Differences between revisions 1 and 4 (spanning 3 versions)
Revision 1 as of 2016-06-08 14:31:02
Size: 1126
Editor: YoichiAso
Comment:
Revision 4 as of 2016-06-08 15:26:50
Size: 723
Editor: YoichiAso
Comment:
Deletions are marked like this. Additions are marked like this.
Line 1: Line 1:
= VIS Meeting on 2016/6/10 = = Agenda of the VIS Meeting on 2016/6/10 =
Line 18: Line 18:
Line 20: Line 19:
Line 25: Line 23:
 * LVDT for BF damping   * LVDT for BF damping
Line 27: Line 25:
 * Interference of the interferometer beams with VIS structure
Line 28: Line 27:
== Site work plan for the next week ==
 * Mon:
 * Tue:
 * Wed:
 * Thu:
 * Fri:

BS crane will not be available: 13th -14th of June

== Travel Plans ==
 * Travel (Week of 6/13)
  * Takahashi:
  * Shoda:
  * Mark:
  * Fabian:
  * Okutomi:
  * Fujii:
  * Ishizaki:
  * Hirata:
  * Ohishi:
  * Sato:

 * Travel (Week of 6/20):
  * Takahashi:
  * Shoda:
  * Mark:
  * Fabian:
  * Okutomi:
  * Fujii:
  * Ishizaki:
  * Hirata:
  * Ohishi:

Mark is away: July 8-20

== Next meeting ==
2016/6/17(Fri) 13:30 -

Next VIS F2F 6/17

Next next F2F 7/8
== Plan for the coming weeks ==
 * Site work plan for the next week
 * Travel Plans
 * Next meeting

Agenda of the VIS Meeting on 2016/6/10

2016/6/10 13:30 - 15:00 @ Room 210

Progress report

Type-A (Takahashi)

  • Type-A schedule chart

Type-B (Mark)

  • Type-B schedule chart

Type-Bp (Shoda)

  • Type-Bp schedule chart

IMMT (Ohishi)

  • IMMT schedule chart

Watchdog system (Tanaka)

Safety

Issues

  • Accelerometers for IP
    • NIKHEF accelerometer measurement results (Fujii)
    • Geophone noise (Takahashi)
  • LVDT for BF damping
    • Any news from Virgo ? (Raffaele)
  • Interference of the interferometer beams with VIS structure

Plan for the coming weeks

  • Site work plan for the next week
  • Travel Plans
  • Next meeting

KAGRA/Subgroups/VIS/VISAgenda20160610 (last edited 2016-06-08 15:26:50 by YoichiAso)