3592
Comment:
|
2731
|
Deletions are marked like this. | Additions are marked like this. |
Line 15: | Line 15: |
* Wipe ladders. | * Wipe ladders, assembly frame. |
Line 22: | Line 22: |
=== 2018-10-22 === ==== SRM (top priority) ==== * Main sequence * Adjust H2 and H3 OSEMs laterally and in/out. * Weigh BF/... section and adjust trim mass to fix pitch/roll. * Anchor cables to BF cap. * Install SF crossbars. * Build up SS to SF ring. * Bring in SF. * Hook BF/... . * PI * Choose and install CuBe spring.? * Replace yoke in F0.? * Install LBB blade units on PI.? * Install geophone plates on PI.? * Electronics * Scavenge HPCDs from SR2 and SR3. * Organize to get LPCDs modified. |
|
Line 23: | Line 41: |
=== 2018-06-18 === ==== Main Sequence ==== * Tweak BF total trim masses. * SF/... TFs. * Add budgeted ballast mass to SF (or remove stuff!). * Cable, test SF FR. * Grab and configure a picomotor driver as SR2_BF 10.68.150.25. * Check JGWDoc electronic item lists are up to date. |
==== SR2 (low priority) ==== * More TFs * Add more arc weights? * Do control filter design and installation. * Do measurement of yaw torque required for F0 yaw adjustment. * Gather items for SR2 OL. |
Line 32: | Line 48: |
==== F0/LBB Stuff ==== * Finish tuning F0 in PI #3. * Replace ceramic thrust bearing in PI #3 with metal one (do PI #1 as well if time). * Characterize more blades? * Park PI #1 in SR3 AF. * Crane PI #3 behind SR3. * Crane PI #1 to factory area. ==== Software ==== * Review/improve macro file fixes for split models; write klog; submit changes to SVN. * --(Install AC bandpass filters in SR3 WD filters.)-- * --(Check coil filter gains for compensation of magnet polarities (confirm SR3 IM, set and confirm SR2 and SR3 TM).)-- * Create software stepper drivers for SR3 and SRM and link to from STEP_MASTER.adl screen. * --(Fix link to SUS_CUS_BSFM_BIO.adl in VIS_CUST_TYPEB_OVERALL.adl.)-- * --(Rename VIS_CUST_BS_BIO.adl screen to VIS_CUST_TYPEB_BIO.adl and adjust links.)-- * --(Fix hardwiring to BS in VIS_CUST_TYPEB_IP_WD_AC_BANDLIM.adl (ACC H2 and ACC H3 sections).)-- * --(Fix broken CD State field in VIS_CUST_TYPEB_OVERALL.adl.)-- === 2018-06-25 === ==== Main Sequence ==== ==== F0/LBB Stuff ==== * Build/tune F0 in PI #1. * Finish tuning PI #3. * Wrap PI #1. * Crane PI #1 to SR2 AF. * Crane PI #3 into SR3 AF. ==== Software/Remote ==== === 2018-07-02 === ==== Main Sequence ==== ==== F0/LBB Stuff ==== === 2018-07-09 === ==== Main Sequence ==== ==== F0/LBB Stuff ==== === 2018-07-16 === ==== Main Sequence ==== ==== F0/LBB Stuff ==== === 2018-07-23 === ==== Main Sequence ==== ==== F0/LBB Stuff ==== |
==== Etc ==== * Tidy up: * Gather all PR/SR gluing tools and clean/label/organize them. * Move safety bar stuff to portable cleanroom between SR2 and SR3. * Clear space under SR3 stairs. * Etc, etc, etc. * Monitor AF disassembly. * Get SR2 optical table moved to SR3 area (under stairs). * Move cables; set up for geophone testing. * Make more feedthrough adaptors. |
Line 81: | Line 63: |
* Get independent power supply for SR3 so SR2 can be powered back up. * Remove SR3 tank lid, crane LBB rings to top of lower half of the tank, clamp in position. |
* Get at least one BIO Converter chassis fully connected (CONTEC BIO card, WD and stepper motor chassis) for implementation and test of stepper motor reset function. * Install, cable PI yaw steppers. * Correct flipped connections in SRM PI LVDTs. |
