Size: 3320
Comment:
|
Size: 2799
Comment:
|
Deletions are marked like this. | Additions are marked like this. |
Line 21: | Line 21: |
=== 2018-04-23 === ==== Main Sequence ==== * Get 8xM8x40 screws for feedthroughs. * Attach feedthroughs to AF. * Get LVDT driver with one good and one bad card for Tanaka-san. * Start SR3 Hang * Find wires, wire clamp items. * Install winch system. * Move KOACH filters, mirror box and table to near AF. * Hang optic. * Set up OL. * Set optic pitch. * Hang RM. * Cable RM OSEMs. ==== F0/LBB Stuff ==== * Clean parts (cable clamp bases, etc, etc; Hirata-san@Mitaka). * Top filter disassembly (if any spare time) * Prepare F0 workspace in SRM area (if any spare time) === 2018-04-30 === * Golden Week! * Uso! * BS TFs (4/30 or TBD). * Observe/assist with bKAGRA Phase 1. == 2018-05-07 == |
=== 2018-05-14 === |
Line 49: | Line 24: |
* Crane in BF. * Add IRM top plate, maraging rod, flying saucer. * Suspend IM, check pitch, roll and vertical, adjust trim mass. * Cable and (re-)test TM OSEMs, IM picos, BF yaw pico, BF LVDT and FR. |
|
Line 50: | Line 29: |
* Prepare F0 workspace in SRM area * Disassemble F0 #1 and #3 * Temporarily raise F0 #3 (in SRM) and remove floor panel * Start characterization of LBB blades (should have by 4/30) == 2018-05-14 == === Main Sequence === === F0/LBB Stuff === |
* Final prep for F0 prototype blade test (5/14) * F0 prototype blade test with Takahashi-san (5/15 or TBD) * Start characterizing LBB blades. |
Line 61: | Line 35: |
* Install IRM sides, and IM OSEMs. * Center IM OSEMs (in/out and laterally) * Route all cables to underneath BF. * Add BF internal ballast mass. * Add BF cap. |
|
Line 62: | Line 41: |
* Final prep for F0 prototype blade test (5/14) * F0 prototype blade test with Takahashi-san (5/15 or TBD) |
* Continue characterizing LBB blades. |
VIS Type B SR Near Term To-Do List
Preparation for SR Installation
Every Week
Facilities
- Vacuum and roll floor.
- Wipe ladders.
- Tidy tools, parts.
Get stuff from ../WishList
Coming Weeks
2018-05-14
Main Sequence
- Crane in BF.
- Add IRM top plate, maraging rod, flying saucer.
- Suspend IM, check pitch, roll and vertical, adjust trim mass.
- Cable and (re-)test TM OSEMs, IM picos, BF yaw pico, BF LVDT and FR.
F0/LBB Stuff
- Final prep for F0 prototype blade test (5/14)
- F0 prototype blade test with Takahashi-san (5/15 or TBD)
- Start characterizing LBB blades.
2018-05-21
Main Sequence
- Install IRM sides, and IM OSEMs.
- Center IM OSEMs (in/out and laterally)
- Route all cables to underneath BF.
- Add BF internal ballast mass.
- Add BF cap.
F0/LBB Stuff
- Continue characterizing LBB blades.
2018-05-28
Main Sequence
F0/LBB Stuff
2018-06-04
Main Sequence
F0/LBB Stuff
2018-06-11
Main Sequence
F0/LBB Stuff
2018-06-18
Main Sequence
F0/LBB Stuff
2018-06-25
Main Sequence
F0/LBB Stuff
2018-07-02
Main Sequence
F0/LBB Stuff
2018-07-09
Main Sequence
F0/LBB Stuff
2018-07-16
Main Sequence
F0/LBB Stuff
2018-07-23
Main Sequence
F0/LBB Stuff
SR Prep Tasks - To Be Scheduled
Tunnel
- Get SRM mushroom installed.
Find 4 more feedthroughs for SRM.
- Install first set of LBB damper rings in SR2 (or SR3?) tank.
- Make three in-air stepper splitter cables for SR2, SR3 and SRM. [done?]
- Finish half-completed geophones.
- Characterize top filter prototype blades.
- Decide final top filter blade parameters and order.
- Rebuild three top filters.
- Do buoyancy calculation (see LIGO-T1100616).
Mitaka or remotely
- Make three in-air stepper splitter cables for SR2, SR3 and SRM. [done?]
- (Continue to) soak the sapphire prisms off the dummy BS for reuse on the SRM metal mass.
- Set up SR2 Guardian.
- Install damping filters for SR2.
- Review Shoda-san's Guardian.
- Review DIO stuff.
- Review DAC channel requests.
- Set up SR2 and SR3 Guardian.
- Create Python drivers for SR3_IM and SR3_BF picos and link to them from Mio-kun's PICO_MASTER.adl MEDM screen.
- Install damping filters for SR2.
Ordering
See ../WishList .