3399
Comment:
|
3570
|
Deletions are marked like this. | Additions are marked like this. |
Line 25: | Line 25: |
* Finish debugging BS BIO. * Make SR3, SR2, SRM like BS. * IM BIO connection is wrong. V goes H and H goes V. * Swap the LPCD to HPCD. |
* --(Finish debugging BS BIO.)-- * --(Make SR3, SR2, SRM like BS.)-- * --(Swap the LPCD to HPCD.)-- * --(Fix IM coil gains to compensate magnet polarities.)-- |
Line 30: | Line 30: |
* Install L-brackets on BF and SF rings. * Add extra spacers under SF to give more jack range. * Suspend BF/... section. * Adjust BF trim mass. * Route cables through SF-BF flying saucer up to bottom of SF. * Adjust BF trim mass. |
* --(Install L-brackets on BF and SF rings.)-- * --(Add extra spacers under SF to give more jack range.)-- * --(Suspend BF/... section.)-- * --(Adjust BF trim mass.)-- * --(Route cables through SF-BF flying saucer up to bottom of SF.)-- * Readjust BF trim mass. |
Line 38: | Line 38: |
* --(Add Cu ring, cable clamps to SF cap.)-- | |
Line 89: | Line 90: |
* Check SR2, SR3 TM coil gains for magnet polarity compensation. |
VIS Type B SR Near Term To-Do List
Preparation for SR Installation
Every Week
Facilities
- Vacuum and roll floor.
- Wipe ladders.
- Tidy tools, parts.
Get stuff from ../WishList
Coming Weeks
2018-06-04
Main Sequence
- Debug stuff.
Finish debugging BS BIO.
Make SR3, SR2, SRM like BS.
Swap the LPCD to HPCD.
Fix IM coil gains to compensate magnet polarities.
- Check the payload so that it gives us the correct TF.
Install L-brackets on BF and SF rings.
Add extra spacers under SF to give more jack range.
Suspend BF/... section.
Adjust BF trim mass.
Route cables through SF-BF flying saucer up to bottom of SF.
- Readjust BF trim mass.
- Readjust payload.
- Take TFs.
Add Cu ring, cable clamps to SF cap.
- Add budgeted ballast mass to SF.
- Cable, test SF LVDT and FR.
- Grab and configure a picomotor driver as SR2_BF 10.68.150.25.
- Set up software pico drivers for SR3_IM and SR3_BF.
- Replace ceramic thrust bearing in PI #3 with metal one (do PI #1 as well if time).
F0/LBB Stuff
- Finish tuning F0 in PI #3.
- Characterize more blades?
- Park PI #1 in SR3 AF.
- Crane PI #3 behind SR3.
- Crane PI #1 to factory area.
- Build/tune F0 in PI #1.
Software
- Split SRx real-time models?
- Fix white channels on BS screens (will probably be an issue for SRx models if/when split).
2018-06-18
Main Sequence
- SF/... TFs.
F0/LBB Stuff
- Wrap PI #1.
- Crane PI #1 to SR2 AF.
- Crane PI #3 into SR3 AF.
- Remove SR3 tank lid, crane LBB rings to top of lower half of the tank.
2018-06-25
Main Sequence
F0/LBB Stuff
2018-07-02
Main Sequence
F0/LBB Stuff
2018-07-09
Main Sequence
F0/LBB Stuff
2018-07-16
Main Sequence
F0/LBB Stuff
2018-07-23
Main Sequence
F0/LBB Stuff
SR Prep Tasks - To Be Scheduled
Tunnel
- Check SR2, SR3 TM coil gains for magnet polarity compensation.
- Calibrate last six IM OSEMs.
- Install first set of LBB damper rings in SR3 tank.
- Make three in-air stepper splitter cables for SR2, SR3 and SRM. [done?]
- Finish half-completed geophones.
- Characterize final top filter blades (from 5/31).
- Rebuild filters in PIs #1 and #3.
- Install clamps on PIs #1 and #3.
- Install LBB units on PIs #1 and #3.
- Install correct IP in PI #3.
- Rebuild filter in PI #2.
- Install clamps on PI #2.
- Install LBB blade units on PI #2.
Mitaka or remotely
- Make three in-air stepper splitter cables for SR2, SR3 and SRM. [done?]
- (Continue to) soak the sapphire prisms off the dummy BS for reuse on the SRM metal mass.
- Set up SR2 Guardian.
- Install damping filters for SR2.
- Review Shoda-san's Guardian.
- Review DIO stuff.
- Review DAC channel requests.
- Set up SR2 and SR3 Guardian.
- Create Python drivers for SR3_IM and SR3_BF picos and link to them from Mio-kun's PICO_MASTER.adl MEDM screen.
- Install damping filters for SR2.
- Do buoyancy calculation (see LIGO-T1100616).
Ordering
See ../WishList .