Line 22: Line 22:
 * Assemble SR2 IP.
  * Final assembly.
  * Test IP picos.
 * --(Assemble SR2 IP.)--
  * --(Final assembly.)--
  * --(Test IP picos.)--
Line 32: Line 32:
 * --(Calibrate BF LVDT.)--
Line 33: Line 34:
 * Adjust verticality of assembly frame; center and immobilize optical table.  * Assembly frame stuff:
  * --(Center and immobilize optical table.)--
  * --(Adjust verticality of assembly frame.)--
  * --(Remove internal crossbars for SF and BF.)--
  * --(Adjust external crossbar heights.)--
Line 36: Line 41:
  * Cu O-rings for pod (two sizes)   * --(Cu O-rings for pod (two sizes).)--

VIS Type B SR Near Term To-Do List

Archived To-Do Items

Every Week

Coming Weeks

Preparation for SR Installation

Every Week

Facilities

  • Vacuum and roll floor.
  • Wipe ladders.
  • Tidy tools, parts.
  • Get stuff from ../WishList

2017-12-18

  • Assemble SR2 IP.

    • Final assembly.

    • Test IP picos.

  • Find in-vac cables:
    • 1 x Type 3-2m
    • 5 x Type 1-2m
  • Set up SR2 rack
    • Get more 1-m power cables and connect up remaining boxes.
    • Run LAN and power cables for stepper drivers.
    • Debug SR2 real-time model (Yamamoto-san).
  • Calibrate BF LVDT.

  • Do inventory of ballast masses.
  • Assembly frame stuff:
    • Center and immobilize optical table.

    • Adjust verticality of assembly frame.

    • Remove internal crossbars for SF and BF.

    • Adjust external crossbar heights.

  • Find out (from Takahashi-san) specifications for geophone pod items:
    • Screws for pod (cap-neck and neck-body).
    • Cu O-rings for pod (two sizes).

    • Viton O-ring for under geophone.
    • Screws for immobilizing geophone (M4?).
    • Screws for geophone to interface plate.
    • Screws for interface plate to PI.
  • Find or order geophone items.
  • Install new jack receptacles (in SR3 area, second floor) on load gauge adapter (SR2 area, second floor).
  • Review Shoda-san's Guardian.
  • Review DIO stuff.
  • Review SR2 model (especially screens, macro text file).
  • Review DAC channel requests.

SR Prep Tasks - To Be Scheduled

  • Get geophone circuit boards from Okutomi-san.
  • Find fourth feedthrough
  • Hassle Miyo-kun for stepper drivers.
  • Finish mass budget for SR2/SR3/SRM (Fabian) - mostly done.
  • Design final SF ballast masses (Fabian).
  • Get safety bars moved.
  • Get air hose connection moved.