Differences between revisions 99 and 131 (spanning 32 versions)
Revision 99 as of 2018-09-06 10:26:15
Size: 3667
Editor: MarkBarton
Comment:
Revision 131 as of 2018-12-14 13:50:10
Size: 2244
Editor: MarkBarton
Comment:
Deletions are marked like this. Additions are marked like this.
Line 22: Line 22:
=== 2018-09-03 ===
==== Etc ====
 * --(Check SR2-SR3 duct (since Mirapro moved it) to see if we have adequate space at both ends.)--
 * --(Help crane inspectors on Monday and Wednesday mornings.)--
 * --(Inspect all crane slot curtains (SR, BS, PR), note which are missing, and decide which should be closed up immediately versus later. (For example, SR2 and SR3 have missing curtains that could be replaced semi-permanently because we probably don't need to crane stuff into those areas anymore.))--
 * Shut down all electronics before leaving on Friday.
 * Update electronics items lists to reflect removed ADC stuff.
=== 2018-12-17 ===
==== SRM ====
 * Install/test new yaw mechanism.
 * Adjust height.
 * Check/adjust optic pitch; release LED to SR2.
 * Install Enomoto-kun's beam target plate (if available).
 * Install extension cord for pico drivers.
 * Find two geophone cables used by Okutomi-san. (I looked in the second floor EXV room but didn't find them - Mark.)
 * Find one geophone cable ordered for SRM but missing.
 * Rearrange miswired geophone cable.
 * Rebuild defective geophone cable.
 * Seal geophones.
 * Install geophones and arc weights.
 * Center IP.
==== SR3 ====
 * Install/test new yaw mechanism.
 * Adjust height.
 * Realign OL.
Line 30: Line 41:
==== SR2 (highest priority) ====
 * Cable PI items
  * --(LVDTs)--
  * Steppers
  * Geophones
 * Finish in-air cabling.
 * Do basic go/no-go test of electronic items.
  * --(IM OSEMs.)--
  * Picos.
  * Steppers.
  * F0 LVDT.
  * SF LVDT.
  * BF LVDT.
  * IP LVDT.
  * Geophones.
 * Adjust ballast/trim mass of SF, with reserve for yaw stepper.
 * Set SF damper magnet ring height.
 * Check/tweak alignment of chain and security structure.
 * Fix IM yaw.
 * Check alignment of IM OSEMs.
 * Check optic pitch.
 * --(Center all IP FRs.)--
 * --(Add arc weights and geophones and center IP.)--
 * Crane suspension into tank
 
==== SRM (as time permits) ====
 * Set up pitch-setting OL.
 * Add TM OSEM cables.
 * Set TM pitch and tighten clamps.
 * Set RM pitch and tighten clamps.
 * Remove winch system and restore items removed from top of IM.
 * Install feedthroughs on AF.
 * Fire up SRM rack.

==== SR3 ====
 * ''Don't even '''think''' about doing anything with SR3.''
 
==== SR2 ====
 * Install/test new yaw adjuster.
 * Adjust height.
 * Get top plate reduced?
 * Set up OL cabling.
 * Set up OL.
 * Remove tape, writing etc on PI and PI items.
 * Add new feedthrough to lower part of tank (with Izumi-san-tachi)?
 * Install cable for MIF pico on LBB (with Izumi-san-tachi)?
 * Add ballast mass to LBB.
Line 72: Line 56:
 * Add SR3 LBB ballast mass.
 * Install SR3 LEN OL.
 * Rebuild PI #2 F0 for SRM.
 * Retrieve BNC-Lemo cable from Nakano-kun.
Line 77: Line 57:
 * Install, cable SR3 PI yaw stepper.
 * Correct flipped connections in SRM PI LVDTs.
 * Grab and configure a picomotor driver as SR2_BF 10.68.150.25.
Line 81: Line 58:
 * Calibrate last six IM OSEMs.
 * Install geophone plates on PI #1 for SR2.
 * Rebuild filter in PI #2 for SRM.
 * Install clamps on PI #2 for SRM.
 * Install LBB blade units on PI #2 for SRM.
 * Install geophone plates on PI #2 for SRM.
Line 91: Line 62:
 * Create software stepper drivers for SR3 and SRM and link to them from STEP_MASTER.adl screen.
 * Make three in-air stepper splitter cables for SR2, SR3 and SRM. [done?]
Line 94: Line 63:
 * Set up SR2 Guardian.
Line 97: Line 65:
 * Set up SR2 Guardian.
 * Install damping filters for SR2.

VIS Type B SR Near Term To-Do List

Archived To-Do Items

Every Week

Coming Weeks

Preparation for SR Installation

Every Week

Facilities

  • Vacuum and roll floor.
  • Wipe ladders, assembly frame.
  • Tidy tools, parts.
  • Get stuff from ../WishList

Coming Weeks

2018-12-17

SRM

  • Install/test new yaw mechanism.
  • Adjust height.
  • Check/adjust optic pitch; release LED to SR2.
  • Install Enomoto-kun's beam target plate (if available).
  • Install extension cord for pico drivers.
  • Find two geophone cables used by Okutomi-san. (I looked in the second floor EXV room but didn't find them - Mark.)
  • Find one geophone cable ordered for SRM but missing.
  • Rearrange miswired geophone cable.
  • Rebuild defective geophone cable.
  • Seal geophones.
  • Install geophones and arc weights.
  • Center IP.

SR3

  • Install/test new yaw mechanism.
  • Adjust height.
  • Realign OL.

SR2

  • Install/test new yaw adjuster.
  • Adjust height.
  • Get top plate reduced?
  • Set up OL cabling.
  • Set up OL.
  • Remove tape, writing etc on PI and PI items.
  • Add new feedthrough to lower part of tank (with Izumi-san-tachi)?
  • Install cable for MIF pico on LBB (with Izumi-san-tachi)?
  • Add ballast mass to LBB.

SR Prep Tasks - To Be Scheduled

Tunnel

  • Get at least one BIO Converter chassis fully connected (CONTEC BIO card, WD and stepper motor chassis) for implementation and test of stepper motor reset function.
  • Check SR2, SR3 TM coil gains for magnet polarity compensation.
  • Replace chipped magnets (12x12x12 mm) in SR3 IP, H1 and H2.

Mitaka or remotely

  • Write generic Type B Guardian; make BS and SR3 inherit from it; make analog WD optional for now (all suspensions will get them eventually).
  • (Continue to) soak the sapphire prisms off the dummy BS for reuse on the SRM metal mass.
  • Install damping filters for SR2.
  • Review DAC channel requests.
  • Split SRx real-time models?

Ordering

See ../WishList .