== 2017-11-13 == * --(Huge cleanup!)-- * --(Find collet from maraging rod adapter.)-- * --(Make notes on where ladder needs to go.)-- * --(Take photos and make notes about where SR2 safety bars need to go)-- (time permitting, also SR3). * --(Wrap and label BS parts.)-- * --(Bring work table from PR2 area.)-- * Bring racks from SRM area. * --(Look for needed screws, especially for IM.)-- * Find mirror gluing items. * Mirror * Mirror box * --(Prisms)-- * --(Secondary prisms)-- * --(Magnets)-- * --(Magnet bases)-- |
== 2017-11-27 == * Bring SR2 into tunnel. * Bring 6 L-brackets for chassis boxes into tunnel. * Bring cleaned parts from near ultrasonic cleaner into tunnel. * Move SR2 rack into position. * Add L-brackets to new whitening filter and two HPCDs (one in BS rack). * Check if we have enough ADC/DAC/DIO cards. * Get Miyakawa/Yamamoto to connect rack to DC power, Internet, etc. * Get cables/cards for SR2: * 5 DSub-37 cables (tent) * 5 DSub-15M to DSub-9M adapter cables (tent) * 2 DSub-9 FF gender benders (for LVDTs) * extra ADC card(s)? * extra DAC card(s)? * extra DIO card(s)? * BNC-LEMO adapter (for LVDT sig gen) * etc * Run cables to assembly frame. * Find and attach feedthroughs. * Find mirror gluing items: |
Line 38: | Line 42: |
* --(Prism jigs)-- * Magnet jigs * --(Balance)-- * --(Stirrers)-- * --(Mixing dishes)-- |
* Prism jigs |
Line 45: | Line 45: |
* --(EP30)-- * Glass beads * Install new jack receptacles on load gauge adapter. |
* Do mirror gluing. == 2017-12-04 == * Assemble SR2 IP. * Set up for testing IP with BS pico driver. * Make pico cable. * Assemble IP. * Test IP picos. * Adjust verticality of assembly frame; center and immobilize optical table. |
Line 51: | Line 57: |
Line 53: | Line 58: |
* Bring SR2 into tunnel. * Rehearse mirror gluing. |
* Install new jack receptacles (in SR3 area, second floor) on load gauge adapter (SR2 area, second floor). * Finish mass budget for SR2/SR3/SRM (Fabian) - mostly done. * Design final SF ballast masses (Fabian). * Get safety bars moved. * Get air hose connection moved. |
Line 58: | Line 65: |
* Do rough mass budget for SR2/SR3/SRM. * Design final SF ballast masses (Fabian). |
* Lots of stuff - see Hirata-san's spreadsheet. |
Line 69: | Line 74: |
* SUS wires(3 types) for the LBB * Change the length -> Orderd. delivery date:10/ |
|
Line 76: | Line 79: |
* SR assembly frame -> Ordered. delivery date:9/27-29 * Mark is checking the design from Fabian * We should order the parts necessary to modify the BS assembly frame to the SR2 assembly frame |
|
Line 98: | Line 98: |
* Get cables/cards for SR3: * 5 DSub-37 cables (tent) * 5 DSub-15M to DSub-9M adapter cables (tent) * 3 DIO cards (tent) * 2 DSub-9 FF gender benders (for LVDTs) * extra ADC card(s)? * extra DAC card(s)? * BNC-LEMO adapter (for LVDTs) * etc |
VIS Type B SR Near Term To-Do List
Preparation for SR Installation
Every Week
Facilities
- Vacuum and roll floor.
- Wipe ladders.
- Tidy tools, parts.
Get stuff from ../WishList
2017-11-27
- Bring SR2 into tunnel.
- Bring 6 L-brackets for chassis boxes into tunnel.
- Bring cleaned parts from near ultrasonic cleaner into tunnel.
- Move SR2 rack into position.
- Add L-brackets to new whitening filter and two HPCDs (one in BS rack).
- Check if we have enough ADC/DAC/DIO cards.
- Get Miyakawa/Yamamoto to connect rack to DC power, Internet, etc.
- Get cables/cards for SR2:
- 5 DSub-37 cables (tent)
- 5 DSub-15M to DSub-9M adapter cables (tent)
- 2 DSub-9 FF gender benders (for LVDTs)
- extra ADC card(s)?
- extra DAC card(s)?
- extra DIO card(s)?
- BNC-LEMO adapter (for LVDT sig gen)
- etc
- Run cables to assembly frame.
- Find and attach feedthroughs.
- Find mirror gluing items:
- Prism micrometer stages
- Prism jigs
- Lenses for inspecting scribe lines
- Procedure document.
- Do mirror gluing.
2017-12-04
- Assemble SR2 IP.
- Set up for testing IP with BS pico driver.
- Make pico cable.
- Assemble IP.
- Test IP picos.
- Adjust verticality of assembly frame; center and immobilize optical table.
SR Prep Tasks - To Be Scheduled
- Install new jack receptacles (in SR3 area, second floor) on load gauge adapter (SR2 area, second floor).
- Finish mass budget for SR2/SR3/SRM (Fabian) - mostly done.
- Design final SF ballast masses (Fabian).
- Get safety bars moved.
- Get air hose connection moved.
Design/Purchasing
- Lots of stuff - see Hirata-san's spreadsheet.
Order now
Bread boards for SR -> Orderd. delivery date:10/18-20
- Include installation work in the contract
- Total budget = 5MJPY
PEEK collet for "Small hexagon"(cable clamp) -> need modification.
Need simple design changes
- Receptacles for Bread board damper
- There is a mistake in the PROMEC drawing.
- Hirata-san will make a new 2D drawing
- IM wire clamps for SR
Need to change the height -> watiting second quote.
Need Fabian's input
Cable clamps for BF,SF and PI -> 方式を決める
- Design change for the PI clamps, because the SR PIs are NIKHEF ones.
- Ballast masses for BF and SF
- 製作に2週間程度
- 10月頭にTop Filterの最適荷重を実測。それに合わせて発注。それまでにデザインは用意しておく。
測定に必要な物品の準備 -> 月曜日に高橋さんと相談
Need more discussion/checks
- Blade spring assembly for LBB
- Check the load of the LBB and decide the design load of the springs
- Correct the length
Scale the width of the current blades to design the new blades -> 高橋さんと相談
- SR用LBBの重さを確認
- Bread board damper rings
Need to check whether we can put a full ring into the chamber from the side flanges or not. -> need modification