kun for pico driver.)--
  * --(Set up for testing IP with pico driver.)--
  * --(Make pico cable.)--
  * --(Glue Misumi plug in movable mass (also glue remaining disks in IM flags).)--
  * Assemble IP.
  * Test IP picos.
 * --(Weigh BF.)--
  * --(Find accessories.)--
  * --(Do weighing.)--
 * Find in-vac cables:
  * --(2 x Type 3-6m )--
  * 1 x Type 3-2m
  * --(4)-- 3 x Type 4-1.5m
  * 5 x Type 1-2m
  * --(7 x Type 2-2m)--
 * --(Set up SR2 rack)--
  * --(Get ADC/DAC/DIO cards)--
  * --(Get cables/cards for SR2)--
  * --(Get BIO white cables x 10)--
  * --(Hassle Miyakawa/Yamamoto to connect rack to DC power, Internet, etc.)--
  * Get SR2 real-time model running (Yamamoto-san).
 * Do inventory of ballast masses.
 * Adjust verticality of assembly frame; center and immobilize optical table.
 * --(Find and attach feedthroughs.)--
 * --(Find circuit boards for geophones)-- (Okutomi-san says we have 5 free plus 5 tied up in his experiment till Feb-Mar 2018.)
  * --(Check if they have sockets soldered on.)-- (Yes.)
  * --(Check if they come with hex posts.)-- (Yes.)
 * Find out (from Takahashi-san) specifications for geophone pod items:
  * Screws for pod (cap-neck and neck-body).
  * Cu O-rings for pod (two sizes)
  * Viton O-ring for under geophone.
  * Screws for immobilizing geophone (M4?).
  * Screws for geophone to interface plate.
  * Screws for interface plate to PI.
 * Find or order geophone items.
==== Plan for week of 4/16 ====
 * Move SF and BF for SRM out of the way.
 * Check results of gluing.
 * Build 1xRM
 * Calibrate OSEMs.
 * Start SR3 Hang
  * Reset assembly frame crossbars to correct heights.
  * Center the optical table.
  * Align the assembly frame vertically.
  * Install IM ring and IM.
  * Hang optic.
  * Hang RM.
  * Cable RM OSEMs.

==== Plan for week of 4/23 ====
 * Clean parts (cable clamp bases, etc, etc; Hirata-san).
 * Observe KAGRA Phase 1 operations, assist if problems arise.
 * Continue SR3 hang.
Line 65: Line 43:
 * Hassle Miyo-kun for stepper drivers.
 * Install new jack receptacles (in SR3 area, second floor) on load gauge adapter (SR2 area, second floor).
 * Review Shoda-san's Guardian.
 * Review DIO stuff.
 * Review DAC channel requests.
 * Find out (from Takahashi-san) specifications for geophone pod items:
  * Screws for pod (cap-neck and neck-body).
  * Screws for geophone to interface plate.
  * Screws for interface plate to PI.
 * Find or order geophone items.
 * Get geophone circuit boards from Okutomi-san.
 * Find fourth feedthrough
Line 71: Line 57:
 * Get geophone circuit boards from Okutomi-san.
 *
 * Glue SR3.
 * Disassemble two top filters.
 * Rebuild three top filters.

VIS Type B SR Near Term To-Do List

Archived To-Do Items

Every Week

Coming Weeks

Preparation for SR Installation

Every Week

Facilities

  • Vacuum and roll floor.
  • Wipe ladders.
  • Tidy tools, parts.
  • Get stuff from ../WishList

Plan for week of 4/16

  • Move SF and BF for SRM out of the way.
  • Check results of gluing.
  • Build 1xRM
  • Calibrate OSEMs.
  • Start SR3 Hang
    • Reset assembly frame crossbars to correct heights.
    • Center the optical table.
    • Align the assembly frame vertically.
    • Install IM ring and IM.
    • Hang optic.
    • Hang RM.
    • Cable RM OSEMs.

Plan for week of 4/23

  • Clean parts (cable clamp bases, etc, etc; Hirata-san).
  • Observe KAGRA Phase 1 operations, assist if problems arise.
  • Continue SR3 hang.

SR Prep Tasks - To Be Scheduled

  • Review Shoda-san's Guardian.
  • Review DIO stuff.
  • Review DAC channel requests.
  • Find out (from Takahashi-san) specifications for geophone pod items:
    • Screws for pod (cap-neck and neck-body).
    • Screws for geophone to interface plate.
    • Screws for interface plate to PI.
  • Find or order geophone items.
  • Get geophone circuit boards from Okutomi-san.
  • Find fourth feedthrough
  • Finish mass budget for SR2/SR3/SRM (Fabian) - mostly done.
  • Design final SF ballast masses (Fabian).
  • Get safety bars moved.
  • Get air hose connection moved.
  • Glue SR3.
  • Disassemble two top filters.
  • Rebuild three top filters.