Line 21: Line 21:
== 2018-02-13 ==
 * Test FR.
 * Build IRM around IM.
 * Cable/test/adjust IM OSEMs.
 * Cable IM OSEMs.
 * Adjust IM OSEMs.
 * Do TFs from IM OSEMs to IM OSEMs, OL pitch/yaw.
 * Install pre-calculated BF trim mass.
==== Plan for week of 3/5 ====
 * --(Grab rack for SRM.)--
 * --(See important pump down-related stuff at [[../ToDoBS]].)--
 * --(Calibrate SF LVDT.)--
 * --(Cable/test SF FR.)--
 * --(Add SF cap.)--
 * Lift SF/... with LGA and check weight/balance.
 * Start BF rebuild.
Line 30: Line 30:
==== Plan for week of 2/19 ====
 * Lift BF/... section and check total mass and balance.
 * Cable and test BF picos.
 * Add section of SS up to SF ring.
 * Bring in SF.
 * Add Cu segments to SF cap.
 * Hook BF/... section.
 * Route cables up to under SF.
 * Check/adjust total mass of BF/... section.

 
==== Plan for week of 3/12 ====
 * Get SRM mushroom installed.
 * Set up SR3 and SRM racks.
 * Lay SR3 in-air cabling.

VIS Type B SR Near Term To-Do List

Archived To-Do Items

Every Week

Coming Weeks

Preparation for SR Installation

Every Week

Facilities

  • Vacuum and roll floor.
  • Wipe ladders.
  • Tidy tools, parts.
  • Get stuff from ../WishList

Plan for week of 3/5

  • Grab rack for SRM.

  • See important pump down-related stuff at ../ToDoBS.

  • Calibrate SF LVDT.

  • Cable/test SF FR.

  • Add SF cap.

  • Lift SF/... with LGA and check weight/balance.
  • Start BF rebuild.

Plan for week of 3/12

  • Get SRM mushroom installed.
  • Set up SR3 and SRM racks.
  • Lay SR3 in-air cabling.

SR Prep Tasks - To Be Scheduled

  • Review Shoda-san's Guardian.
  • Decide if we're really going to renumber IP channels.
  • Review DIO stuff.
  • Review SR2 model (especially screens, macro text file).
  • Review DAC channel requests.
  • Find out (from Takahashi-san) specifications for geophone pod items:
    • Screws for pod (cap-neck and neck-body).
    • Screws for geophone to interface plate.
    • Screws for interface plate to PI.
  • Find or order geophone items.
  • Get geophone circuit boards from Okutomi-san.
  • Find fourth feedthrough
  • Finish mass budget for SR2/SR3/SRM (Fabian) - mostly done.
  • Design final SF ballast masses (Fabian).
  • Get safety bars moved.
  • Get air hose connection moved.
  • Glue SR3.
  • Set up SR3 rack.
  • Set up SRM rack.
  • Rebuild two BFs.
  • Disassemble two top filters.
  • Rebuild three top filters.