2970
Comment:
|
3265
|
Deletions are marked like this. | Additions are marked like this. |
Line 15: | Line 15: |
* Wipe ladders. | * Wipe ladders, assembly frame. |
Line 22: | Line 22: |
=== 2018-07-09 === ==== Main Sequence ==== * Retrieve BNC-Lemo cable from Nakano-kun. * Check/restore alignment of payload, especially optic pitch. * Install and cable geophones. * Install arc weights. * Tune IP. * Install, cable PI yaw stepper. * Make three in-air stepper splitter cables for SR2, SR3 and SRM. * Calibrate PI LVDTs and FRs. * Cabling, testing, TFs. |
=== 2018-09-25 === ==== Etc ==== * Take SRM LVDT driver out of rack for Lucia. ==== SR2 ==== * Turn off KOACH filters in tank and see if BF keystone rises. * Install shelves in small rack, and put sat amps, drivers, etc inside. * Run power and network to pico drivers and steppers. * Test picos and steppers. * Adjust pitch/roll of IM with picos. * Offload BF GAS LVDT offset with FR stepper. * Add arc weights and geophones. (Might have to reserve one geophone for Fujii-Fun - check.) * Cable geophones. (Might have to reserve one cable for Fujii-kun - check.) * Unlock and center IP. * More TFs. |
Line 34: | Line 37: |
==== F0/LBB Stuff ==== * Finalize PI #1 for SR2; crane into SR2 cleanbooth. * Remove SR3 tank lid, crane LBB rings to top of lower half of the tank, clamp in position. * Set tank jacks to nominal height. * Clear space for PI #2 (SRM) work. |
==== SRM ==== * Add TM OSEM cables. * Set TM pitch and tighten clamps. * Set RM pitch and tighten clamps. * Remove winch system and restore items removed from top of IM. * Suspend and weigh IM/... section. * Add BF crossbars to SS. * Build up SS to BF level. * Suspend IM/... section and adjust ballast/trim masses. * Install feedthroughs on AF (3 available; need to get a 4th). * Arrange power to SRM rack and get it running. * Check the IRIG-B 9999xx fix has been applied (klog [[http://klog.icrr.u-tokyo.ac.jp/osl/index.php?r=6031||6031]]). |
Line 40: | Line 50: |
==== Software Etc ==== * Review/improve macro file fixes for split models; write klog; submit changes to SVN. * Get at least one BIO Converter chassis fully connected (CONTEC BIO card, WD and stepper motor chassis) for implementation and test of stepper motor reset function. * Write generic Type B Guardian; make BS and SR3 inherit from it; make analog WD optional for now (all suspensions will get them eventually). * Create software stepper drivers for SR3 and SRM and link to them from STEP_MASTER.adl screen. === 2018-07-16 === ==== Main Sequence ==== * Lock suspension. * Crane into tank. * Unlock suspension. * Rearrange cables. * Test. ==== F0/LBB Stuff ==== * Install correct IP in PI #2. * Crane PI #2 to second floor. * Rebuild top filter of PI #2. |
==== SR3 ==== * ''Don't even '''think''' about doing anything with SR3.'' |
Line 63: | Line 58: |
* Add SR3 LBB ballast mass. * Install SR3 LEN OL. * Rebuild PI #2 F0 for SRM. * Retrieve BNC-Lemo cable from Nakano-kun. * Get at least one BIO Converter chassis fully connected (CONTEC BIO card, WD and stepper motor chassis) for implementation and test of stepper motor reset function. * Install, cable SR3 PI yaw stepper. * Correct flipped connections in SRM PI LVDTs. |
|
Line 64: | Line 66: |
* Get independent power supply for SR3 so SR2 can be powered back up. | |
Line 66: | Line 67: |
* Calibrate last six IM OSEMs. * Rebuild filter in PI #1. * Install clamps on PI #1. * Install geophone plates on PI #3. * Install geophone plates on PI #1. * Install correct IP in PI #2. * Rebuild filter in PI #2. * Install clamps on PI #2. * Install LBB blade units on PI #2. * Install geophone plates on PI #2. |
* Rebuild filter in PI #2 for SRM. * Clean/Replace yoke in PI #2 for SRM. * Install clamps on PI #2 for SRM. * Install LBB blade units on PI #2 for SRM. * Install geophone plates on PI #2 for SRM. * Replace chipped magnets (12x12x12 mm) in SR3 IP, H1 and H2. |
Line 78: | Line 75: |
* Write generic Type B Guardian; make BS and SR3 inherit from it; make analog WD optional for now (all suspensions will get them eventually). * Create software stepper drivers for SR3 and SRM and link to them from STEP_MASTER.adl screen. |
|
Line 82: | Line 81: |
* Review Shoda-san's Guardian. * Review DIO stuff. |
VIS Type B SR Near Term To-Do List
Preparation for SR Installation
Every Week
Facilities
- Vacuum and roll floor.
