Differences between revisions 3 and 21 (spanning 18 versions)
Revision 3 as of 2017-11-09 12:39:15
Size: 2983
Editor: MarkBarton
Comment:
Revision 21 as of 2017-12-15 13:49:20
Size: 2467
Editor: MarkBarton
Comment:
Deletions are marked like this. Additions are marked like this.
Line 21: Line 21:
== 2017-11-06 ==
 * Confirm location of sapphire prisms.
 * Bring SR2 into tunnel.
 * Find mirror gluing items.
  * Mirror
  * Mirror box
  * Prisms
  * Secondary prisms
  * Magnets
  * Magnet bases
  * Prism micrometer stages
  * Prism jigs
  * Magnet jigs
  * Balance
  * Stirrers
  * Mixing dishes
  * Lenses for inspecting scribe lines
  * Procedure document.
  * EP30
  * Glass beads
 * Rehearse mirror gluing.
== 2017-12-11 ==
 * --(Double check prism heights.)--
 * --(Do mirror gluing.)--
 * --(Check mirror gluing.)--
 * Assemble SR2 IP.
  * --(Hassle Miyo-kun for pico driver.)--
  * --(Set up for testing IP with pico driver.)--
  * --(Make pico cable.)--
  * --(Glue Misumi plug in movable mass (also glue remaining disks in IM flags).)--
  * Assemble IP.
  * Test IP picos.
 * --(Weigh BF.)--
  * --(Find accessories.)--
  * --(Do weighing.)--
 * Find in-vac cables:
  * --(2 x Type 3-6m )--
  * 1 x Type 3-2m
  * --(4)-- 3 x Type 4-1.5m
  * 5 x Type 1-2m
  * --(7 x Type 2-2m)--
 * --(Set up SR2 rack)--
  * --(Get ADC/DAC/DIO cards)--
  * --(Get cables/cards for SR2)--
  * --(Get BIO white cables x 10)--
  * --(Hassle Miyakawa/Yamamoto to connect rack to DC power, Internet, etc.)--
  * Get SR2 real-time model running (Yamamoto-san).
 * Do inventory of ballast masses.
 * Adjust verticality of assembly frame; center and immobilize optical table.
 * --(Find and attach feedthroughs.)--
 * --(Find circuit boards for geophones)-- (Okutomi-san says we have 5 free plus 5 tied up in his experiment till Feb-Mar 2018.)
  * --(Check if they have sockets soldered on.)-- (Yes.)
  * --(Check if they come with hex posts.)-- (Yes.)
 * Find out (from Takahashi-san) specifications for geophone pod items:
  * Screws for pod (cap-neck and neck-body).
  * Cu O-rings for pod (two sizes)
  * Viton O-ring for under geophone.
  * Screws for immobilizing geophone (M4?).
  * Screws for geophone to interface plate.
  * Screws for interface plate to PI.
 * Find or order geophone items.
Line 45: Line 64:
== SR Prep Tasks ==
=== Design/Purchasing ===
 * Do rough mass budget for SR2/SR3/SRM.
== SR Prep Tasks - To Be Scheduled ==
 * Hassle Miyo-kun for stepper drivers.
 * Install new jack receptacles (in SR3 area, second floor) on load gauge adapter (SR2 area, second floor).
 * Finish mass budget for SR2/SR3/SRM (Fabian) - mostly done.
Line 49: Line 69:
 * Confrim location of sapphire prisms.


==== Order now ====
 * Bread boards for SR -> Orderd. delivery date:10/18-20
 * Include installation work in the contract
 * Total budget = 5MJPY
 * PEEK collet for "Small hexagon"(cable clamp) -> need modification.

