=== Facilities === | ==== Facilities ==== |
Line 20: | Line 20: |
== Coming Weeks == | |
Line 21: | Line 22: |
==== Plan for week of 2018-04-23 ==== * Get 8xM8x40 screws for feedthroughs. * Attach feedthroughs to AF. * Get LVDT driver with one good and one bad card for Tanaka-san. * Start SR3 Hang * Hang optic. * Hang RM. * Cable RM OSEMs. |
|
Line 30: | Line 23: |
==== Plan for week of 2018-04-23 ==== * Clean parts (cable clamp bases, etc, etc; Hirata-san). * Observe KAGRA Phase 1 operations, assist if problems arise. * Continue SR3 hang. * Top filter disassembly |
=== 2018-06-18 === ==== Main Sequence ==== * Tweak BF total trim masses. * SF/... TFs. * Add budgeted ballast mass to SF (or remove stuff!). * Cable, test SF FR. * Grab and configure a picomotor driver as SR2_BF 10.68.150.25. * Check JGWDoc electronic item lists are up to date. |
Line 36: | Line 32: |
==== Plan for week of 2018-04-30 ==== * Golden Week! |
==== F0/LBB Stuff ==== * Finish tuning F0 in PI #3. * Replace ceramic thrust bearing in PI #3 with metal one (do PI #1 as well if time). * Characterize more blades? * Park PI #1 in SR3 AF. * Crane PI #3 behind SR3. * Crane PI #1 to factory area. ==== Software ==== * Review/improve macro file fixes for split models; write klog; submit changes to SVN. * --(Install AC bandpass filters in SR3 WD filters.)-- * --(Check coil filter gains for compensation of magnet polarities (confirm SR3 IM, set and confirm SR2 and SR3 TM).)-- * Create software stepper drivers for SR3 and SRM and link to from STEP_MASTER.adl screen. * --(Fix link to SUS_CUS_BSFM_BIO.adl in VIS_CUST_TYPEB_OVERALL.adl.)-- * --(Rename VIS_CUST_BS_BIO.adl screen to VIS_CUST_TYPEB_BIO.adl and adjust links.)-- * --(Fix hardwiring to BS in VIS_CUST_TYPEB_IP_WD_AC_BANDLIM.adl (ACC H2 and ACC H3 sections).)-- * --(Fix broken CD State field in VIS_CUST_TYPEB_OVERALL.adl.)-- === 2018-06-25 === ==== Main Sequence ==== ==== F0/LBB Stuff ==== * Build/tune F0 in PI #1. * Finish tuning PI #3. * Wrap PI #1. * Crane PI #1 to SR2 AF. * Crane PI #3 into SR3 AF. ==== Software/Remote ==== === 2018-07-02 === ==== Main Sequence ==== ==== F0/LBB Stuff ==== === 2018-07-09 === ==== Main Sequence ==== ==== F0/LBB Stuff ==== === 2018-07-16 === ==== Main Sequence ==== ==== F0/LBB Stuff ==== === 2018-07-23 === ==== Main Sequence ==== ==== F0/LBB Stuff ==== |
Line 43: | Line 81: |
* Get SRM mushroom installed. * Find 4 more feedthroughs for SRM. * Install first set of LBB damper rings in SR2 (or SR3?) tank. |
* Get independent power supply for SR3 so SR2 can be powered back up. * Remove SR3 tank lid, crane LBB rings to top of lower half of the tank, clamp in position. * Check SR2, SR3 TM coil gains for magnet polarity compensation. * Calibrate last six IM OSEMs. |
Line 47: | Line 86: |
* Finish half-completed geophones. * Characterize top filter prototype blades. * Decide final top filter blade parameters and order. * Rebuild three top filters. * Do buoyancy calculation (see LIGO-T1100616). |
* Rebuild filter in PI #1. * Install clamps on PI #1. * Install geophone plates on PI #3. * Install geophone plates on PI #1. * Install correct IP in PI #2. * Rebuild filter in PI #2. * Install clamps on PI #2. * Install LBB blade units on PI #2. * Install geophone plates on PI #2. |
Line 63: | Line 107: |
* Do buoyancy calculation (see LIGO-T1100616). * Split SRx real-time models? |
VIS Type B SR Near Term To-Do List
Preparation for SR Installation
Every Week
Facilities
- Vacuum and roll floor.
