Differences between revisions 76 and 129 (spanning 53 versions)
Revision 76 as of 2018-07-06 14:08:26
Size: 2925
Editor: MarkBarton
Comment:
Revision 129 as of 2018-11-26 12:51:40
Size: 3112
Editor: MarkBarton
Comment:
Deletions are marked like this. Additions are marked like this.
Line 15: Line 15:
 * Wipe ladders.  * Wipe ladders, assembly frame.
Line 22: Line 22:
=== 2018-07-09 ===
==== Main Sequence ====
 * Check/restore alignment of payload, especially optic pitch.
 * Install and cable geophones.
 * Install arc weights.
 * Tune IP.
 * Install, cable PI yaw stepper.
 * Make three in-air stepper splitter cables for SR2, SR3 and SRM.
 * Calibrate PI LVDTs and FRs.
 * Cabling, testing, TFs.
=== 2018-11-26 ===
==== SR3 ====
 * Install extension cord for OL.
 * Update JGWDoc re HPCD moved to SRM.
Line 33: Line 27:
==== F0/LBB Stuff ====
 * Finalize PI #1 for SR2; crane into SR2 cleanbooth.
 * Remove SR3 tank lid, crane LBB rings to top of lower half of the tank, clamp in position.
 * Set tank jacks to nominal height.
 * Clear space for PI #2 (SRM) work.
==== SRM ====
 * --(Get fasteners for OL shelf.)--
 * Find two geophone cables used by Okutomi-san. (I looked in the second floor EXV room but didn't find them - Mark.)
 * Install OL shelf.
 * Install extension cord for OL.
 * Clear space for SRM swap.
 * Rearrange miswired geophone cable.
 * Rebuild defective geophone cable.
 * Ultrasonically clean metal parts associated with new SRM (except for solblack-coated ones) and tools.
 * Install IM-IRM safety bar.
 * Swap SRM glass mass.
 * Seal geophones.
 * Rewire one geophone cable correctly.
 * Add extra ≈1 kg to SF cap and adjust tilt.
 * Center and fasten F0 yoke.
 * Calibrate F0 GAS LVDT.
 * Add arc weights and geophones.
 * Test geophones.
 * Improve centering/tuning of IP and SS alignment.
 * Disconnect cables.
 * Remove crossbars.
 * Crane suspension into tank.
Line 39: Line 50:
==== Software Etc ====
 * Review/improve macro file fixes for split models; write klog; submit changes to SVN.
 * Get at least one BIO Converter chassis fully connected (CONTEC BIO card, WD and stepper motor chassis) for implementation and test of stepper motor reset function.
 * Write generic Type B Guardian; make BS and SR3 inherit from it; make analog WD optional for now (all suspensions will get them eventually).
 * Create software stepper drivers for SR3 and SRM and link to them from STEP_MASTER.adl screen.


=== 2018-07-16 ===
==== Main Sequence ====
 * Lock suspension.
 * Crane into tank.
 * Unlock suspension.
 * Rearrange cables.
 * Test.
==== F0/LBB Stuff ====
 * Install correct IP in PI #2.
 * Crane PI #2 to second floor.
 * Rebuild top filter of PI #2.
==== SR2 (not so low priority) ====
 * Install extension cord for OL.
 * --(Get fasteners for OL shelf.)--
 * Install fasteners for OL shelf.
 * Set up OL cabling.
 * Set up OL.
 * Add more arc weights and tweak IP centering.
 * Replace two borrowed geophones.
 * Remove tape, writing etc on PI and PI items.
 * Add new feedthrough to lower part of tank (with Izumi-san-tachi).
 * Install cable for MIF pico on LBB (with Izumi-san-tachi).
 * Add ballast mass to LBB.
 * Install manual yaw adjuster.
 * Get top plate reduced?
Line 62: Line 69:
 * Grab and configure a picomotor driver as SR2_BF 10.68.150.25.
 * Get independent power supply for SR3 so SR2 can be powered back up.
  * Check which LVDT cards are in which boxes.
 * Get at least one BIO Converter chassis fully connected (CONTEC BIO card, WD and stepper motor chassis) for implementation and test of stepper motor reset function.
 * Install, cable PI yaw steppers.
 * Correct flipped connections in SRM PI LVDTs.
Line 65: Line 74:
 * Calibrate last six IM OSEMs.
 * Rebuild filter in PI #1.
 * Install clamps on PI #1.
 * Install geophone plates on PI #3.
 * Install geophone plates on PI #1.
 * Install correct IP in PI #2.
 * Rebuild filter in PI #2.
 * Install clamps on PI #2.
 * Install LBB blade units on PI #2.
 * Install geophone plates on PI #2.
 * Replace chipped magnets (12x12x12 mm) in SR3 IP, H1 and H2.
Line 77: Line 77:
 * Write generic Type B Guardian; make BS and SR3 inherit from it; make analog WD optional for now (all suspensions will get them eventually).
 * Create software stepper drivers for SR3 and SRM and link to them from STEP_MASTER.adl screen.
Line 79: Line 81:
 * Set up SR2 Guardian.
Line 81: Line 82:
 * Review Shoda-san's Guardian.
 * Review DIO stuff.

