= VIS Meeting on 2015/11/5 = 2015/11/5 After the NAOJ GWPO Meeting (14:00 - 17:00) Kamioka NAOJ Room + SeeVogh Participants: Shoda, Takahashi, Fujii, Ohishi, Michimura, Raffaele, Okutomi, Mark, Tatsumi, Akutsu, Manuel, Hirata, Fabian, Ishizaki, Aso == Schedule == * Schedule Plan (Aso) * [[attachment:05_VIS-2015-11-5.pdf|Latest schedule chart]] * Control test: are the transfer function measurements necessary ? * Remote measurement is a possibility. * Change "control test" -> "signal checking" (not including TF measurement) * We need to come up with a way to make the working hour longer (two teams taking shifts ?) == PR == * Test Hanging Status (Shoda) * Galled screws (Takahashi) * Galled screw was cut. * Another screws almost galled, but we were able to remove them. * By using turn backles, we lifted the security interface plate horizontall and were able to put the screw without galling. * Production of new EQ stop screws (Takahashi) * Need to make new EQ stop rods because of the screw galling. * We had 6 sets. Now we lost 1set. We need 4 sets for iKAGRA. No need to hurry up in producing them. * Digital system (Shoda, Okutomi, Fujii) * A simple model with only one filter is available * Sattelite box and coil drivers are ready * Need to check the OSEM (Tue) * '''Where to put the satellite box ? Grounding ? -> Mark ''' * '''Digital system preparation (confirm that the model works) -> Okutomi ''' * Cleaning of the chamber (Okutomi) * Will consider to out source. '''Aso will talk with Saito-san. ''' * Cable status (Takahashi) * 1st set will be delivered in the next Monday. * 2nd set at the end of the next week * Remaining ones in the following weeks. * Call for shift for cable checking ? Need to establish the checking procedure first. '''Then call for shift (Takahashi) ''' * Additional PR mirror box (Tatsumi) * Order was placed. * Delivery before 1st Dec. * Production of additional PR winches (Akutsu) * Ordered all the parts. Delivery before 1st Dec. * '''Assembly work needs to be scheduled ''' * PR Optical Bench (Akutsu) * Ordered the required screws. Delivery in 10 days. * Height adjustment will be done at the time as the preparation work for PR3 installation. * RM compensation mass: do we have enough of them ? (Fabian) * Having some problem with screw model in CAD (density was wrong). Hirata-san is fixing it. * '''We should order compensation masses with various thickness (Takahashi) ''' * Lock nuts may have to be changed to cope with the changed length of the EQ stop screws. -> probably this is not so important. * RM EQ stop screw position (Akutsu, Shoda) * A stop screw will penetrate an opening in the RM. * '''Hirata-san will check if we can move the screw holes up or down to solve the problem. ''' * Next week (from 11/9) plan (Aso) * Mechanical Assembly (Takahashi, Shoda, Mark, Fabian, Fujii) * Mon: Put BF * Tue: OSEM signal check * Wed: Hang IM * Thu - Fri: Assemble IMRM * Digital system preparation (Okutomi): Try to run the simple model on the computer near the PR3 * Cleaning: discuss with Hirose-san, Nakano-kun to establish the procedure * Travel plan * Takahashi: Mon-Thu * Shoda: full week * Fujii: Wed - Fri. * Okutomi: full week * Fabian: Wed - Fri. * Mark: Mon-Tue * Ohishi: Mitaka on Wed. Thu. * Aso: Mitaka on Mon. == BS == * BS Assembly Frame Design (Aso, Hirata) * We need to discuss the IM alignment mechanism for hanging frame part -> Change the scews to ball point ones: Takahashi-san already bought them. * Since the frame is very tall, we need a step or intermediate height floor safe work. Mark will give us prefered height '''-> Mark will send us the drawing with possible step heights. ''' * BS magnet size (Michimura) * Recomendation from the special meeting: reduce the size of the magnet by a factor of 30. * Paired magnets for reducing the magnetic field noise * '''IM magnet size: needs to be checked -> Shimoda, Michimura ''' * BS gluing jigs (Tatsumi) * We haven't placed order yet. But the company has started some manufacturing. * Can we wait 10 days for order until we have the thermal noise result ? * Not enough crane height problem (Hirata, Saito) * There seems to be some solution. * Asked Saito-san to give us the plan. * IP Base Clamp (Fabian) * '''Fabian will send a new version soon (by the end of the week) ''' * BS clean bag (Aso) * '''Will design it soon as the size of the assembly frame is almost fixed ''' == Other == * Screw inventory (Ishizaki) * Ishizaki-san came to Kamioka to make an inventory of the screws we have. * Print out the inventory. Check when you use screws. * PR suspension model checking (Hirata, Akutsu) * EQ stop part is finished * Started working on the payload part * Watch dog system (Tanaka) * Got a new document from Tanaka-san * Clean suits (Aso) * Asked Miyoki-san to order many * ETM installation procedure (Takahashi) * '''Will have a discussion next week ''' * Magnetism of the OSEM screw (Akutsu) * Sekiguchi-kun pointed out a possible problem with magnetism of the screws around OSEM. -> '''Check with Sekiguchi-kun ''' * GAS blade inspection by Virgo (Takahashi) * Waiting for more information (mostly shipping info) from Ando-san * Safety at the site (Takahashi, Ishizaki) * Hirose-san will prepare a clean cloth to be put under the 2F floor to catch fallen items. == Next meeting == 2015/11/13(Fri) 13:30