Line 22: Line 22:
=== 2018-07-17 ===
==== Main Sequence ====
 * --(Find LBB damper rods and associated parts.)--
 * --(Check/restore verticality of security structure.)--
 * --(Set SF damper magnet ring height.)--
 * --(Check/correct IP LVDT polarities.)--
 * --(Calibrate IP FR sensing.)--
 * --(Set safety screw and safety nut on F0 keystone; remove Kapton tape.)--
 * --(Set up optical lever.)--
 * --(Check/restore alignment of payload, especially optic pitch.)--
 * --(Do token TFs (time permitting).)--
 * --(Lock F0 keystone.)--
 * --(Lock suspension laterally except for SF level.)--
 * --(Add IM-RM safety bar.)--
 * --(Disconnect all cables at inside of feedthroughs.)--
 * --(Remove top of tank (including service ring).)--
 * --(Set tank jacks to nominal height (50 mm).)--
 * --(Lift suspension.)--
 * --(Install LBB damper rods.)--
 * --(Crane suspension into tank.)--
 * --(Hook LBB damper rods.)--
 * --(Replace tank lid and service ring.)--
 * Remove tank lid leaving service ring.
 * Move feedthroughs.
 * Move cables over.
 * Test cables.
 * Calibrate PI LVDT and FR actuation.
 * Remove safety bar and unlock suspension.
 * Remove First Contact?
 * Restore payload alignment, especially pitch.
 * Cable geophones.
 * Calibrate IP LVDT and FR actuation.
 * TFs!
=== 2018-10-22 ===
==== SRM (top priority) ====
 * Main sequence
  * Adjust H2 and H3 OSEMs laterally and in/out.
  * Weigh BF/... section and adjust trim mass to fix pitch/roll.
  * Anchor cables to BF cap.
  * Install SF crossbars.
  * Build up SS to SF ring.
  * Bring in SF.
  * Hook BF/... .
 * PI
  * Add more cable clamps.
  * Get and install CuBe spring.
 * Electronics
  * Scavenge HPCDs from SR2 and SR3.
  * Organize to get LPCDs modified.
Line 56: Line 39:
==== F0/LBB/Tank Stuff ====
 * --(Help Sato-san with swapping IP in PI #2.)--
 * --(Crane IP to second floor.)--
 * Rebuild PI #2 F0.
==== SR2 (low priority) ====
 * More TFs
 * Add more arc weights?
 * Do control filter design and installation.
 * Do measurement of yaw torque required for F0 yaw adjustment.
 * Gather items for SR2 OL.
Line 61: Line 46:
==== Software Etc ==== ==== Etc ====
 * Tidy up:
  * Gather all PR/SR gluing tools and clean/label/organize them.
  * Move safety bar stuff to portable cleanroom between SR2 and SR3.
  * Clear space under SR3 stairs.
  * Etc, etc, etc.
 * Monitor AF disassembly.
 * Get SR2 optical table moved to SR3 area (under stairs).
 * Move cables; set up for geophone testing.
 * Make more feedthrough adaptors.
Line 67: Line 61:
 * Retrieve BNC-Lemo cable from Nakano-kun.
Line 69: Line 62:
 * Install, cable SR3 PI yaw stepper.
 * Correct flipped connections in SR2 PI LVDT
s.
 * Install, cable PI yaw steppers.
Line 72: Line 64:
 * Grab and configure a picomotor driver as SR2_BF 10.68.150.25.
 * Get independent power supply for SR3 so SR2 can be powered back up.
Line 75: Line 65:
 * Calibrate last six IM OSEMs.
 * Rebuild filter in PI #1.
 * Install clamps on PI #1.
 * Install geophone plates on PI #3.
 * Install geophone plates on PI #1.
 * Install correct IP in PI #2.
 * Rebuild filter in PI #2.
 * Install clamps on PI #2.
 * Install LBB blade units on PI #2.
 * Install geophone plates on PI #2.

VIS Type B SR Near Term To-Do List

Archived To-Do Items

Every Week

Coming Weeks

Preparation for SR Installation

Every Week

Facilities

  • Vacuum and roll floor.
  • Wipe ladders, assembly frame.
  • Tidy tools, parts.
  • Get stuff from ../WishList

Coming Weeks

2018-10-22

SRM (top priority)

  • Main sequence
    • Adjust H2 and H3 OSEMs laterally and in/out.
    • Weigh BF/... section and adjust trim mass to fix pitch/roll.
    • Anchor cables to BF cap.
    • Install SF crossbars.
    • Build up SS to SF ring.
    • Bring in SF.
    • Hook BF/... .
  • PI
    • Add more cable clamps.
    • Get and install CuBe spring.

  • Electronics
    • Scavenge HPCDs from SR2 and SR3.
    • Organize to get LPCDs modified.

SR2 (low priority)

  • More TFs
  • Add more arc weights?
  • Do control filter design and installation.
  • Do measurement of yaw torque required for F0 yaw adjustment.
  • Gather items for SR2 OL.

Etc

  • Tidy up:
    • Gather all PR/SR gluing tools and clean/label/organize them.
    • Move safety bar stuff to portable cleanroom between SR2 and SR3.
    • Clear space under SR3 stairs.
    • Etc, etc, etc.
  • Monitor AF disassembly.
  • Get SR2 optical table moved to SR3 area (under stairs).
  • Move cables; set up for geophone testing.
  • Make more feedthrough adaptors.

SR Prep Tasks - To Be Scheduled

Tunnel

  • Get at least one BIO Converter chassis fully connected (CONTEC BIO card, WD and stepper motor chassis) for implementation and test of stepper motor reset function.
  • Install, cable PI yaw steppers.
  • Correct flipped connections in SRM PI LVDTs.
  • Check SR2, SR3 TM coil gains for magnet polarity compensation.
  • Replace chipped magnets (12x12x12 mm) in SR3 IP, H1 and H2.

Mitaka or remotely

  • Write generic Type B Guardian; make BS and SR3 inherit from it; make analog WD optional for now (all suspensions will get them eventually).
  • Create software stepper drivers for SR3 and SRM and link to them from STEP_MASTER.adl screen.
  • Make three in-air stepper splitter cables for SR2, SR3 and SRM. [done?]
  • (Continue to) soak the sapphire prisms off the dummy BS for reuse on the SRM metal mass.
  • Set up SR2 Guardian.
  • Install damping filters for SR2.
  • Review DAC channel requests.
  • Set up SR2 Guardian.
  • Install damping filters for SR2.
  • Split SRx real-time models?

Ordering

See ../WishList .