VIS Meeting on 2015/11/27

2015/11/27 13:30 - 17:00

Kamioka NAOJ Room + SeeVogh

Participants:

Schedule

  • Schedule status (Aso)
    • Latest schedule chart

PR

  • Test Hanging Status (Takahashi)
    • A cable clamp to be attached to the suspension rod has a wrong size collet. Fabian will bring the proper collets from Mitaka. -> Status

  • Payload weight issue
    • BF load check at the ATC: arrangement status
  • Digital system (Okutomi, Fujii)
  • Traverser actuation check (Shoda)
    • Traverser cable has to be made (as a part of the cabling work) -> status

  • Clean work procedure (Aso)
    • Particle count record: Shoda collected data, but don't know how to extract data. Takahashi will help it. -> Status

  • PR2 preparation (Mark, Fabian)
  • PR CAD model and assembly drawings (Hirata)
  • Cable status (Takahashi)
    • Made a cable list -> Will upload it to Wiki with more information -> status

  • Call for shift for cable checking
    • Ask the student if he can come on the week of 12/7 (Takahashi) -> status

  • Additional PR mirror box (Tatsumi):
  • Production of additional PR winches (Akutsu)
  • RM compensation mass
    • Design status (Fabian): working on it now, but not yet finished. Will finish sometime this weekend. -> status

    • Order status (Takahashi): Haven't yet gotten a quotation. Will order early next week. -> status

  • RM EQ stop screw position (Hirata)
    • Out sourcing (Takahashi): Will ask for quotation with the RM compensation mass. All the plates are already sent to Mitaka. -> status

  • PR Optical Bench (Akutsu)
  • OSEM assembly status (Akutsu)
  • PR2 gluing schedule (Tatsumi)
  • Next week (from 11/24) plan
    • Test hanging
      • Mon:
      • Tue:
      • Wed:
      • Thu:
      • Fri:
      • Sat:
    • PR2 preparation work
      • Mon:
      • Tue:
      • Wed:
      • Thu:
      • Fri:
      • Sat:
  • Travel (Week of 11/30)
    • Takahashi:
    • Shoda:
    • Mark:
    • Fabian:
    • Okutomi:
    • Fujii:
    • Ishizaki:
    • Hirata:
    • Ohishi:
  • Travel (Week of 12/7)
    • Takahashi:
    • Shoda:
    • Mark:
    • Fabian:
    • Okutomi:
    • Fujii:
    • Ishizaki:
    • Hirata:
    • Ohishi:

BS

  • CLIO BS
  • BS Assembly Frame Design (Aso, Hirata)
  • BS flag design (Mark, Fabian)
  • BS gluing jigs (Tatsumi)
  • Not enough crane height problem (Hirata, Saito)
  • IP base clamp (Fabian)
  • Bread board spring (Takahashi)
  • BS clean bag (Aso)

ETM

  • ETM installation procedure (Aso)
    • Aso will compile the design information and send it to Mirapro by 11/25 -> status

Other

  • Watch dog system (Tanaka)
  • GAS blade inspection by Virgo (Takahashi)
    • Waiting for shipping information: Takahashi-san will send Ando-san a reminder -> status

  • Request to the ATC for the next year
    • We need to tell ATC our requests for the next fiscal year.
    • Takahashi-san will send a plan to Akutsu-kun -> status

  • Safety at the site (Takahashi, Ishizaki)

Next meeting