3018
Comment:
|
3592
|
Deletions are marked like this. | Additions are marked like this. |
Line 28: | Line 28: |
* Cable, test SF LVDT and FR. | * Cable, test SF FR. |
Line 30: | Line 30: |
* Replace ceramic thrust bearing in PI #3 with metal one (do PI #1 as well if time). | * Check JGWDoc electronic item lists are up to date. |
Line 34: | Line 34: |
* Replace ceramic thrust bearing in PI #3 with metal one (do PI #1 as well if time). | |
Line 38: | Line 39: |
* Remove SR3 tank lid, crane LBB rings to top of lower half of the tank. | |
Line 41: | Line 41: |
* Install AC bandpass filters in SR3 WD filters. * Check coil filter gains for compensation of magnet polarities (confirm SR3 IM, set and confirm SR2 and SR3 TM). |
* Review/improve macro file fixes for split models; write klog; submit changes to SVN. * --(Install AC bandpass filters in SR3 WD filters.)-- * --(Check coil filter gains for compensation of magnet polarities (confirm SR3 IM, set and confirm SR2 and SR3 TM).)-- * Create software stepper drivers for SR3 and SRM and link to from STEP_MASTER.adl screen. * --(Fix link to SUS_CUS_BSFM_BIO.adl in VIS_CUST_TYPEB_OVERALL.adl.)-- * --(Rename VIS_CUST_BS_BIO.adl screen to VIS_CUST_TYPEB_BIO.adl and adjust links.)-- * --(Fix hardwiring to BS in VIS_CUST_TYPEB_IP_WD_AC_BANDLIM.adl (ACC H2 and ACC H3 sections).)-- * --(Fix broken CD State field in VIS_CUST_TYPEB_OVERALL.adl.)-- |
Line 75: | Line 81: |
* Get independent power supply for SR3 so SR2 can be powered back up. * Remove SR3 tank lid, crane LBB rings to top of lower half of the tank, clamp in position. |
|
Line 77: | Line 85: |
* Install first set of LBB damper rings in SR3 tank. | |
Line 79: | Line 86: |
* Finish half-completed geophones. * Characterize final top filter blades (from 5/31). * Rebuild filters in PIs #1 and #3. * Install clamps on PIs #1 and #3. * Install LBB units on PIs #1 and #3. * Install correct IP in PI #3. |
* Rebuild filter in PI #1. * Install clamps on PI #1. * Install geophone plates on PI #3. * Install geophone plates on PI #1. * Install correct IP in PI #2. |
Line 88: | Line 94: |
* Install geophone plates on PI #2. |
VIS Type B SR Near Term To-Do List
Preparation for SR Installation
Every Week
Facilities
- Vacuum and roll floor.
- Wipe ladders.
- Tidy tools, parts.
Get stuff from ../WishList
Coming Weeks
2018-06-18
Main Sequence
- Tweak BF total trim masses.
- SF/... TFs.
- Add budgeted ballast mass to SF (or remove stuff!).
- Cable, test SF FR.
- Grab and configure a picomotor driver as SR2_BF 10.68.150.25.
- Check JGWDoc electronic item lists are up to date.
F0/LBB Stuff
- Finish tuning F0 in PI #3.
- Replace ceramic thrust bearing in PI #3 with metal one (do PI #1 as well if time).
- Characterize more blades?
- Park PI #1 in SR3 AF.
- Crane PI #3 behind SR3.
- Crane PI #1 to factory area.
Software
- Review/improve macro file fixes for split models; write klog; submit changes to SVN.
Install AC bandpass filters in SR3 WD filters.
Check coil filter gains for compensation of magnet polarities (confirm SR3 IM, set and confirm SR2 and SR3 TM).
- Create software stepper drivers for SR3 and SRM and link to from STEP_MASTER.adl screen.
Fix link to SUS_CUS_BSFM_BIO.adl in VIS_CUST_TYPEB_OVERALL.adl.
Rename VIS_CUST_BS_BIO.adl screen to VIS_CUST_TYPEB_BIO.adl and adjust links.
Fix hardwiring to BS in VIS_CUST_TYPEB_IP_WD_AC_BANDLIM.adl (ACC H2 and ACC H3 sections).
Fix broken CD State field in VIS_CUST_TYPEB_OVERALL.adl.
2018-06-25
Main Sequence
F0/LBB Stuff
- Build/tune F0 in PI #1.
- Finish tuning PI #3.
- Wrap PI #1.
- Crane PI #1 to SR2 AF.
- Crane PI #3 into SR3 AF.
Software/Remote
2018-07-02
Main Sequence
F0/LBB Stuff
2018-07-09
Main Sequence
F0/LBB Stuff
2018-07-16
Main Sequence
F0/LBB Stuff
2018-07-23
Main Sequence
F0/LBB Stuff
SR Prep Tasks - To Be Scheduled
Tunnel
- Get independent power supply for SR3 so SR2 can be powered back up.
- Remove SR3 tank lid, crane LBB rings to top of lower half of the tank, clamp in position.
- Check SR2, SR3 TM coil gains for magnet polarity compensation.
- Calibrate last six IM OSEMs.
- Make three in-air stepper splitter cables for SR2, SR3 and SRM. [done?]
- Rebuild filter in PI #1.
- Install clamps on PI #1.
- Install geophone plates on PI #3.
- Install geophone plates on PI #1.
- Install correct IP in PI #2.
- Rebuild filter in PI #2.
- Install clamps on PI #2.
- Install LBB blade units on PI #2.
- Install geophone plates on PI #2.
Mitaka or remotely
- Make three in-air stepper splitter cables for SR2, SR3 and SRM. [done?]
- (Continue to) soak the sapphire prisms off the dummy BS for reuse on the SRM metal mass.
- Set up SR2 Guardian.
- Install damping filters for SR2.
- Review Shoda-san's Guardian.
- Review DIO stuff.
- Review DAC channel requests.
- Set up SR2 and SR3 Guardian.
- Create Python drivers for SR3_IM and SR3_BF picos and link to them from Mio-kun's PICO_MASTER.adl MEDM screen.
- Install damping filters for SR2.
- Do buoyancy calculation (see LIGO-T1100616).
- Split SRx real-time models?
Ordering
See ../WishList .