Line 22: Line 22:

=== 2018-07-02 ===
=== 2018-07-09 ===
Line 25: Line 24:
 * Install, cable PI yaw stepper.
 * Decide whether to install ballast mass inside SF.
 * Install SF ballast mass inside or on top, less reserve for cables.
 * Route cables around SF up to flying saucer and PI.
 * Finalize SF trim mass.
 * Check/restore alignment of payload, especially optic pitch.
Line 32: Line 27:
 * Unclamp assembly frame at IM level.
 * Unlock and center IP.
 * Calibrate horizontal LVDTs.
 * Tune IP.
 * Install, cable PI yaw stepper.
Line 36: Line 30:
 * Create software stepper drivers for SR3 and SRM and link to from STEP_MASTER.adl screen.  * Calibrate PI LVDTs and FRs.
 * Cabling, testing, TFs.
Line 39: Line 34:
 * Characterize more blades?
 * Build filter in PI #1 for SR2.
 * Finalize PI #1 for SR2; crane into SR2 cleanbooth.
Line 42: Line 36:
 * Set tank jacks to nominal height.
 * Clear space for PI #2 (SRM) work.
Line 43: Line 39:
==== Software ==== ==== Software Etc ====
Line 45: Line 41:
 * Get at least one BIO Converter chassis fully connected (CONTEC BIO card, WD and stepper motor chassis) for implementation and test of stepper motor reset function.
Line 46: Line 43:
 * Create Python drivers for SR3_IM and SR3_BF steppers and link to them from Mio-kun's PICO_MASTER.adl MEDM screen.  * Create software stepper drivers for SR3 and SRM and link to them from STEP_MASTER.adl screen.
Line 49: Line 46:
=== 2018-07-09 === === 2018-07-16 ===
Line 51: Line 48:
 * Lock suspension.
 * Crane into tank.
 * Unlock suspension.
 * Rearrange cables.
 * Test.
Line 52: Line 54:
 * Install correct IP in PI #2.
 * Crane PI #2 to second floor.
 * Rebuild top filter of PI #2.

VIS Type B SR Near Term To-Do List

Archived To-Do Items

Every Week

Coming Weeks

Preparation for SR Installation

Every Week

Facilities

  • Vacuum and roll floor.
  • Wipe ladders.
  • Tidy tools, parts.
  • Get stuff from ../WishList

Coming Weeks

2018-07-09

Main Sequence

  • Check/restore alignment of payload, especially optic pitch.
  • Install and cable geophones.
  • Install arc weights.
  • Tune IP.
  • Install, cable PI yaw stepper.
  • Make three in-air stepper splitter cables for SR2, SR3 and SRM.
  • Calibrate PI LVDTs and FRs.
  • Cabling, testing, TFs.

F0/LBB Stuff

  • Finalize PI #1 for SR2; crane into SR2 cleanbooth.
  • Remove SR3 tank lid, crane LBB rings to top of lower half of the tank, clamp in position.
  • Set tank jacks to nominal height.
  • Clear space for PI #2 (SRM) work.

Software Etc

  • Review/improve macro file fixes for split models; write klog; submit changes to SVN.
  • Get at least one BIO Converter chassis fully connected (CONTEC BIO card, WD and stepper motor chassis) for implementation and test of stepper motor reset function.
  • Write generic Type B Guardian; make BS and SR3 inherit from it; make analog WD optional for now (all suspensions will get them eventually).
  • Create software stepper drivers for SR3 and SRM and link to them from STEP_MASTER.adl screen.

2018-07-16

Main Sequence

  • Lock suspension.
  • Crane into tank.
  • Unlock suspension.
  • Rearrange cables.
  • Test.

F0/LBB Stuff

  • Install correct IP in PI #2.
  • Crane PI #2 to second floor.
  • Rebuild top filter of PI #2.

SR Prep Tasks - To Be Scheduled

Tunnel

  • Grab and configure a picomotor driver as SR2_BF 10.68.150.25.
  • Get independent power supply for SR3 so SR2 can be powered back up.
  • Check SR2, SR3 TM coil gains for magnet polarity compensation.
  • Calibrate last six IM OSEMs.
  • Rebuild filter in PI #1.
  • Install clamps on PI #1.
  • Install geophone plates on PI #3.
  • Install geophone plates on PI #1.
  • Install correct IP in PI #2.
  • Rebuild filter in PI #2.
  • Install clamps on PI #2.
  • Install LBB blade units on PI #2.
  • Install geophone plates on PI #2.

Mitaka or remotely

  • Make three in-air stepper splitter cables for SR2, SR3 and SRM. [done?]
  • (Continue to) soak the sapphire prisms off the dummy BS for reuse on the SRM metal mass.
  • Set up SR2 Guardian.
  • Install damping filters for SR2.
  • Review Shoda-san's Guardian.
  • Review DIO stuff.
  • Review DAC channel requests.
  • Set up SR2 Guardian.
  • Install damping filters for SR2.
  • Split SRx real-time models?

Ordering

See ../WishList .

KAGRA/Subgroups/VIS/TypeB/ToDoSR (last edited 2019-01-04 15:25:56 by MarkBarton)