2015/11/5 After the NAOJ GWPO Meeting (14:00 - ?) 2015/11/5 After the NAOJ GWPO Meeting (14:00 - 17:00)
Line 6: Line 6:
Participants: Participants: Shoda, Takahashi, Fujii, Ohishi, Michimura, Raffaele, Okutomi, Mark, Tatsumi, Akutsu, Manuel, Hirata, Fabian, Ishizaki, Aso
Line 8: Line 8:
==  Schedule ==
== Schedule ==
Line 11: Line 10:
  * Latest schedule chart
  * Control test: are the transfer function measurements necessary ?
   * Remote measurement is a possibility.
   * Change "control test" -> "signal checking" (not including TF measurement)
   * We need to come up with a way to make the working hour longer (two teams taking shifts ?)
Line 13: Line 17:
Line 16: Line 19:
  * Production of new EQ stop screws    * Galled screw was cut.
   * Another screws almost galled, but we were able to remove them.
   * By using turn backles, we lifted the security interface plate horizontall and were able to put the screw without galling.

 * Production of new EQ stop screws (Takahashi)
  * Need to make new EQ stop rods because of the screw galling.
  * We had 6 sets. Now we lost 1set. We need 4 sets for iKAGRA. No need to hurry up in producing them.

 * Digital system (Shoda, Okutomi, Fujii)
  * A simple model with only one filter is available
  * Sattelite box and coil drivers are ready
  * Need to check the OSEM (Tue)
  * '''Where to put the satellite box ? Grounding ? -> Mark '''
  * '''Digital system preparation (confirm that the model works) -> Okutomi '''

 * Cleaning of the chamber (Okutomi)
  * Will consider to out source. '''Aso will talk with Saito-san. '''

 * Cable status (Takahashi)
  * 1st set will be delivered in the next Monday.
  * 2nd set at the end of the next week
  * Remaining ones in the following weeks.
  * Call for shift for cable checking ? Need to establish the checking procedure first. '''Then call for shift (Takahashi) '''

 * Additional PR mirror box (Tatsumi)
  * Order was placed.
  * Delivery before 1st Dec.

 * Production of additional PR winches (Akutsu)
  * Ordered all the parts. Delivery before 1st Dec.
  * '''Assembly work needs to be scheduled '''

 * PR Optical Bench (Akutsu)
  * Ordered the required screws. Delivery in 10 days.
  * Height adjustment will be done at the time as the preparation work for PR3 installation.

 * RM compensation mass: do we have enough of them ? (Fabian)
  * Having some problem with screw model in CAD (density was wrong). Hirata-san is fixing it.
  * '''We should order compensation masses with various thickness (Takahashi) '''
  * Lock nuts may have to be changed to cope with the changed length of the EQ stop screws. -> probably this is not so important.

 * RM EQ stop screw position (Akutsu, Shoda)
  * A stop screw will penetrate an opening in the RM.
  * '''Hirata-san will check if we can move the screw holes up or down to solve the problem. '''
Line 19: Line 65:
  * Work
  * Travel

 * Cleaning (Aso)

 * Cable status (Takahashi)
  * Takahashi-san will send us the delivery schedule of the remaining cables.

 * Additional PR mirror box (Tatsumi)

 * Production of additional PR winches (Akutsu)


 * PR Optical Bench (Akutsu)

 * OSEM assembly status (Akutsu)

 * RM compensation mass: do we have enough of them ? (Fabian)

