2983
Comment:
|
3515
|
Deletions are marked like this. | Additions are marked like this. |
Line 13: | Line 13: |
=== Facilities === | ==== Facilities ==== |
Line 15: | Line 15: |
* Wipe ladders. | * Wipe ladders, assembly frame. |
Line 20: | Line 20: |
== Coming Weeks == | |
Line 21: | Line 22: |
== 2017-11-06 == * Confirm location of sapphire prisms. * Bring SR2 into tunnel. * Find mirror gluing items. * Mirror * Mirror box * Prisms * Secondary prisms * Magnets * Magnet bases * Prism micrometer stages * Prism jigs * Magnet jigs * Balance * Stirrers * Mixing dishes * Lenses for inspecting scribe lines * Procedure document. * EP30 * Glass beads * Rehearse mirror gluing. |
=== 2018-07-09 === ==== Main Sequence ==== * --(Get studs for arc weights.)-- * --(Get laser level, preferably the red Tajita one.)-- * --(Finish in-vacuum cabling.)-- * --(Correct flipped connections in SR3 PI LVDTs.)-- * Put up second safety bar. * Retrieve BNC-Lemo cable from Nakano-kun. * Tune PI LVDT driver box. * --(Plug in spare sat amps.)-- * Set up optical lever. * Check/restore alignment of payload, especially optic pitch. * Install and cable geophones. * Install arc weights. * Tune IP. * Make three in-air stepper splitter cables for SR2, SR3 and SRM. * Calibrate PI LVDTs and FRs. * Cabling, testing, TFs. ==== F0/LBB Stuff ==== * --(Finalize PI #1 for SR2; crane into SR2 cleanbooth.)-- * --(Remove SR3 tank lid, crane LBB rings to top of lower half of the tank, clamp in position.)-- * Set tank jacks to nominal height. * Clear space for PI #2 (SRM) work. ==== Software Etc ==== * --(Check S-numbers of BS sat amps and SR sat amps returned to Mozumi, and update electronic items lists.)-- * Review/improve macro file fixes for split models; write klog; submit changes to SVN. * Get at least one BIO Converter chassis fully connected (CONTEC BIO card, WD and stepper motor chassis) for implementation and test of stepper motor reset function. * Write generic Type B Guardian; make BS and SR3 inherit from it; make analog WD optional for now (all suspensions will get them eventually). * Create software stepper drivers for SR3 and SRM and link to them from STEP_MASTER.adl screen. === 2018-07-16 === ==== Main Sequence ==== * Lock suspension. * Crane into tank. * Unlock suspension. * Rearrange cables. * Test. ==== F0/LBB Stuff ==== * Install correct IP in PI #2. * Crane PI #2 to second floor. * Rebuild top filter of PI #2. |
Line 45: | Line 68: |
== SR Prep Tasks == === Design/Purchasing === * Do rough mass budget for SR2/SR3/SRM. * Design final SF ballast masses (Fabian). * Confrim location of sapphire prisms. |
== SR Prep Tasks - To Be Scheduled == === Tunnel === * Install, cable SR3 PI yaw stepper. * Correct flipped connections in SR2 PI LVDTs. * Correct flipped connections in SRM PI LVDTs. * Grab and configure a picomotor driver as SR2_BF 10.68.150.25. * Get independent power supply for SR3 so SR2 can be powered back up. * Check SR2, SR3 TM coil gains for magnet polarity compensation. * Calibrate last six IM OSEMs. * Rebuild filter in PI #1. * Install clamps on PI #1. * Install geophone plates on PI #3. * Install geophone plates on PI #1. * Install correct IP in PI #2. * Rebuild filter in PI #2. * Install clamps on PI #2. * Install LBB blade units on PI #2. * Install geophone plates on PI #2. |
Line 51: | Line 87: |
=== Mitaka or remotely === * Make three in-air stepper splitter cables for SR2, SR3 and SRM. [done?] * (Continue to) soak the sapphire prisms off the dummy BS for reuse on the SRM metal mass. * Set up SR2 Guardian. * Install damping filters for SR2. * Review Shoda-san's Guardian. * Review DIO stuff. * Review DAC channel requests. * Set up SR2 Guardian. * Install damping filters for SR2. * Split SRx real-time models? |
|
Line 52: | Line 99: |