Line 84: | Line 67: |
* Calibrate last six IM OSEMs. * Make three in-air stepper splitter cables for SR2, SR3 and SRM. [done?] * Rebuild filter in PI #1. * Install clamps on PI #1. * Install geophone plates on PI #3. * Install geophone plates on PI #1. * Install correct IP in PI #2. * Rebuild filter in PI #2. * Install clamps on PI #2. * Install LBB blade units on PI #2. * Install geophone plates on PI #2. |
* Replace chipped magnets (12x12x12 mm) in SR3 IP, H1 and H2. |
Line 97: | Line 70: |
* Write generic Type B Guardian; make BS and SR3 inherit from it; make analog WD optional for now (all suspensions will get them eventually). * Create software stepper drivers for SR3 and SRM and link to them from STEP_MASTER.adl screen. |
|
Line 101: | Line 76: |
* Review Shoda-san's Guardian. * Review DIO stuff. |
|
Line 104: | Line 77: |
* Set up SR2 and SR3 Guardian. * Create Python drivers for SR3_IM and SR3_BF picos and link to them from Mio-kun's PICO_MASTER.adl MEDM screen. |
* Set up SR2 Guardian. |
Line 107: | Line 79: |
* Do buoyancy calculation (see LIGO-T1100616). |
VIS Type B SR Near Term To-Do List
Preparation for SR Installation
Every Week
Facilities
- Vacuum and roll floor.
- Wipe ladders, assembly frame.
- Tidy tools, parts.
Get stuff from ../WishList
Coming Weeks
2018-10-22
SRM (top priority)
- Main sequence
- Adjust H2 and H3 OSEMs laterally and in/out.
- Weigh BF/... section and adjust trim mass to fix pitch/roll.
- Anchor cables to BF cap.
- Install SF crossbars.
- Build up SS to SF ring.
- Bring in SF.
- Hook BF/... .
- PI
Choose and install CuBe spring.?
- Replace yoke in F0.?
- Install LBB blade units on PI.?
- Install geophone plates on PI.?
- Electronics
- Scavenge HPCDs from SR2 and SR3.
- Organize to get LPCDs modified.
SR2 (low priority)
- More TFs
- Add more arc weights?
- Do control filter design and installation.
- Do measurement of yaw torque required for F0 yaw adjustment.
- Gather items for SR2 OL.
Etc
- Tidy up:
- Gather all PR/SR gluing tools and clean/label/organize them.
- Move safety bar stuff to portable cleanroom between SR2 and SR3.
- Clear space under SR3 stairs.
- Etc, etc, etc.
- Monitor AF disassembly.
- Get SR2 optical table moved to SR3 area (under stairs).
- Move cables; set up for geophone testing.
- Make more feedthrough adaptors.
SR Prep Tasks - To Be Scheduled
Tunnel
- Get at least one BIO Converter chassis fully connected (CONTEC BIO card, WD and stepper motor chassis) for implementation and test of stepper motor reset function.
- Install, cable PI yaw steppers.
- Correct flipped connections in SRM PI LVDTs.
- Check SR2, SR3 TM coil gains for magnet polarity compensation.
- Replace chipped magnets (12x12x12 mm) in SR3 IP, H1 and H2.
Mitaka or remotely
- Write generic Type B Guardian; make BS and SR3 inherit from it; make analog WD optional for now (all suspensions will get them eventually).
- Create software stepper drivers for SR3 and SRM and link to them from STEP_MASTER.adl screen.
- Make three in-air stepper splitter cables for SR2, SR3 and SRM. [done?]
- (Continue to) soak the sapphire prisms off the dummy BS for reuse on the SRM metal mass.
- Set up SR2 Guardian.
- Install damping filters for SR2.
- Review DAC channel requests.
- Set up SR2 Guardian.
- Install damping filters for SR2.
- Split SRx real-time models?
Ordering
See ../WishList .