- Wipe ladders.
- Tidy tools, parts.
Get stuff from ../WishList
Coming Weeks
2018-06-18
Main Sequence
- Tweak BF total trim masses.
- SF/... TFs.
- Add budgeted ballast mass to SF (or remove stuff!).
- Cable, test SF FR.
- Grab and configure a picomotor driver as SR2_BF 10.68.150.25.
- Check JGWDoc electronic item lists are up to date.
F0/LBB Stuff
- Finish tuning F0 in PI #3.
- Replace ceramic thrust bearing in PI #3 with metal one (do PI #1 as well if time).
- Characterize more blades?
- Park PI #1 in SR3 AF.
- Crane PI #3 behind SR3.
- Crane PI #1 to factory area.
Software
- Review/improve macro file fixes for split models; write klog; submit changes to SVN.
Install AC bandpass filters in SR3 WD filters.
Check coil filter gains for compensation of magnet polarities (confirm SR3 IM, set and confirm SR2 and SR3 TM).
- Create software stepper drivers for SR3 and SRM and link to from STEP_MASTER.adl screen.
Fix link to SUS_CUS_BSFM_BIO.adl in VIS_CUST_TYPEB_OVERALL.adl.
Rename VIS_CUST_BS_BIO.adl screen to VIS_CUST_TYPEB_BIO.adl and adjust links.
Fix hardwiring to BS in VIS_CUST_TYPEB_IP_WD_AC_BANDLIM.adl (ACC H2 and ACC H3 sections).
Fix broken CD State field in VIS_CUST_TYPEB_OVERALL.adl.
2018-06-25
Main Sequence
F0/LBB Stuff
- Build/tune F0 in PI #1.
- Finish tuning PI #3.
- Wrap PI #1.
- Crane PI #1 to SR2 AF.
- Crane PI #3 into SR3 AF.
Software/Remote
2018-07-02
Main Sequence
F0/LBB Stuff
2018-07-09
Main Sequence
F0/LBB Stuff
2018-07-16
Main Sequence
F0/LBB Stuff
2018-07-23
Main Sequence
F0/LBB Stuff
SR Prep Tasks - To Be Scheduled
Tunnel
- Get independent power supply for SR3 so SR2 can be powered back up.
- Remove SR3 tank lid, crane LBB rings to top of lower half of the tank, clamp in position.
- Check SR2, SR3 TM coil gains for magnet polarity compensation.
- Calibrate last six IM OSEMs.
- Make three in-air stepper splitter cables for SR2, SR3 and SRM. [done?]
- Rebuild filter in PI #1.
- Install clamps on PI #1.
- Install geophone plates on PI #3.
- Install geophone plates on PI #1.
- Install correct IP in PI #2.
- Rebuild filter in PI #2.
- Install clamps on PI #2.
- Install LBB blade units on PI #2.
- Install geophone plates on PI #2.
Mitaka or remotely
- Make three in-air stepper splitter cables for SR2, SR3 and SRM. [done?]
- (Continue to) soak the sapphire prisms off the dummy BS for reuse on the SRM metal mass.
- Set up SR2 Guardian.
- Install damping filters for SR2.
- Review Shoda-san's Guardian.
- Review DIO stuff.
- Review DAC channel requests.
- Set up SR2 and SR3 Guardian.
- Create Python drivers for SR3_IM and SR3_BF picos and link to them from Mio-kun's PICO_MASTER.adl MEDM screen.
- Install damping filters for SR2.
- Do buoyancy calculation (see LIGO-T1100616).
- Split SRx real-time models?
Ordering
See ../WishList .