=== 2018-08-27 === ==== SR3 ==== * Hook LBB, add ballast mass (Hirata-san++). * Tune IP (Fujii-kun). * Install LEN OL. |
=== 2018-10-01 === ==== Etc ==== * Take SRM LVDT driver out of rack for Lucia. ==== SR2 ==== * --(Turn off KOACH filters in tank and see if BF keystone rises.)-- * --(Install shelves in small rack, and put sat amps, drivers, etc inside.)-- * --(Run power and network to pico drivers and steppers.)-- * --(Test picos.)-- * --(Test GAS steppers.)-- * --(Adjust pitch/roll of IM with picos.)-- * --(Offload BF GAS LVDT offset with FR stepper.)-- * Receive extra cables (Type 1 and 2). * Cable IP items: * Geophones * LVDTs * Steppers * Add arc weights and geophones. (Might have to reserve one geophone for Fujii-Fun - check.) * Test IP items. * Geophones * LVDTs * Steppers * Unlock and center IP. * More TFs. |
Line 28: | Line 46: |
==== SR2 ==== * Adjust ballast/trim mass, with reserve for yaw stepper. * Cable/test PI items (LVDTs, steppers, geophones; Kozu-kun++). * Set damper height. * Add arc weights, adjust IP. |
|
Line 35: | Line 47: |
* --(Get feedthroughs)--. * Get arc weights. * Install feedthroughs on AF. * Set up pitch-setting OL. * Add TM OSEM cables. * Set TM pitch and tighten clamps. |
* --(Add TM OSEM cables.)-- * --(Set TM pitch and tighten clamps.)-- |
Line 43: | Line 51: |
* Fire up SRM rack. * ==== Etc ==== |
* Add and adjust position of jacks at top level. * Suspend and weigh IM/... section. * Add BF crossbars to AF. * Build up SS to BF level. * Suspend IM/... section and adjust ballast/trim masses. * Install feedthroughs on AF (3 available; need to get a 4th). * Arrange power to SRM rack and get it running. * Check the IRIG-B 9999xx fix has been applied (klog [[http://klog.icrr.u-tokyo.ac.jp/osl/index.php?r=6031||6031]]). |
Line 47: | Line 60: |
* Update electronics items lists to reflect removed ADC stuff. | ==== SR3 ==== * ''Don't even '''think''' about doing anything with SR3.'' |
Line 53: | Line 68: |
* Add SR3 LBB ballast mass. * Install SR3 LEN OL. |
|
Line 60: | Line 77: |
* Calibrate last six IM OSEMs. * Install geophone plates on PI #1 for SR2. |
|
Line 63: | Line 78: |
* Clean/Replace yoke in PI #2 for SRM. |
VIS Type B SR Near Term To-Do List
Preparation for SR Installation
Every Week
Facilities
- Vacuum and roll floor.
- Wipe ladders, assembly frame.
- Tidy tools, parts.
Get stuff from ../WishList
Coming Weeks
2018-10-01
Etc
- Take SRM LVDT driver out of rack for Lucia.
SR2
Turn off KOACH filters in tank and see if BF keystone rises.
Install shelves in small rack, and put sat amps, drivers, etc inside.
Run power and network to pico drivers and steppers.
Test picos.
Test GAS steppers.
Adjust pitch/roll of IM with picos.
Offload BF GAS LVDT offset with FR stepper.
- Receive extra cables (Type 1 and 2).
- Cable IP items:
- Geophones
- LVDTs
- Steppers
- Add arc weights and geophones. (Might have to reserve one geophone for Fujii-Fun - check.)
- Test IP items.
- Geophones
- LVDTs
- Steppers
- Unlock and center IP.
- More TFs.
SRM
Add TM OSEM cables.
Set TM pitch and tighten clamps.
- Set RM pitch and tighten clamps.
- Remove winch system and restore items removed from top of IM.
- Add and adjust position of jacks at top level.
- Suspend and weigh IM/... section.
- Add BF crossbars to AF.
- Build up SS to BF level.
- Suspend IM/... section and adjust ballast/trim masses.
- Install feedthroughs on AF (3 available; need to get a 4th).
- Arrange power to SRM rack and get it running.
Check the IRIG-B 9999xx fix has been applied (klog http://klog.icrr.u-tokyo.ac.jp/osl/index.php?r=6031).
SR3
Don't even think about doing anything with SR3.
SR Prep Tasks - To Be Scheduled
Tunnel
- Add SR3 LBB ballast mass.
- Install SR3 LEN OL.
- Rebuild PI #2 F0 for SRM.
- Retrieve BNC-Lemo cable from Nakano-kun.
- Get at least one BIO Converter chassis fully connected (CONTEC BIO card, WD and stepper motor chassis) for implementation and test of stepper motor reset function.
- Install, cable SR3 PI yaw stepper.
- Correct flipped connections in SRM PI LVDTs.
- Grab and configure a picomotor driver as SR2_BF 10.68.150.25.
- Check SR2, SR3 TM coil gains for magnet polarity compensation.
- Rebuild filter in PI #2 for SRM.
- Clean/Replace yoke in PI #2 for SRM.
- Install clamps on PI #2 for SRM.
- Install LBB blade units on PI #2 for SRM.
- Install geophone plates on PI #2 for SRM.
- Replace chipped magnets (12x12x12 mm) in SR3 IP, H1 and H2.
Mitaka or remotely
- Write generic Type B Guardian; make BS and SR3 inherit from it; make analog WD optional for now (all suspensions will get them eventually).
- Create software stepper drivers for SR3 and SRM and link to them from STEP_MASTER.adl screen.
- Make three in-air stepper splitter cables for SR2, SR3 and SRM. [done?]
- (Continue to) soak the sapphire prisms off the dummy BS for reuse on the SRM metal mass.
- Set up SR2 Guardian.
- Install damping filters for SR2.
- Review DAC channel requests.
- Set up SR2 Guardian.
- Install damping filters for SR2.
- Split SRx real-time models?
Ordering
See ../WishList .