 * RM EQ stop screw position (Akutsu, Shoda)
  * Mechanical Assembly (Takahashi, Shoda, Mark, Fabian, Fujii)
   * Mon: Put BF
   * Tue: OSEM signal check
   * Wed: Hang IM
   * Thu - Fri: Assemble IMRM
  * Digital system preparation (Okutomi): Try to run the simple model on the computer near the PR3
  * Cleaning: discuss with Hirose-san, Nakano-kun to establish the procedure
  * Travel plan
   * Takahashi: Mon-Thu
   * Shoda: full week
   * Fujii: Wed - Fri.
   * Okutomi: full week
   * Fabian: Wed - Fri.
   * Mark: Mon-Tue
   * Ohishi: Mitaka on Wed. Thu.
   * Aso: Mitaka on Mon.
Line 42: Line 84:
  * We also need to discuss the IM alignment mechanism for hanging frame part   * We need to discuss the IM alignment mechanism for hanging frame part -> Change the scews to ball point ones: Takahashi-san already bought them.
Line 44: Line 86:
  '''-> Mark will send us the drawing with possible step heights. '''
Line 46: Line 89:
  * Recomendation from the special meeting: reduce the size of the magnet by a factor of 30.
  * Paired magnets for reducing the magnetic field noise
  * '''IM magnet size: needs to be checked -> Shimoda, Michimura '''
Line 48: Line 94:
  * We haven't placed order yet. But the company has started some manufacturing.
  * Can we wait 10 days for order until we have the thermal noise result ?

 * Not enough crane height problem (Hirata, Saito)
  * There seems to be some solution.
  * Asked Saito-san to give us the plan.
Line 50: Line 102:

 * Not enough crane height problem (Hirata, Saito)
  * '''Fabian will send a new version soon (by the end of the week) '''
Line 54: Line 105:
  * Will design it soon as the size of the assembly frame is almost fixed   * '''Will design it soon as the size of the assembly frame is almost fixed '''
Line 59: Line 110:
  * Print out the inventory. Check when you use screws.
Line 60: Line 113:
  * EQ stop part is finished
  * Started working on the payload part
Line 61: Line 117:
  * Got a new document from Tanaka-san
Line 62: Line 120:
  * Asked Miyoki-san to order many
Line 63: Line 123:
  * '''Will have a discussion next week '''
Line 64: Line 126:
  * Sekiguchi-kun pointed out a possible problem with magnetism of the screws around OSEM. -> Check with Sekiguchi-kun   * Sekiguchi-kun pointed out a possible problem with magnetism of the screws around OSEM. -> '''Check with Sekiguchi-kun  '''
Line 67: Line 129:
  * Waiting for more information (mostly shipping info) from Ando-san
Line 69: Line 132:
  * Hirose-san will prepare a clean cloth to be put under the 2F floor to catch fallen items.
Line 71: Line 135:
2015/11/13(Fri) after the group meeting. 2015/11/13(Fri) 13:30

VIS Meeting on 2015/11/5

2015/11/5 After the NAOJ GWPO Meeting (14:00 - 17:00)

Kamioka NAOJ Room + SeeVogh

Participants: Shoda, Takahashi, Fujii, Ohishi, Michimura, Raffaele, Okutomi, Mark, Tatsumi, Akutsu, Manuel, Hirata, Fabian, Ishizaki, Aso

Schedule

  • Schedule Plan (Aso)
    • Latest schedule chart
    • Control test: are the transfer function measurements necessary ?
      • Remote measurement is a possibility.
      • Change "control test" -> "signal checking" (not including TF measurement)

      • We need to come up with a way to make the working hour longer (two teams taking shifts ?)

PR

  • Test Hanging Status (Shoda)
    • Galled screws (Takahashi)
      • Galled screw was cut.
      • Another screws almost galled, but we were able to remove them.
      • By using turn backles, we lifted the security interface plate horizontall and were able to put the screw without galling.
  • Production of new EQ stop screws (Takahashi)
    • Need to make new EQ stop rods because of the screw galling.
    • We had 6 sets. Now we lost 1set. We need 4 sets for iKAGRA. No need to hurry up in producing them.
  • Digital system (Shoda, Okutomi, Fujii)
    • A simple model with only one filter is available
    • Sattelite box and coil drivers are ready
    • Need to check the OSEM (Tue)
    • Where to put the satellite box ? Grounding ? -> Mark

    • Digital system preparation (confirm that the model works) -> Okutomi

  • Cleaning of the chamber (Okutomi)
    • Will consider to out source. Aso will talk with Saito-san.

