VIS Meeting on 2015/12/11

2015/12/11 13:30 -

Kamioka NAOJ Room + SeeVogh

Participants:

Schedule

  • Schedule status (Aso)
    • Latest schedule chart

PR

  • Test Hanging Status (Takahashi)
    • LVDT driver
    • Picomotor connection
    • Fishing rod motor
      • Will use a non-vacuum compatible D-SUB for the hanging test. -> Status

  • PR2 Status (Mark, Fabian)
  • Location of the EQ stop pillars (Takahashi)
  • Digital System (Okutomi, Fujii)
  • BF Optimal Weight (Takahashi)
    • Check the optimal load for the ETM BFs at the ATC: Need to be done before the end of Jan. Arrange with ATC people (Takahashi)
    • Balast mass design
  • Traverser actuation check (Shoda)
  • Traverser stop mechanism (Shoda)
    • Procurement status (Takahashi): Told Uraguchi-san about our decision. Will order the parts soon. -> Status

  • Clean work procedure
    • KAGRA should have a special meeting for clean requirements (Aso will propose to Saito-san)
  • PR CAD model and assembly drawings (Hirata)
    • Need to give the rotation angle of the traverser top plate (Aso)
  • Cable status (Takahashi)
    • Made a cable list -> Put a link to the excel file on Wiki. Takahashi will improve the table.

  • Call for shift for assembly help (Takahashi)
    • Made a call for shift for helping the installation works
  • PR2 gluing schedule (Tatsumi)
    • PR2 wire breakers have cracks
    • PR3 was transported to Kamioka
  • Wire cleaning
    • Damaged one wire
  • Production of additional PR winches (Akutsu)
    • Most of the parts were delivered.
    • ATC engineers is test assembling the winches (mostly complete)
  • RM compensation mass
    • Design status (Fabian): Do it later.
    • Order status (Takahashi): Placed an order. Will check the delivery date -> confirm (Takahashi)

    • Need to buy screws for fixing the compensation masses. Takahashi will check the lengths of screws
    • For the RM assembly in the test hanging, SUS screws were fine (no gulling). So we will use SUS screws.
  • RM EQ stop screw position (Takahashi)
    • Out sourcing: Need to send the plates to the company -> Sent 6 sets on Tue. One set remaining at the site.

  • PR Optical Bench (Akutsu)
    • For PR2, we do need to raise the optical bench.
      • Delivery date for the screws: Dec. 21
      • PR2 vacuum installation will be Jan. 19
  • OSEM assembly status (Akutsu)
  • RM production (Takahashi)
    • Confirmation of the surface finish
  • Test hanging vacuum installation
    • What needs to be done when the suspension is inside the chamber ?
      • Transfer function measurement
      • Spectrum
      • Do we need OpLev -> Yes

      • Check the orientation of the mirror
      • Check the height with laser marker
      • Peel off the first contact first -> Done

      • Practice of the suspension cleaning using the air gun
      • Inner frame modal analysis with the suspension (Takahashi)
  • List of what should be changed for PR3 hanging
    • some OSEM screws (to BUMAX)
  • Next week (from 12/7) plan
    • Test hanging
      • Mon:
      • Tue:
      • Wed:
      • Thu:
      • Fri:
    • PR2
      • Mon:
      • Tue:
      • Wed:
      • Thu:
      • Fri:
  • Travel (Week of 12/14)
    • Takahashi: Mon-Thu
    • Shoda: Mon-Fri
    • Mark: Tue-Thu(AM)
    • Fabian: Mon-Fri
    • Okutomi: Tue-Fri
    • Fujii:
    • Ishizaki: Tue-Fri
    • Hirata:
    • Ohishi:
  • Travel (Week of 12/21)
    • Takahashi:
    • Shoda:
    • Mark:
    • Fabian:
    • Okutomi:
    • Fujii:
    • Ishizaki:
    • Hirata:
    • Ohishi:

* Joris: 12/7 - 12/18

BS

  • What to do with BS after iKAGRA (Aso)
    • We need to decide on the plan by the end of Dec.
  • BS Assembly Frame Design (Aso, Hirata)
  • BS flag design (Mark, Fabian)
  • BS gluing jigs (Tatsumi)
  • Not enough crane height problem (Hirata, Saito)
  • IP base clamp (Fabian)
  • Bread board spring (Takahashi)
  • BS clean bag (Aso)

ETM

  • ETM assembly frame (Aso)
    • Waiting for quotation from Mirapro (sent a reminder)
    • Optical table was ordered: delivery date 1/19

Other

  • bKAGRA preparation
    • Roadmap discussion with Ando-san (Schedule Chart)
      • DGS request. They need 3 weeks of preparation time before suspension installation.
    • List of tasks for: BS, Type-A, Type-Bp modification, IMMT
  • Watch dog system (Tanaka)
  • GAS blade inspection by Virgo (Takahashi)
    • Waiting for shipping information:
  • Request to the ATC for the next year
    • Production of the blades of the Type-A BF: We should check the consistency of the optimal load at the TAMA prototype experiment and G&M measurements (SF and TF) (Takahashi) -> Status

  • Safety at the site (Takahashi, Ishizaki)

Next meeting

2015/12/18 (Fri) 13:30 -

Next F2F Meeting ?