Line 29: Line 29:
 * Calibrate F0 LVDT actuation and FR.
 * Set safety screw and safety nut on
F0 keystone; remove Kapton tape.
 * Set up optical lever.
 * Check/restore alignment of payload, especially optic pitch.
 * Do token TFs (time permitting).
 * Reset all PI FRs to midrange.
 * Lock F0 keystone.
 *
Lock suspension laterally except for SF level.
 *
Add IM-RM safety bar?
 *
Disconnect all cables at inside of feedthroughs.
 *
Remove top of tank (including service ring).
 *
Set tank jacks to nominal height (50 mm).
 *
Lift suspension.
 *
Install LBB damper rods.
 *
Crane suspension into tank.
 *
Hook LBB damper rods.
 *
Replace tank lid and service ring.
 * --(Set safety screw and safety nut on F0 keystone; remove Kapton tape.)--
 * --(Set up optical lever.)--
 * --(Check/restore alignment of payload, especially optic pitch.)--
 * --(Do token TFs (time permitting).)--
 * --(
Lock F0 keystone.)--
 * --(
Lock suspension laterally except for SF level.)--
 * --(
Add IM-RM safety bar.)--
 * --(
Disconnect all cables at inside of feedthroughs.)--
 * --(
Remove top of tank (including service ring).)--
 * --(
Set tank jacks to nominal height (50 mm).)--
 * --(
Lift suspension.)--
 * --(
Install LBB damper rods.)--
 * --(
Crane suspension into tank.)--
 * --(
Hook LBB damper rods.)--
 * --(
Replace tank lid and service ring.)--
Line 49: Line 47:
 * Test cables.
 * Calibrate PI LVDT and FR actuation.
Line 57: Line 57:
 * Add LBB ballast masses.
 *
Help Sato-san with swapping IP in PI #2.
 * Crane IP to second floor.
 * --(Help Sato-san with swapping IP in PI #2.)--
 * --(Crane IP to second floor.)--

VIS Type B SR Near Term To-Do List

Archived To-Do Items

Every Week

Coming Weeks

Preparation for SR Installation

Every Week

Facilities

  • Vacuum and roll floor.
  • Wipe ladders, assembly frame.
  • Tidy tools, parts.
  • Get stuff from ../WishList

Coming Weeks

2018-07-17

Main Sequence

  • Find LBB damper rods and associated parts.

  • Check/restore verticality of security structure.

  • Set SF damper magnet ring height.

  • Check/correct IP LVDT polarities.

  • Calibrate IP FR sensing.

  • Set safety screw and safety nut on F0 keystone; remove Kapton tape.

  • Set up optical lever.

  • Check/restore alignment of payload, especially optic pitch.

  • Do token TFs (time permitting).

  • Lock F0 keystone.

  • Lock suspension laterally except for SF level.

  • Add IM-RM safety bar.

  • Disconnect all cables at inside of feedthroughs.

  • Remove top of tank (including service ring).

  • Set tank jacks to nominal height (50 mm).

  • Lift suspension.

  • Install LBB damper rods.

  • Crane suspension into tank.

  • Hook LBB damper rods.

  • Replace tank lid and service ring.

  • Remove tank lid leaving service ring.
  • Move feedthroughs.
  • Move cables over.
  • Test cables.
  • Calibrate PI LVDT and FR actuation.
  • Remove safety bar and unlock suspension.
  • Remove First Contact?
  • Restore payload alignment, especially pitch.
  • Cable geophones.
  • Calibrate IP LVDT and FR actuation.
  • TFs!

F0/LBB/Tank Stuff

  • Help Sato-san with swapping IP in PI #2.

  • Crane IP to second floor.

  • Rebuild PI #2 F0.

Software Etc

SR Prep Tasks - To Be Scheduled

Tunnel

  • Retrieve BNC-Lemo cable from Nakano-kun.
  • Get at least one BIO Converter chassis fully connected (CONTEC BIO card, WD and stepper motor chassis) for implementation and test of stepper motor reset function.
  • Install, cable SR3 PI yaw stepper.
  • Correct flipped connections in SR2 PI LVDTs.
  • Correct flipped connections in SRM PI LVDTs.
  • Grab and configure a picomotor driver as SR2_BF 10.68.150.25.
  • Get independent power supply for SR3 so SR2 can be powered back up.
  • Check SR2, SR3 TM coil gains for magnet polarity compensation.
  • Calibrate last six IM OSEMs.
  • Rebuild filter in PI #1.
  • Install clamps on PI #1.
  • Install geophone plates on PI #3.
  • Install geophone plates on PI #1.
  • Install correct IP in PI #2.
  • Rebuild filter in PI #2.
  • Install clamps on PI #2.
  • Install LBB blade units on PI #2.
  • Install geophone plates on PI #2.
  • Replace chipped magnets (12x12x12 mm) in SR3 IP, H1 and H2.

Mitaka or remotely

  • Write generic Type B Guardian; make BS and SR3 inherit from it; make analog WD optional for now (all suspensions will get them eventually).
  • Create software stepper drivers for SR3 and SRM and link to them from STEP_MASTER.adl screen.
  • Make three in-air stepper splitter cables for SR2, SR3 and SRM. [done?]
  • (Continue to) soak the sapphire prisms off the dummy BS for reuse on the SRM metal mass.
  • Set up SR2 Guardian.
  • Install damping filters for SR2.
  • Review DAC channel requests.
  • Set up SR2 Guardian.
  • Install damping filters for SR2.
  • Split SRx real-time models?

Ordering

See ../WishList .