- Wipe ladders, assembly frame.
- Tidy tools, parts.
Get stuff from ../WishList
Coming Weeks
2018-09-25
Etc
- Take SRM LVDT driver out of rack for Lucia.
SR2
- Turn off KOACH filters in tank and see if BF keystone rises.
- Install shelves in small rack, and put sat amps, drivers, etc inside.
- Run power and network to pico drivers and steppers.
- Test picos and steppers.
- Adjust pitch/roll of IM with picos.
- Offload BF GAS LVDT offset with FR stepper.
- Add arc weights and geophones. (Might have to reserve one geophone for Fujii-Fun - check.)
- Cable geophones. (Might have to reserve one cable for Fujii-kun - check.)
- Unlock and center IP.
- More TFs.
SRM
- Add TM OSEM cables.
- Set TM pitch and tighten clamps.
- Set RM pitch and tighten clamps.
- Remove winch system and restore items removed from top of IM.
- Suspend and weigh IM/... section.
- Add BF crossbars to SS.
- Build up SS to BF level.
- Suspend IM/... section and adjust ballast/trim masses.
- Install feedthroughs on AF (3 available; need to get a 4th).
- Arrange power to SRM rack and get it running.
Check the IRIG-B 9999xx fix has been applied (klog http://klog.icrr.u-tokyo.ac.jp/osl/index.php?r=6031).
SR3
Don't even think about doing anything with SR3.
SR Prep Tasks - To Be Scheduled
Tunnel
- Add SR3 LBB ballast mass.
- Install SR3 LEN OL.
- Rebuild PI #2 F0 for SRM.
- Retrieve BNC-Lemo cable from Nakano-kun.
- Get at least one BIO Converter chassis fully connected (CONTEC BIO card, WD and stepper motor chassis) for implementation and test of stepper motor reset function.
- Install, cable SR3 PI yaw stepper.
- Correct flipped connections in SRM PI LVDTs.
- Grab and configure a picomotor driver as SR2_BF 10.68.150.25.
- Check SR2, SR3 TM coil gains for magnet polarity compensation.
- Rebuild filter in PI #2 for SRM.
- Clean/Replace yoke in PI #2 for SRM.
- Install clamps on PI #2 for SRM.
- Install LBB blade units on PI #2 for SRM.
- Install geophone plates on PI #2 for SRM.
- Replace chipped magnets (12x12x12 mm) in SR3 IP, H1 and H2.
Mitaka or remotely
- Write generic Type B Guardian; make BS and SR3 inherit from it; make analog WD optional for now (all suspensions will get them eventually).
- Create software stepper drivers for SR3 and SRM and link to them from STEP_MASTER.adl screen.
- Make three in-air stepper splitter cables for SR2, SR3 and SRM. [done?]
- (Continue to) soak the sapphire prisms off the dummy BS for reuse on the SRM metal mass.
- Set up SR2 Guardian.
- Install damping filters for SR2.
- Review DAC channel requests.
- Set up SR2 Guardian.
- Install damping filters for SR2.
- Split SRx real-time models?
Ordering
See ../WishList .