Differences between revisions 1 and 2
Revision 1 as of 2016-06-16 10:00:20
Size: 651
Editor: YoichiAso
Comment:
Revision 2 as of 2016-06-16 10:28:12
Size: 597
Editor: YoichiAso
Comment:
Deletions are marked like this. Additions are marked like this.
Line 6: Line 6:
Line 8: Line 7:
Line 10: Line 8:
Line 12: Line 9:
Line 16: Line 12:
Line 17: Line 14:
 * Accelerometers for IP
 * LVDT for BF damping
  * Any news from Virgo ?
(Raffaele)
 * Interference of the interferometer beams with VIS structure

 * Dummy payload design (Takahashi)
  * We need to make more concrete plan.
 * BS flag/prism glueing problem (Mark)
 * LVDT for BF damping (Shoda, Raffaele)
 * Dummy payloads for Type-A (Takahashi)
  * How difficult it is to make mirror mounted payloads

Agenda of the VIS Meeting on 2016/6/17

2016/6/17 13:30 - 15:00 @ Room 210

Progress report

Type-A (Takahashi)

Type-B (Mark)

Type-Bp (Shoda)

IMMT (Ohishi)

Watchdog system (Tanaka)

Safety

  • Issues happened this week (if any)

Issues

  • BS flag/prism glueing problem (Mark)
  • LVDT for BF damping (Shoda, Raffaele)
  • Dummy payloads for Type-A (Takahashi)
    • How difficult it is to make mirror mounted payloads

Plan for the coming weeks

  • Site work plan for the next week
  • Travel Plans
  • Next meeting

KAGRA/Subgroups/VIS/VISAgenda20160617 (last edited 2016-06-16 15:02:18 by RyutaroTakahashi)