==== Need simple design changes ====
 * SUS wires(3 types) for the LBB
  * Change the length -> Orderd. delivery date:10/
 * Receptacles for Bread board damper
  * There is a mistake in the PROMEC drawing.
  * Hirata-san will make a new 2D drawing
 * IM wire clamps for SR
  * Need to change the height -> watiting second quote.
 * SR assembly frame -> Ordered. delivery date:9/27-29
  * Mark is checking the design from Fabian
  * We should order the parts necessary to modify the BS assembly frame to the SR2 assembly frame

==== Need Fabian's input ====
 * Cable clamps for BF,SF and PI -> 方式を決める
  * Design change for the PI clamps, because the SR PIs are NIKHEF ones.
 * Ballast masses for BF and SF
 * 製作に2週間程度
 * 10月頭にTop Filterの最適荷重を実測。それに合わせて発注。それまでにデザインは用意しておく。
  * 測定に必要な物品の準備 -> 月曜日に高橋さんと相談

==== Need more discussion/checks ====
 * Blade spring assembly for LBB
  * Check the load of the LBB and decide the design load of the springs
  * Correct the length
  * Scale the width of the current blades to design the new blades -> 高橋さんと相談
   * SR用LBBの重さを確認
 * Bread board damper rings
  * Need to check whether we can put a full ring into the chamber from the side flanges or not. -> need modification

=== Electronics ===
 * Get cables/cards for SR3:
  * 5 DSub-37 cables (tent)
  * 5 DSub-15M to DSub-9M adapter cables (tent)
  * 3 DIO cards (tent)
  * 2 DSub-9 FF gender benders (for LVDTs)
  * extra ADC card(s)?
  * extra DAC card(s)?
  * BNC-LEMO adapter (for LVDTs)
  * etc
 * Get safety bars moved.
 * Get air hose connection moved.
 * Get geophone circuit boards from Okutomi-san.
 *

VIS Type B SR Near Term To-Do List

Archived To-Do Items

Every Week

Coming Weeks

Preparation for SR Installation

Every Week

Facilities

  • Vacuum and roll floor.
  • Wipe ladders.
  • Tidy tools, parts.
  • Get stuff from ../WishList

2017-12-11

  • Double check prism heights.

  • Do mirror gluing.

  • Check mirror gluing.

  • Assemble SR2 IP.
    • Hassle Miyo-kun for pico driver.

    • Set up for testing IP with pico driver.

    • Make pico cable.

    • Glue Misumi plug in movable mass (also glue remaining disks in IM flags).

    • Assemble IP.
    • Test IP picos.
  • Weigh BF.

    • Find accessories.

    • Do weighing.

  • Find in-vac cables:
    • 2 x Type 3-6m

    • 1 x Type 3-2m
    • 4 3 x Type 4-1.5m

    • 5 x Type 1-2m
    • 7 x Type 2-2m

  • Set up SR2 rack

    • Get ADC/DAC/DIO cards

    • Get cables/cards for SR2

    • Get BIO white cables x 10

    • Hassle Miyakawa/Yamamoto to connect rack to DC power, Internet, etc.

    • Get SR2 real-time model running (Yamamoto-san).
  • Do inventory of ballast masses.
  • Adjust verticality of assembly frame; center and immobilize optical table.
  • Find and attach feedthroughs.

  • Find circuit boards for geophones (Okutomi-san says we have 5 free plus 5 tied up in his experiment till Feb-Mar 2018.)

    • Check if they have sockets soldered on. (Yes.)

    • Check if they come with hex posts. (Yes.)

  • Find out (from Takahashi-san) specifications for geophone pod items:
    • Screws for pod (cap-neck and neck-body).
    • Cu O-rings for pod (two sizes)
    • Viton O-ring for under geophone.
    • Screws for immobilizing geophone (M4?).
    • Screws for geophone to interface plate.
    • Screws for interface plate to PI.
  • Find or order geophone items.

SR Prep Tasks - To Be Scheduled

  • Hassle Miyo-kun for stepper drivers.
  • Install new jack receptacles (in SR3 area, second floor) on load gauge adapter (SR2 area, second floor).
  • Finish mass budget for SR2/SR3/SRM (Fabian) - mostly done.
  • Design final SF ballast masses (Fabian).
  • Get safety bars moved.
  • Get air hose connection moved.
  • Get geophone circuit boards from Okutomi-san.

KAGRA/Subgroups/VIS/TypeB/ToDoSR (last edited 2019-01-04 15:25:56 by MarkBarton)