Line 22: | Line 22: |
=== 2018-07-09 === ==== Main Sequence ==== * --(Get studs for arc weights.)-- * --(Get laser level, preferably the red Tajita one.)-- * --(Finish in-vacuum cabling.)-- * --(Correct flipped connections in SR3 PI LVDTs.)-- * Put up second safety bar. * Retrieve BNC-Lemo cable from Nakano-kun. * Tune PI LVDT driver box. * --(Plug in spare sat amps.)-- * Set up optical lever. * Check/restore alignment of payload, especially optic pitch. * Install and cable geophones. * Install arc weights. |
=== 2018-08-15 === ==== SR3 ==== * Controls work (Enzo and team). * Diagonalize OL (Terrence). * Do SF damper test (Hatoya-san). * Tune IP (Fujii-kun). === 2018-08-20 === ==== SR3 ==== * Hook LBB, add ballast mass. |
Line 37: | Line 33: |
* Make three in-air stepper splitter cables for SR2, SR3 and SRM. * Calibrate PI LVDTs and FRs. * Cabling, testing, TFs. |
|
Line 41: | Line 34: |
==== F0/LBB Stuff ==== * --(Finalize PI #1 for SR2; crane into SR2 cleanbooth.)-- * --(Remove SR3 tank lid, crane LBB rings to top of lower half of the tank, clamp in position.)-- * Set tank jacks to nominal height. * Clear space for PI #2 (SRM) work. |
==== SR2 ==== * Adjust ballast/trim mass, with reserve for yaw stepper. * Cable/test PI items (LVDTs, steppers, geophones). * Set damper height. * Add arc weights, adjust IP. * Stage LBB damper rings in tank. ==== SRM ==== * Check gluing result - redo if necessary. * Assemble RM. * Add IM ballast masses (we forgot this before). * Get parts from AOL and set up new pitch-setting OL. * Hang metal mass. * Hang RM. |
Line 48: | Line 50: |
* --(Check S-numbers of BS sat amps and SR sat amps returned to Mozumi, and update electronic items lists.)-- * Review/improve macro file fixes for split models; write klog; submit changes to SVN. * Get at least one BIO Converter chassis fully connected (CONTEC BIO card, WD and stepper motor chassis) for implementation and test of stepper motor reset function. * Write generic Type B Guardian; make BS and SR3 inherit from it; make analog WD optional for now (all suspensions will get them eventually). * Create software stepper drivers for SR3 and SRM and link to them from STEP_MASTER.adl screen. === 2018-07-16 === ==== Main Sequence ==== * Lock suspension. * Crane into tank. * Unlock suspension. * Rearrange cables. * Test. ==== F0/LBB Stuff ==== * Install correct IP in PI #2. * Crane PI #2 to second floor. * Rebuild top filter of PI #2. |
|
Line 70: | Line 55: |
* Rebuild PI #2 F0 for SRM. * Retrieve BNC-Lemo cable from Nakano-kun. * Get at least one BIO Converter chassis fully connected (CONTEC BIO card, WD and stepper motor chassis) for implementation and test of stepper motor reset function. |
|
Line 71: | Line 59: |
* Correct flipped connections in SR2 PI LVDTs. | |
Line 74: | Line 61: |
* Get independent power supply for SR3 so SR2 can be powered back up. | |
Line 77: | Line 63: |
* Rebuild filter in PI #1. * Install clamps on PI #1. * Install geophone plates on PI #3. * Install geophone plates on PI #1. * Install correct IP in PI #2. * Rebuild filter in PI #2. * Install clamps on PI #2. * Install LBB blade units on PI #2. * Install geophone plates on PI #2. |
* Install geophone plates on PI #1 for SR2. * Rebuild filter in PI #2 for SRM. * Install clamps on PI #2 for SRM. * Install LBB blade units on PI #2 for SRM. * Install geophone plates on PI #2 for SRM. * Replace chipped magnets (12x12x12 mm) in SR3 IP, H1 and H2. |
Line 88: | Line 71: |
* Write generic Type B Guardian; make BS and SR3 inherit from it; make analog WD optional for now (all suspensions will get them eventually). * Create software stepper drivers for SR3 and SRM and link to them from STEP_MASTER.adl screen. |
|
Line 92: | Line 77: |
* Review Shoda-san's Guardian. * Review DIO stuff. |
VIS Type B SR Near Term To-Do List
Preparation for SR Installation
Every Week
Facilities
- Vacuum and roll floor.
- Wipe ladders, assembly frame.
- Tidy tools, parts.
Get stuff from ../WishList
Coming Weeks
2018-08-15
SR3
- Controls work (Enzo and team).
- Diagonalize OL (Terrence).
- Do SF damper test (Hatoya-san).
- Tune IP (Fujii-kun).
2018-08-20
SR3
- Hook LBB, add ballast mass.
- Tune IP.
SR2
- Adjust ballast/trim mass, with reserve for yaw stepper.
- Cable/test PI items (LVDTs, steppers, geophones).
- Set damper height.
- Add arc weights, adjust IP.
- Stage LBB damper rings in tank.
SRM
- Check gluing result - redo if necessary.
- Assemble RM.
- Add IM ballast masses (we forgot this before).
- Get parts from AOL and set up new pitch-setting OL.
- Hang metal mass.
- Hang RM.
Software Etc
SR Prep Tasks - To Be Scheduled
Tunnel
- Rebuild PI #2 F0 for SRM.
- Retrieve BNC-Lemo cable from Nakano-kun.
- Get at least one BIO Converter chassis fully connected (CONTEC BIO card, WD and stepper motor chassis) for implementation and test of stepper motor reset function.
- Install, cable SR3 PI yaw stepper.
- Correct flipped connections in SRM PI LVDTs.
- Grab and configure a picomotor driver as SR2_BF 10.68.150.25.
- Check SR2, SR3 TM coil gains for magnet polarity compensation.
- Calibrate last six IM OSEMs.
- Install geophone plates on PI #1 for SR2.
- Rebuild filter in PI #2 for SRM.
- Install clamps on PI #2 for SRM.
- Install LBB blade units on PI #2 for SRM.
- Install geophone plates on PI #2 for SRM.
- Replace chipped magnets (12x12x12 mm) in SR3 IP, H1 and H2.
Mitaka or remotely
- Write generic Type B Guardian; make BS and SR3 inherit from it; make analog WD optional for now (all suspensions will get them eventually).
- Create software stepper drivers for SR3 and SRM and link to them from STEP_MASTER.adl screen.
- Make three in-air stepper splitter cables for SR2, SR3 and SRM. [done?]
- (Continue to) soak the sapphire prisms off the dummy BS for reuse on the SRM metal mass.
- Set up SR2 Guardian.
- Install damping filters for SR2.
- Review DAC channel requests.
- Set up SR2 Guardian.
- Install damping filters for SR2.
- Split SRx real-time models?
Ordering
See ../WishList .