VIS Type B SR Near Term To-Do List

Archived To-Do Items

Every Week

Coming Weeks

Preparation for SR Installation

Every Week

Facilities

  • Vacuum and roll floor.
  • Wipe ladders, assembly frame.
  • Tidy tools, parts.
  • Get stuff from ../WishList

Coming Weeks

2018-11-26

SR3

  • Install extension cord for OL.
  • Update JGWDoc re HPCD moved to SRM.

SRM

  • Get fasteners for OL shelf.

  • Find two geophone cables used by Okutomi-san. (I looked in the second floor EXV room but didn't find them - Mark.)
  • Install OL shelf.
  • Install extension cord for OL.
  • Clear space for SRM swap.
  • Rearrange miswired geophone cable.
  • Rebuild defective geophone cable.
  • Ultrasonically clean metal parts associated with new SRM (except for solblack-coated ones) and tools.
  • Install IM-IRM safety bar.
  • Swap SRM glass mass.
  • Seal geophones.
  • Rewire one geophone cable correctly.
  • Add extra ≈1 kg to SF cap and adjust tilt.
  • Center and fasten F0 yoke.
  • Calibrate F0 GAS LVDT.
  • Add arc weights and geophones.
  • Test geophones.
  • Improve centering/tuning of IP and SS alignment.
  • Disconnect cables.
  • Remove crossbars.
  • Crane suspension into tank.

SR2 (not so low priority)

  • Install extension cord for OL.
  • Get fasteners for OL shelf.

  • Install fasteners for OL shelf.
  • Set up OL cabling.
  • Set up OL.
  • Add more arc weights and tweak IP centering.
  • Replace two borrowed geophones.
  • Remove tape, writing etc on PI and PI items.
  • Add new feedthrough to lower part of tank (with Izumi-san-tachi).
  • Install cable for MIF pico on LBB (with Izumi-san-tachi).
  • Add ballast mass to LBB.
  • Install manual yaw adjuster.
  • Get top plate reduced?

SR Prep Tasks - To Be Scheduled

Tunnel

  • Check which LVDT cards are in which boxes.
  • Get at least one BIO Converter chassis fully connected (CONTEC BIO card, WD and stepper motor chassis) for implementation and test of stepper motor reset function.
  • Install, cable PI yaw steppers.
  • Correct flipped connections in SRM PI LVDTs.
  • Check SR2, SR3 TM coil gains for magnet polarity compensation.
  • Replace chipped magnets (12x12x12 mm) in SR3 IP, H1 and H2.

Mitaka or remotely

  • Write generic Type B Guardian; make BS and SR3 inherit from it; make analog WD optional for now (all suspensions will get them eventually).
  • Create software stepper drivers for SR3 and SRM and link to them from STEP_MASTER.adl screen.
  • Make three in-air stepper splitter cables for SR2, SR3 and SRM. [done?]
  • (Continue to) soak the sapphire prisms off the dummy BS for reuse on the SRM metal mass.
  • Install damping filters for SR2.
  • Review DAC channel requests.
  • Set up SR2 Guardian.
  • Install damping filters for SR2.
  • Split SRx real-time models?

Ordering

See ../WishList .

KAGRA/Subgroups/VIS/TypeB/ToDoSR (last edited 2019-01-04 15:25:56 by MarkBarton)