Differences between revisions 3 and 4
Revision 3 as of 2016-01-29 13:05:55
Size: 248
Editor: MarkBarton
Comment:
Revision 4 as of 2016-02-17 16:35:08
Size: 511
Editor: MarkBarton
Comment:
Deletions are marked like this. Additions are marked like this.
Line 8: Line 8:

 * [[http://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=4235|JGW-E1504235 - BS Installation Procedure]]
 * [[http://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=4817|JGW-E1604817 - BS Payload Assembly Procedure]]
 

KAGRA VIS - Type B Suspensions

The Type B suspension has an IP with a GAS filter, two more GAS stages (standard filter and bottom filter) and a payload.

The SRs have a Type-Bp-style payload. The BS has a custom payload.

/TaskList

KAGRA/Subgroups/VIS/TypeB (last edited 2019-06-14 01:29:24 by terrence.tsang)