==== Order now ==== * Bread boards for SR -> Orderd. delivery date:10/18-20 * Include installation work in the contract * Total budget = 5MJPY * PEEK collet for "Small hexagon"(cable clamp) -> need modification. ==== Need simple design changes ==== * SUS wires(3 types) for the LBB * Change the length -> Orderd. delivery date:10/ * Receptacles for Bread board damper * There is a mistake in the PROMEC drawing. * Hirata-san will make a new 2D drawing * IM wire clamps for SR * Need to change the height -> watiting second quote. * SR assembly frame -> Ordered. delivery date:9/27-29 * Mark is checking the design from Fabian * We should order the parts necessary to modify the BS assembly frame to the SR2 assembly frame ==== Need Fabian's input ==== * Cable clamps for BF,SF and PI -> 方式を決める * Design change for the PI clamps, because the SR PIs are NIKHEF ones. * Ballast masses for BF and SF * 製作に2週間程度 * 10月頭にTop Filterの最適荷重を実測。それに合わせて発注。それまでにデザインは用意しておく。 * 測定に必要な物品の準備 -> 月曜日に高橋さんと相談 ==== Need more discussion/checks ==== * Blade spring assembly for LBB * Check the load of the LBB and decide the design load of the springs * Correct the length * Scale the width of the current blades to design the new blades -> 高橋さんと相談 * SR用LBBの重さを確認 * Bread board damper rings * Need to check whether we can put a full ring into the chamber from the side flanges or not. -> need modification === Electronics === * Get cables/cards for SR3: * 5 DSub-37 cables (tent) * 5 DSub-15M to DSub-9M adapter cables (tent) * 3 DIO cards (tent) * 2 DSub-9 FF gender benders (for LVDTs) * extra ADC card(s)? * extra DAC card(s)? * BNC-LEMO adapter (for LVDTs) * etc |
=== Ordering === See ../WishList . |
VIS Type B SR Near Term To-Do List
Preparation for SR Installation
Every Week
Facilities
- Vacuum and roll floor.
- Wipe ladders, assembly frame.
- Tidy tools, parts.
Get stuff from ../WishList
Coming Weeks
2018-07-09
Main Sequence
Get studs for arc weights.
Get laser level, preferably the red Tajita one.
Finish in-vacuum cabling.
Correct flipped connections in SR3 PI LVDTs.
- Put up second safety bar.
- Retrieve BNC-Lemo cable from Nakano-kun.
- Tune PI LVDT driver box.
Plug in spare sat amps.
- Set up optical lever.
- Check/restore alignment of payload, especially optic pitch.
- Install and cable geophones.
- Install arc weights.
- Tune IP.
- Make three in-air stepper splitter cables for SR2, SR3 and SRM.
- Calibrate PI LVDTs and FRs.
- Cabling, testing, TFs.
F0/LBB Stuff
Finalize PI #1 for SR2; crane into SR2 cleanbooth.
Remove SR3 tank lid, crane LBB rings to top of lower half of the tank, clamp in position.
- Set tank jacks to nominal height.
- Clear space for PI #2 (SRM) work.
Software Etc
Check S-numbers of BS sat amps and SR sat amps returned to Mozumi, and update electronic items lists.
- Review/improve macro file fixes for split models; write klog; submit changes to SVN.
- Get at least one BIO Converter chassis fully connected (CONTEC BIO card, WD and stepper motor chassis) for implementation and test of stepper motor reset function.
- Write generic Type B Guardian; make BS and SR3 inherit from it; make analog WD optional for now (all suspensions will get them eventually).
- Create software stepper drivers for SR3 and SRM and link to them from STEP_MASTER.adl screen.
2018-07-16
Main Sequence
- Lock suspension.
- Crane into tank.
- Unlock suspension.
- Rearrange cables.
- Test.
F0/LBB Stuff
- Install correct IP in PI #2.
- Crane PI #2 to second floor.
- Rebuild top filter of PI #2.
SR Prep Tasks - To Be Scheduled
Tunnel
- Install, cable SR3 PI yaw stepper.
- Correct flipped connections in SR2 PI LVDTs.
- Correct flipped connections in SRM PI LVDTs.
- Grab and configure a picomotor driver as SR2_BF 10.68.150.25.
- Get independent power supply for SR3 so SR2 can be powered back up.
- Check SR2, SR3 TM coil gains for magnet polarity compensation.
- Calibrate last six IM OSEMs.
- Rebuild filter in PI #1.
- Install clamps on PI #1.
- Install geophone plates on PI #3.
- Install geophone plates on PI #1.
- Install correct IP in PI #2.
- Rebuild filter in PI #2.
- Install clamps on PI #2.
- Install LBB blade units on PI #2.
- Install geophone plates on PI #2.
Mitaka or remotely
- Make three in-air stepper splitter cables for SR2, SR3 and SRM. [done?]
- (Continue to) soak the sapphire prisms off the dummy BS for reuse on the SRM metal mass.
- Set up SR2 Guardian.
- Install damping filters for SR2.
- Review Shoda-san's Guardian.
- Review DIO stuff.
- Review DAC channel requests.
- Set up SR2 Guardian.
- Install damping filters for SR2.
- Split SRx real-time models?
Ordering
See ../WishList .