2467
Comment:
|
3251
|
Deletions are marked like this. | Additions are marked like this. |
Line 13: | Line 13: |
=== Facilities === | ==== Facilities ==== |
Line 20: | Line 20: |
== Coming Weeks == | |
Line 21: | Line 22: |
== 2017-12-11 == * --(Double check prism heights.)-- * --(Do mirror gluing.)-- * --(Check mirror gluing.)-- * Assemble SR2 IP. * --(Hassle Miyo-kun for pico driver.)-- * --(Set up for testing IP with pico driver.)-- * --(Make pico cable.)-- * --(Glue Misumi plug in movable mass (also glue remaining disks in IM flags).)-- * Assemble IP. * Test IP picos. * --(Weigh BF.)-- * --(Find accessories.)-- * --(Do weighing.)-- * Find in-vac cables: * --(2 x Type 3-6m )-- * 1 x Type 3-2m * --(4)-- 3 x Type 4-1.5m * 5 x Type 1-2m * --(7 x Type 2-2m)-- * --(Set up SR2 rack)-- * --(Get ADC/DAC/DIO cards)-- * --(Get cables/cards for SR2)-- * --(Get BIO white cables x 10)-- * --(Hassle Miyakawa/Yamamoto to connect rack to DC power, Internet, etc.)-- * Get SR2 real-time model running (Yamamoto-san). * Do inventory of ballast masses. * Adjust verticality of assembly frame; center and immobilize optical table. * --(Find and attach feedthroughs.)-- * --(Find circuit boards for geophones)-- (Okutomi-san says we have 5 free plus 5 tied up in his experiment till Feb-Mar 2018.) * --(Check if they have sockets soldered on.)-- (Yes.) * --(Check if they come with hex posts.)-- (Yes.) * Find out (from Takahashi-san) specifications for geophone pod items: * Screws for pod (cap-neck and neck-body). * Cu O-rings for pod (two sizes) * Viton O-ring for under geophone. * Screws for immobilizing geophone (M4?). * Screws for geophone to interface plate. * Screws for interface plate to PI. * Find or order geophone items. |
=== 2018-06-18 === ==== Main Sequence ==== * Tweak BF total trim masses. * SF/... TFs. * Add budgeted ballast mass to SF (or remove stuff!). * Cable, test SF FR. * Grab and configure a picomotor driver as SR2_BF 10.68.150.25. * Check JGWDoc electronic item lists are up to date. ==== F0/LBB Stuff ==== * Finish tuning F0 in PI #3. * Replace ceramic thrust bearing in PI #3 with metal one (do PI #1 as well if time). * Characterize more blades? * Park PI #1 in SR3 AF. * Crane PI #3 behind SR3. * Crane PI #1 to factory area. ==== Software ==== * Review/improve macro file fixes for split models; write klog; submit changes to SVN. * Install AC bandpass filters in SR3 WD filters. * Check coil filter gains for compensation of magnet polarities (confirm SR3 IM, set and confirm SR2 and SR3 TM). * Create software stepper drivers for SR3 and SRM and link to from STEP_MASTER.adl screen. === 2018-06-25 === ==== Main Sequence ==== ==== F0/LBB Stuff ==== * Build/tune F0 in PI #1. * Finish tuning PI #3. * Wrap PI #1. * Crane PI #1 to SR2 AF. * Crane PI #3 into SR3 AF. ==== Software/Remote ==== === 2018-07-02 === ==== Main Sequence ==== ==== F0/LBB Stuff ==== === 2018-07-09 === ==== Main Sequence ==== ==== F0/LBB Stuff ==== === 2018-07-16 === ==== Main Sequence ==== ==== F0/LBB Stuff ==== === 2018-07-23 === ==== Main Sequence ==== ==== F0/LBB Stuff ==== |
Line 65: | Line 76: |
* Hassle Miyo-kun for stepper drivers. * Install new jack receptacles (in SR3 area, second floor) on load gauge adapter (SR2 area, second floor). * Finish mass budget for SR2/SR3/SRM (Fabian) - mostly done. * Design final SF ballast masses (Fabian). * Get safety bars moved. * Get air hose connection moved. * Get geophone circuit boards from Okutomi-san. * |
=== Tunnel === * Get independent power supply for SR3 so SR2 can be powered back up. * Remove SR3 tank lid, crane LBB rings to top of lower half of the tank, clamp in position. * Check SR2, SR3 TM coil gains for magnet polarity compensation. * Calibrate last six IM OSEMs. * Make three in-air stepper splitter cables for SR2, SR3 and SRM. [done?] * Rebuild filter in PI #1. * Install clamps on PI #1. * Install geophone plates on PI #3. * Install geophone plates on PI #1. * Install correct IP in PI #2. * Rebuild filter in PI #2. * Install clamps on PI #2. * Install LBB blade units on PI #2. * Install geophone plates on PI #2. === Mitaka or remotely === * Make three in-air stepper splitter cables for SR2, SR3 and SRM. [done?] * (Continue to) soak the sapphire prisms off the dummy BS for reuse on the SRM metal mass. * Set up SR2 Guardian. * Install damping filters for SR2. * Review Shoda-san's Guardian. * Review DIO stuff. * Review DAC channel requests. * Set up SR2 and SR3 Guardian. * Create Python drivers for SR3_IM and SR3_BF picos and link to them from Mio-kun's PICO_MASTER.adl MEDM screen. * Install damping filters for SR2. * Do buoyancy calculation (see LIGO-T1100616). * Split SRx real-time models? === Ordering === See ../WishList . |
VIS Type B SR Near Term To-Do List
Preparation for SR Installation
Every Week
Facilities
- Vacuum and roll floor.
