2688
Comment:
|
2655
|
Deletions are marked like this. | Additions are marked like this. |
Line 22: | Line 22: |
=== 2018-08-15 === ==== SR3 ==== * Controls work (Enzo and team). * Diagonalize OL (Terrence). * Do SF damper test (Hatoya-san). * Tune IP (Fujii-kun). |
=== 2018-10-22 === ==== SRM (top priority) ==== * Main sequence * Adjust H2 and H3 OSEMs laterally and in/out. * Weigh BF/... section and adjust trim mass to fix pitch/roll. * Anchor cables to BF cap. * Install SF crossbars. * Build up SS to SF ring. * Bring in SF. * Hook BF/... . * PI * Add more cable clamps. * Get and install CuBe spring. * Electronics * Scavenge HPCDs from SR2 and SR3. * Organize to get LPCDs modified. |
Line 29: | Line 39: |
=== 2018-08-20 === ==== SR3 ==== * Hook LBB, add ballast mass. * Tune IP. |
==== SR2 (low priority) ==== * More TFs * Add more arc weights? * Do control filter design and installation. * Do measurement of yaw torque required for F0 yaw adjustment. * Gather items for SR2 OL. |
Line 34: | Line 46: |
==== SR2 ==== * Adjust ballast/trim mass, with reserve for yaw stepper. * Cable/test PI items (LVDTs, steppers, geophones). * Set damper height. * Add arc weights, adjust IP. * Stage LBB damper rings in tank. ==== SRM ==== * Check gluing result - redo if necessary. * Assemble RM. * Add IM ballast masses (we forgot this before). * Get parts from AOL and set up new pitch-setting OL. * Hang metal mass. * Hang RM. ==== Software Etc ==== |
==== Etc ==== * Tidy up: * Gather all PR/SR gluing tools and clean/label/organize them. * Move safety bar stuff to portable cleanroom between SR2 and SR3. * Clear space under SR3 stairs. * Etc, etc, etc. * Monitor AF disassembly. * Get SR2 optical table moved to SR3 area (under stairs). * Move cables; set up for geophone testing. * Make more feedthrough adaptors. |
Line 55: | Line 61: |
* Rebuild PI #2 F0 for SRM. * Retrieve BNC-Lemo cable from Nakano-kun. |
|
Line 58: | Line 62: |
* Install, cable SR3 PI yaw stepper. | * Install, cable PI yaw steppers. |
Line 60: | Line 64: |
* Grab and configure a picomotor driver as SR2_BF 10.68.150.25. | |
Line 62: | Line 65: |
* Calibrate last six IM OSEMs. * Install geophone plates on PI #1 for SR2. * Rebuild filter in PI #2 for SRM. * Install clamps on PI #2 for SRM. * Install LBB blade units on PI #2 for SRM. * Install geophone plates on PI #2 for SRM. |
VIS Type B SR Near Term To-Do List
Preparation for SR Installation
Every Week
Facilities
- Vacuum and roll floor.
- Wipe ladders, assembly frame.
- Tidy tools, parts.
Get stuff from ../WishList
Coming Weeks
2018-10-22
SRM (top priority)
- Main sequence
- Adjust H2 and H3 OSEMs laterally and in/out.
- Weigh BF/... section and adjust trim mass to fix pitch/roll.
- Anchor cables to BF cap.
- Install SF crossbars.
- Build up SS to SF ring.
- Bring in SF.
- Hook BF/... .
- PI
- Add more cable clamps.
Get and install CuBe spring.
- Electronics
- Scavenge HPCDs from SR2 and SR3.
- Organize to get LPCDs modified.
SR2 (low priority)
- More TFs
- Add more arc weights?
- Do control filter design and installation.
- Do measurement of yaw torque required for F0 yaw adjustment.
- Gather items for SR2 OL.
Etc
- Tidy up:
- Gather all PR/SR gluing tools and clean/label/organize them.
- Move safety bar stuff to portable cleanroom between SR2 and SR3.
- Clear space under SR3 stairs.
- Etc, etc, etc.
- Monitor AF disassembly.
- Get SR2 optical table moved to SR3 area (under stairs).
- Move cables; set up for geophone testing.
- Make more feedthrough adaptors.
SR Prep Tasks - To Be Scheduled
Tunnel
- Get at least one BIO Converter chassis fully connected (CONTEC BIO card, WD and stepper motor chassis) for implementation and test of stepper motor reset function.
- Install, cable PI yaw steppers.
- Correct flipped connections in SRM PI LVDTs.
- Check SR2, SR3 TM coil gains for magnet polarity compensation.
- Replace chipped magnets (12x12x12 mm) in SR3 IP, H1 and H2.
Mitaka or remotely
- Write generic Type B Guardian; make BS and SR3 inherit from it; make analog WD optional for now (all suspensions will get them eventually).
- Create software stepper drivers for SR3 and SRM and link to them from STEP_MASTER.adl screen.
- Make three in-air stepper splitter cables for SR2, SR3 and SRM. [done?]
- (Continue to) soak the sapphire prisms off the dummy BS for reuse on the SRM metal mass.
- Set up SR2 Guardian.
- Install damping filters for SR2.
- Review DAC channel requests.
- Set up SR2 Guardian.
- Install damping filters for SR2.
- Split SRx real-time models?
Ordering
See ../WishList .