  • Cable status (Takahashi)
    • 1st set will be delivered in the next Monday.
    • 2nd set at the end of the next week
    • Remaining ones in the following weeks.
    • Call for shift for cable checking ? Need to establish the checking procedure first. Then call for shift (Takahashi)

  • Additional PR mirror box (Tatsumi)
    • Order was placed.
    • Delivery before 1st Dec.
  • Production of additional PR winches (Akutsu)
    • Ordered all the parts. Delivery before 1st Dec.
    • Assembly work needs to be scheduled

  • PR Optical Bench (Akutsu)
    • Ordered the required screws. Delivery in 10 days.
    • Height adjustment will be done at the time as the preparation work for PR3 installation.
  • RM compensation mass: do we have enough of them ? (Fabian)
    • Having some problem with screw model in CAD (density was wrong). Hirata-san is fixing it.
    • We should order compensation masses with various thickness (Takahashi)

    • Lock nuts may have to be changed to cope with the changed length of the EQ stop screws. -> probably this is not so important.

  • RM EQ stop screw position (Akutsu, Shoda)
    • A stop screw will penetrate an opening in the RM.
    • Hirata-san will check if we can move the screw holes up or down to solve the problem.

  • Next week (from 11/9) plan (Aso)
    • Mechanical Assembly (Takahashi, Shoda, Mark, Fabian, Fujii)
      • Mon: Put BF
      • Tue: OSEM signal check
      • Wed: Hang IM
      • Thu - Fri: Assemble IMRM
    • Digital system preparation (Okutomi): Try to run the simple model on the computer near the PR3
    • Cleaning: discuss with Hirose-san, Nakano-kun to establish the procedure
    • Travel plan
      • Takahashi: Mon-Thu
      • Shoda: full week
      • Fujii: Wed - Fri.
      • Okutomi: full week
      • Fabian: Wed - Fri.
      • Mark: Mon-Tue
      • Ohishi: Mitaka on Wed. Thu.
      • Aso: Mitaka on Mon.

BS

  • BS Assembly Frame Design (Aso, Hirata)
    • We need to discuss the IM alignment mechanism for hanging frame part -> Change the scews to ball point ones: Takahashi-san already bought them.

    • Since the frame is very tall, we need a step or intermediate height floor safe work. Mark will give us prefered height

      -> Mark will send us the drawing with possible step heights.

  • BS magnet size (Michimura)
    • Recomendation from the special meeting: reduce the size of the magnet by a factor of 30.
    • Paired magnets for reducing the magnetic field noise
    • IM magnet size: needs to be checked -> Shimoda, Michimura

  • BS gluing jigs (Tatsumi)
    • We haven't placed order yet. But the company has started some manufacturing.
    • Can we wait 10 days for order until we have the thermal noise result ?
  • Not enough crane height problem (Hirata, Saito)
    • There seems to be some solution.
    • Asked Saito-san to give us the plan.
  • IP Base Clamp (Fabian)
    • Fabian will send a new version soon (by the end of the week)

  • BS clean bag (Aso)
    • Will design it soon as the size of the assembly frame is almost fixed

Other

  • Screw inventory (Ishizaki)
    • Ishizaki-san came to Kamioka to make an inventory of the screws we have.
    • Print out the inventory. Check when you use screws.
  • PR suspension model checking (Hirata, Akutsu)
    • EQ stop part is finished
    • Started working on the payload part
  • Watch dog system (Tanaka)
    • Got a new document from Tanaka-san
  • Clean suits (Aso)
    • Asked Miyoki-san to order many
  • ETM installation procedure (Takahashi)
    • Will have a discussion next week

  • Magnetism of the OSEM screw (Akutsu)
    • Sekiguchi-kun pointed out a possible problem with magnetism of the screws around OSEM. -> Check with Sekiguchi-kun

  • GAS blade inspection by Virgo (Takahashi)
    • Waiting for more information (mostly shipping info) from Ando-san
  • Safety at the site (Takahashi, Ishizaki)
    • Hirose-san will prepare a clean cloth to be put under the 2F floor to catch fallen items.

Next meeting

2015/11/13(Fri) 13:30