- Wipe ladders.
- Tidy tools, parts.
Get stuff from ../WishList
Coming Weeks
2018-06-18
Main Sequence
- Tweak BF total trim masses.
- SF/... TFs.
- Add budgeted ballast mass to SF (or remove stuff!).
- Cable, test SF FR.
- Grab and configure a picomotor driver as SR2_BF 10.68.150.25.
- Check JGWDoc electronic item lists are up to date.
F0/LBB Stuff
- Finish tuning F0 in PI #3.
- Replace ceramic thrust bearing in PI #3 with metal one (do PI #1 as well if time).
- Characterize more blades?
- Park PI #1 in SR3 AF.
- Crane PI #3 behind SR3.
- Crane PI #1 to factory area.
Software
- Review/improve macro file fixes for split models; write klog; submit changes to SVN.
- Install AC bandpass filters in SR3 WD filters.
- Check coil filter gains for compensation of magnet polarities (confirm SR3 IM, set and confirm SR2 and SR3 TM).
- Create software stepper drivers for SR3 and SRM and link to from STEP_MASTER.adl screen.
2018-06-25
Main Sequence
F0/LBB Stuff
- Build/tune F0 in PI #1.
- Finish tuning PI #3.
- Wrap PI #1.
- Crane PI #1 to SR2 AF.
- Crane PI #3 into SR3 AF.
Software/Remote
2018-07-02
Main Sequence
F0/LBB Stuff
2018-07-09
Main Sequence
F0/LBB Stuff
2018-07-16
Main Sequence
F0/LBB Stuff
2018-07-23
Main Sequence
F0/LBB Stuff
SR Prep Tasks - To Be Scheduled
Tunnel
- Get independent power supply for SR3 so SR2 can be powered back up.
- Remove SR3 tank lid, crane LBB rings to top of lower half of the tank, clamp in position.
- Check SR2, SR3 TM coil gains for magnet polarity compensation.
- Calibrate last six IM OSEMs.
- Make three in-air stepper splitter cables for SR2, SR3 and SRM. [done?]
- Rebuild filter in PI #1.
- Install clamps on PI #1.
- Install geophone plates on PI #3.
- Install geophone plates on PI #1.
- Install correct IP in PI #2.
- Rebuild filter in PI #2.
- Install clamps on PI #2.
- Install LBB blade units on PI #2.
- Install geophone plates on PI #2.
Mitaka or remotely
- Make three in-air stepper splitter cables for SR2, SR3 and SRM. [done?]
- (Continue to) soak the sapphire prisms off the dummy BS for reuse on the SRM metal mass.
- Set up SR2 Guardian.
- Install damping filters for SR2.
- Review Shoda-san's Guardian.
- Review DIO stuff.
- Review DAC channel requests.
- Set up SR2 and SR3 Guardian.
- Create Python drivers for SR3_IM and SR3_BF picos and link to them from Mio-kun's PICO_MASTER.adl MEDM screen.
- Install damping filters for SR2.
- Do buoyancy calculation (see LIGO-T1100616).
- Split SRx real-time models?
Ordering
See ../WishList .