Differences between revisions 34 and 36 (spanning 2 versions)
Revision 34 as of 2018-01-18 19:04:39
Size: 3043
Editor: MarkBarton
Comment:
Revision 36 as of 2018-02-02 10:54:10
Size: 2032
Editor: MarkBarton
Comment:
Deletions are marked like this. Additions are marked like this.
Line 21: Line 21:
== 2018-01-15 ==
 * Set up SR2 rack
  * --(Get more 1-m power cables and connect up remaining boxes.)-- (No orange ones left - used yellow temporarily.)
  * Run LAN and power cables for stepper drivers.
 * --(Cable RM OSEMs to rack.)--
 * --(Setup QPD and cable to rack.)--
 * --(Fix links to OPLEVINF filter screen from chain screen.)--
 * --(Initialize gains and matrix elements for SR2 OL.)--
 * --(Wash parts for flying saucers.)--
 * Test nuts for flying saucers.
 * Order more nuts for flying saucers.
 * Add DRIVEALIGN button to overview screen.
 * --(Check sizes and in-stock numbers of screws for geophones.)--
  * 20 x M8*35 (need 3*16=48)
  * 35 x M8*30 (need 3*8=24)
  * 4 x Viton disks (need 4)
  * 123 M8 washers (need 3*24=72)
 * --(Do TFs from RM OSEMS to OL pitch/roll.)--
 * --(Make IM OSEMs.)--
 * --(Install load gauge adapter.)--
 * --(Lift IM/RM/SR with LGA, check/adjust total mass and pitch/yaw balance.)--
 * --(Crane in BF.)--
 * --(Install BF-IRM rods and top plate of IRM.)--
 * --(Install BF-IM rod with flying saucer.)--
 * --(Hook IM.)--
 * --(Route cables via flying saucer up to under BF.)--
== 2018-02-05 ==
 * Make in-air pico adapter cables.
 * Cable yaw pico and LVDT on new BF.
 * Calibrate LVDT.
 * Test IM picos and BF yaw pico.
 * Test FR.
 * Install ballast mass in BF.
 * Build IRM around IM.
Line 48: Line 30:
== 2018-01-22 ==
 * Debug keystone issue.
 * Adjust IM/RM/SR total mass and pitch/roll balance.
 * Test IM picos.
 * Prepare SR3 area for PI test.
 * Check BF yaw pico.

== 2018-01-28 ==
 * Install IRM.
== 2018-02-13 ==
 * Cable/test/adjust IM OSEMs.
 * Cable IM OSEMs.
Line 58: Line 34:
 * Cable IM OSEMs.
Line 61: Line 36:
 * Lift
==== Plan for week of 2/19 ====
 * Lift BF/... section and check total mass and balance.
 * Cable and test BF picos.
 * Add section of SS up to SF ring.
 * Bring in SF.
 * Add Cu segments to SF cap.
 * Hook BF/... section.
 * Route cables up to under SF.
 * Check/adjust total mass of BF/... section.
Line 63: Line 48:
 * Find in-vac cables:
  * 1 x Type 3-2m
  * 5 x Type 1-2m

<<Anchor(SRPrepTasks)>>

== SR Prep Tasks - To Be Scheduled ==
Line 71: Line 57:

<<Anchor(SRPrepTasks)>>

== SR Prep Tasks - To Be Scheduled ==
 * Replace temporary yellow DC power cables in SR2 rack with orange ones.
Line 78: Line 59:
  * --(Cu O-rings for pod (two sizes).)--
  * Viton O-ring for under geophone.
  * Screws for immobilizing geophone (M4?).
Line 86: Line 64:
 * Hassle Miyo-kun for stepper drivers.
Line 91: Line 68:
 * Install SR2 booth thermometer and edit macro.txt file.  * Glue SR3.
 * Set up SR3 rack.
 * Set up SRM rack.
 * Rebuild two BFs.
 * Disassemble two top filters.
 * Rebuild three top filters.

VIS Type B SR Near Term To-Do List

Archived To-Do Items

Every Week

Coming Weeks

Preparation for SR Installation

Every Week

Facilities

  • Vacuum and roll floor.
  • Wipe ladders.
  • Tidy tools, parts.
  • Get stuff from ../WishList

2018-02-05

  • Make in-air pico adapter cables.
  • Cable yaw pico and LVDT on new BF.
  • Calibrate LVDT.
  • Test IM picos and BF yaw pico.
  • Test FR.
  • Install ballast mass in BF.
  • Build IRM around IM.

2018-02-13

  • Cable/test/adjust IM OSEMs.
  • Cable IM OSEMs.
  • Adjust IM OSEMs.
  • Do TFs from IM OSEMs to IM OSEMs, OL pitch/yaw.
  • Install pre-calculated BF trim mass.

Plan for week of 2/19

  • Lift BF/... section and check total mass and balance.
  • Cable and test BF picos.
  • Add section of SS up to SF ring.
  • Bring in SF.
  • Add Cu segments to SF cap.
  • Hook BF/... section.
  • Route cables up to under SF.
  • Check/adjust total mass of BF/... section.

SR Prep Tasks - To Be Scheduled

  • Review Shoda-san's Guardian.
  • Decide if we're really going to renumber IP channels.
  • Review DIO stuff.
  • Review SR2 model (especially screens, macro text file).
  • Review DAC channel requests.
  • Find out (from Takahashi-san) specifications for geophone pod items:
    • Screws for pod (cap-neck and neck-body).
    • Screws for geophone to interface plate.
    • Screws for interface plate to PI.
  • Find or order geophone items.
  • Get geophone circuit boards from Okutomi-san.
  • Find fourth feedthrough
  • Finish mass budget for SR2/SR3/SRM (Fabian) - mostly done.
  • Design final SF ballast masses (Fabian).
  • Get safety bars moved.
  • Get air hose connection moved.
  • Glue SR3.
  • Set up SR3 rack.
  • Set up SRM rack.
  • Rebuild two BFs.
  • Disassemble two top filters.
  • Rebuild three top filters.

KAGRA/Subgroups/VIS/TypeB/ToDoSR (last edited 2019-01-04 15:25:56 by MarkBarton)