Line 13: Line 13:
=== Facilities === ==== Facilities ====
Line 20: Line 20:
== Coming Weeks ==
Line 21: Line 22:
==== Plan for week of 3/5 ====
 * See important pump down-related stuff at [[../ToDoBS]].
 * Calibrate SF LVDT.
 * Cable SF FR.
 * Add SF cap.
 * Lift SF/... with LGA and check weight/balance.
 * Get SRM mushroom installed.
 * Start BF rebuild.

=== 2018-07-02 ===
==== Main Sequence ====
 * Install, cable PI yaw stepper.
 * Decide whether to install ballast mass inside SF.
 * Install SF ballast mass inside or on top, less reserve for cables.
 * Route cables around SF up to flying saucer and PI.
 * Finalize SF trim mass.
 * Install and cable geophones.
 * Install arc weights.
 * Unclamp assembly frame at IM level.
 * Unlock and center IP.
 * Calibrate horizontal LVDTs.
 * Make three in-air stepper splitter cables for SR2, SR3 and SRM.
 * Create software stepper drivers for SR3 and SRM and link to from STEP_MASTER.adl screen.

==== F0/LBB Stuff ====
 * Characterize more blades?
 * Build filter in PI #1 for SR2.
 * Remove SR3 tank lid, crane LBB rings to top of lower half of the tank, clamp in position.

==== Software ====
 * Review/improve macro file fixes for split models; write klog; submit changes to SVN.
 * Write generic Type B Guardian; make BS and SR3 inherit from it; make analog WD optional for now (all suspensions will get them eventually).
 * Create Python drivers for SR3_IM and SR3_BF steppers and link to them from Mio-kun's PICO_MASTER.adl MEDM screen.


=== 2018-07-09 ===
==== Main Sequence ====
==== F0/LBB Stuff ====
Line 33: Line 56:
=== Tunnel ===
 * Grab and configure a picomotor driver as SR2_BF 10.68.150.25.
 * Get independent power supply for SR3 so SR2 can be powered back up.
 * Check SR2, SR3 TM coil gains for magnet polarity compensation.
 * Calibrate last six IM OSEMs.
 * Rebuild filter in PI #1.
 * Install clamps on PI #1.
 * Install geophone plates on PI #3.
 * Install geophone plates on PI #1.
 * Install correct IP in PI #2.
 * Rebuild filter in PI #2.
 * Install clamps on PI #2.
 * Install LBB blade units on PI #2.
 * Install geophone plates on PI #2.

=== Mitaka or remotely ===
 * Make three in-air stepper splitter cables for SR2, SR3 and SRM. [done?]
 * (Continue to) soak the sapphire prisms off the dummy BS for reuse on the SRM metal mass.
 * Set up SR2 Guardian.
 * Install damping filters for SR2.
Line 34: Line 77:
 * Decide if we're really going to renumber IP channels.
Line 36: Line 78:
 * Review SR2 model (especially screens, macro text file).
Line 38: Line 79:
 * Find out (from Takahashi-san) specifications for geophone pod items:
  * Screws for pod (cap-neck and neck-body).
  * Screws for geophone to interface plate.
  * Screws for interface plate to PI.
 * Find or order geophone items.
 * Get geophone circuit boards from Okutomi-san.
 * Find fourth feedthrough
 * Finish mass budget for SR2/SR3/SRM (Fabian) - mostly done.
 * Design final SF ballast masses (Fabian).
 * Get safety bars moved.
 * Get air hose connection moved.
 * Glue SR3.
 * Set up SR3 rack.
 * Set up SRM rack.
 * Rebuild two BFs.
 * Disassemble two top filters.
 * Rebuild three top filters.
 * Set up SR2 Guardian.
 * Install damping filters for SR2.
 * Split SRx real-time models?

=== Ordering ===
See ../WishList .

VIS Type B SR Near Term To-Do List

Archived To-Do Items

Every Week

Coming Weeks

Preparation for SR Installation

Every Week

Facilities

  • Vacuum and roll floor.
  • Wipe ladders.
  • Tidy tools, parts.
  • Get stuff from ../WishList

Coming Weeks

2018-07-02

Main Sequence

  • Install, cable PI yaw stepper.
  • Decide whether to install ballast mass inside SF.
  • Install SF ballast mass inside or on top, less reserve for cables.
  • Route cables around SF up to flying saucer and PI.
  • Finalize SF trim mass.
  • Install and cable geophones.
  • Install arc weights.
  • Unclamp assembly frame at IM level.
  • Unlock and center IP.
  • Calibrate horizontal LVDTs.
  • Make three in-air stepper splitter cables for SR2, SR3 and SRM.
  • Create software stepper drivers for SR3 and SRM and link to from STEP_MASTER.adl screen.

F0/LBB Stuff

  • Characterize more blades?
  • Build filter in PI #1 for SR2.
  • Remove SR3 tank lid, crane LBB rings to top of lower half of the tank, clamp in position.

Software

  • Review/improve macro file fixes for split models; write klog; submit changes to SVN.
  • Write generic Type B Guardian; make BS and SR3 inherit from it; make analog WD optional for now (all suspensions will get them eventually).
  • Create Python drivers for SR3_IM and SR3_BF steppers and link to them from Mio-kun's PICO_MASTER.adl MEDM screen.

2018-07-09

Main Sequence

F0/LBB Stuff

SR Prep Tasks - To Be Scheduled

Tunnel

  • Grab and configure a picomotor driver as SR2_BF 10.68.150.25.
  • Get independent power supply for SR3 so SR2 can be powered back up.
  • Check SR2, SR3 TM coil gains for magnet polarity compensation.
  • Calibrate last six IM OSEMs.
  • Rebuild filter in PI #1.
  • Install clamps on PI #1.
  • Install geophone plates on PI #3.
  • Install geophone plates on PI #1.
  • Install correct IP in PI #2.
  • Rebuild filter in PI #2.
  • Install clamps on PI #2.
  • Install LBB blade units on PI #2.
  • Install geophone plates on PI #2.

Mitaka or remotely

  • Make three in-air stepper splitter cables for SR2, SR3 and SRM. [done?]
  • (Continue to) soak the sapphire prisms off the dummy BS for reuse on the SRM metal mass.
  • Set up SR2 Guardian.
  • Install damping filters for SR2.
  • Review Shoda-san's Guardian.
  • Review DIO stuff.
  • Review DAC channel requests.
  • Set up SR2 Guardian.
  • Install damping filters for SR2.
  • Split SRx real-time models?

Ordering

See ../WishList .