Participants: | Participants: |
Line 10: | Line 10: |
* Latest schedule chart | * [[attachment:05_VIS-20151224.pdf|Latest schedule chart]] |
Line 55: | Line 55: |
* One cable found to be broken. Will send it back to the company -> status | * One cable found to be broken. Will send it back to the company -> status |
Line 73: | Line 73: |
* Need to buy screws for fixing the compensation masses. | * Need to buy screws for fixing the compensation masses. |
Line 84: | Line 84: |
* What to do with the dirty RMs ?: Check with ATC if re-polishing the rough surface is possible or not (Takahashi) -> status ? | * What to do with the dirty RMs ?: Check with ATC if re-polishing the rough surface is possible or not (Takahashi) -> status ? |
Line 100: | Line 100: |
* Mon: * Tue: |
* Mon: * Tue: |
Line 103: | Line 103: |
* Thu: | * Thu: |
Line 107: | Line 107: |
* Mon: * Tue: |
* Mon: * Tue: |
Line 110: | Line 110: |
* Thu: | * Thu: |
Line 119: | Line 119: |
* Fujii: | * Fujii: |
Line 125: | Line 125: |
* Takahashi: * Shoda: * Mark: * Fabian: * Okutomi: |
* Takahashi: * Shoda: * Mark: * Fabian: * Okutomi: |
Line 169: | Line 169: |
* If we can get help from ATC to measure the optimal load in Mitaka, it will be good. * Takahashi will make a plan for the optimal load check and ask ATC.-> Status ? |
* If we can get help from ATC to measure the optimal load in Mitaka, it will be good. * Takahashi will make a plan for the optimal load check and ask ATC.-> Status ? |
VIS Meeting on 2015/12/25
2015/12/25 13:30 -
Kamioka TV conference room + SeeVogh
Participants:
Schedule
- Schedule status (Aso)
PR
- Test Hanging Status (Takahashi)
- Transfer function measurements (Shoda)
OpLev (Shoda)
- Mirror orientation confirmation (Shoda)
- PR2 Status (Mark, Fabian)
- Flag preparation status (Fabian)
- Spare flag order status (Takahashi)
- We need to secure things for water using Sunoko (duckboard).
- Location of the EQ stop pillars (Takahashi)
- Locations were reported by Takahashi
Interference with OpLev (Akutsu)
- Locations were reported by Takahashi
- Digital System (Okutomi, Fujii)
- BF Optimal Weight (Takahashi)
Check the optimal load for the ETM BFs at the ATC: Need to be done before the end of Jan. Arrange with ATC people (Takahashi) -> Status
Balast mass design: Fabian will talk with Hirata on Monday. -> Status
- Traverser actuation check (Shoda)
Need to check the condition of the traverser. -> Status (Shoda)
- Traverser stop mechanism
Procurement status (Takahashi): Parts were delivered. Clean the parts on Monday (Hirata). -> Status
- Clean work procedure
- Order clean wipes (Aso)
KAGRA should have a special meeting for clean requirements: Will propose another meeting. (Aso)
- PR CAD model and assembly drawings (Hirata)
Need to give the rotation angle of the traverser top plate (Aso)
- Cable status (Takahashi)
- All the cables except for two cables were delivered.
Need to send more PTFE cable to finish the remaining two -> status
- Need to send the cables used for the test hanging once it is finshed.
Made a cable list -> Put a link to the excel file on Wiki. Takahashi will improve the table.
- All the cables except for two cables were delivered.
- Cable check
- 70% done.
One cable found to be broken. Will send it back to the company -> status
- Call for shift for assembly help (Takahashi)
Made a call for shift for helping the installation works -> status
- PR2 wire breaker problem (Mark, Tatsumi)
- Removal of the wire breakers (Mark)
- SUS wire breaker order status (Takahashi)
- Wire cleaning (Hirata)
Hirata will order 20m more wires. -> Delivered. Will wipe in the next week. -> Status
Will wash Tungsten wire delivery status -> Delivered. Will wipe in the next week -> Status
- Production of additional PR winches (Akutsu)
- 650um Tungsten wire test with 9.2kg is fine
Will test with 200um wires on Monday (7.2kg) with improved mass clamps (Hirata). -> Status
- RM compensation mass
- Need to buy screws for fixing the compensation masses.
M6-16mm and M6-20mm are necessary. -> are these available ?
- Need to buy screws for fixing the compensation masses.
- PR Optical Bench (Akutsu)
- For PR2, we do need to raise the optical bench.
- Delivery date for the screws: Dec. 21
- PR2 vacuum installation will be Jan. 19
- For PR2, we do need to raise the optical bench.
- OSEM assembly status (Akutsu)
- RM production (Takahashi)
What to do with the dirty RMs ?: Check with ATC if re-polishing the rough surface is possible or not (Takahashi) -> status ?
- List of what should be changed for PR3 hanging
- People should share ideas whenever they come up with missing thigns.
- Shoda made a spread sheet for keep tracking the ideas
Missing items(to be purchased soon)
Picomotor drivers (Takahashi)
Signal generators for LVDTs (Aso) -> Asking for quotation
Serial-Ethernet converter: 7 more (Shoda) -> Asked Ishizaki-san to buy them
Traverser motor driver (Shoda)
Turn backles (bigger and eye). Smaller shackles. (Aso) -> TBD
- Next week (from 1/4) plan
- Test hanging
- Mon:
- Tue:
- Wed:
- Thu:
- Fri: F2F@Mitaka
- PR2
- Mon:
- Tue:
- Wed:
- Thu:
- Fri: F2F@Mitaka
- Test hanging
- Travel (Week of 1/4)
- Takahashi: Mon-Thu
- Shoda: Mon-Thu
- Mark: Mon-Thu
- Fabian: Tue-Thu
- Okutomi: Mon-Tue (available)
- Fujii:
- Ishizaki:
- Hirata:
- Ohishi:
- Travel (Week of 1/11)
- Takahashi:
- Shoda:
- Mark:
- Fabian:
- Okutomi:
- Fujii: -
- Ishizaki:
- Hirata:
- Ohishi:
* Joris: 1/11-1/29
* 1/18 Sekiguchi-kun's PhD defense
BS
- BS Assembly Frame Design (Aso, Hirata)
- BS flag design (Mark, Fabian)
- BS gluing jigs (Tatsumi)
- Not enough crane height problem (Hirata, Saito)
- IP base clamp (Fabian)
- Bread board spring (Takahashi)
- BS clean bag (Aso)
ETM
- ETM assembly frame (Aso)
- Ordering in progress
Other
- bKAGRA preparation
List of tasks for: BS, Type-A, Type-Bp modification, IMMT (Takahashi) by the end of the next week. Set up a Wiki page (Aso)
- Watch dog system (Tanaka)
- Will present at an AEL meeting.
- GAS blade inspection by Virgo (Takahashi)
To be shipped soon: Check the deadline for Virgo (Takahashi) -> Status
- Type-A Filters Optimal Load Measurements
- If we can get help from ATC to measure the optimal load in Mitaka, it will be good.
Takahashi will make a plan for the optimal load check and ask ATC.-> Status ?
- How to manufacture the long maraging wires ?
- One prototype was machined by Ojima
Aoshima can do the heat treatment for the long rod. Will ask them soon (Takahashi) -> Status
- How to test it ?
- Use the unused assembly frame for Type-B ?
- Safety at the site (Takahashi, Ishizaki)
Next meeting
2015/1/8 (Fri) 13:30 - F2F@Mitaka