VIS Meeting on 2015/11/5

2015/11/5 After the NAOJ GWPO Meeting (14:00 - ?)

Kamioka NAOJ Room + SeeVogh

Participants:

Schedule

  • Schedule Plan (Aso)

PR

  • Test Hanging Status (Shoda)
    • Galled screws (Takahashi)
    • Production of new EQ stop screws
  • Next week (from 11/9) plan (Aso)
    • Work
    • Travel
  • Cleaning (Aso)
  • Cable status (Takahashi)
    • Takahashi-san will send us the delivery schedule of the remaining cables.
  • Additional PR mirror box (Tatsumi)
  • Production of additional PR winches (Akutsu)
  • PR Optical Bench (Akutsu)
  • OSEM assembly status (Akutsu)
  • RM compensation mass: do we have enough of them ? (Fabian)
  • RM EQ stop screw position (Akutsu, Shoda)

BS

  • BS Assembly Frame Design (Aso, Hirata)
    • We also need to discuss the IM alignment mechanism for hanging frame part
    • Since the frame is very tall, we need a step or intermediate height floor safe work. Mark will give us prefered height
  • BS magnet size (Michimura)
  • BS gluing jigs (Tatsumi)
  • IP Base Clamp (Fabian)
  • Not enough crane height problem (Hirata, Saito)
  • BS clean bag (Aso)
    • Will design it soon as the size of the assembly frame is almost fixed

Other

  • Screw inventory (Ishizaki)
    • Ishizaki-san came to Kamioka to make an inventory of the screws we have.
  • PR suspension model checking (Hirata, Akutsu)
  • Watch dog system (Tanaka)
  • Clean suits (Aso)
  • ETM installation procedure (Takahashi)
  • Magnetism of the OSEM screw (Akutsu)
    • Sekiguchi-kun pointed out a possible problem with magnetism of the screws around OSEM. -> Check with Sekiguchi-kun

  • GAS blade inspection by Virgo (Takahashi)
  • Safety at the site (Takahashi, Ishizaki)

Next meeting

2015/11/13(Fri) after the group meeting.