Differences between revisions 1 and 5 (spanning 4 versions)
Revision 1 as of 2016-02-18 14:37:01
Size: 9343
Editor: YoichiAso
Comment:
Revision 5 as of 2016-02-19 16:19:28
Size: 7387
Editor: YoichiAso
Comment:
Deletions are marked like this. Additions are marked like this.
Line 6: Line 6:
Participants: Participants:Takahashi, Hirata, Raffaele, Tanaka, Mark, Fabian, Shoda, Okutomi, Fujii, Aso, Ishizaki, Akutsu
Line 13: Line 13:
  * Wire breaker groove problem
   * Wrong surface was glued on the mirror side. So no groove is present where the wires touch.
   * Put alminum foil between the prism and the wires
  * Current status (http://klog.icrr.u-tokyo.ac.jp/osl/?r=756)
   * IM and the bottom filter is connected.
   * Adjusting the weight of the IM
  * #Traverser repair: Repair of the broken ones at Mitaka -> Uraguchi-san is working on it.
  * #Screws to fix the front and back rings the RM were too long, or the tapping in the holes were too short. Couldn't use M5x40. Ordered M5x35 with vent holes. -> Delivered. '''Remember to replace them'''
  * When releasing the IM, one of the flags on the TM was broken (came off).
  * We decided to fix the mirror with respect to the RM. Now the suspension acts as a double-pendulum, damped by the IM.
  * Yaw can be adjusted by the traverser, Pitch can be adjusted by the IM.
  * Transfer functions from IM to IM were measured.
   * Some strange results
   * The vertical resonant frequency is higher than expected
   * Length transfer function has many unknown peaks
Line 22: Line 21:
  * Reinformcement design by Mirapro
   * [[https://www.dropbox.com/s/l8er09c3d7lmsgr/VP5904-A_Bag%20Frame%20Assy.pdf?dl=0|2D Drawing]]
   * [[https://www.dropbox.com/s/j8rcpvytin0qft6/Bag%20Frame.stp?dl=0|STEP]]
   * [[https://www.dropbox.com/s/llu99rjj0gnesz2/Bag%20Assy.png?dl=0|Assembly image]]
   * [[https://www.dropbox.com/s/zsrizfnzx9xuovp/Bag%20Assy.stp?dl=0|Assembly STEP]]
  * Tell Mirapro to go ahead (Aso)
Line 29: Line 22:
 * Crane will be not available on 2/25 for the crane upgrade to remote control. We need to coordinate with Uchiyama-san if we want to do the vacuum installation on 25th.  * Pre-installation cleaning of the suspension
  * Vacuum cleaner
  * Wiper-> Ask Hirose-san to send to Kamioka (Aso)
  * Ethanol-> Bring the bottle to the tunnel.
 * Crane will not be available on 2/25 in the morning for the crane upgrade to remote control.
Line 32: Line 29:
 * Mon: IM hanging
 * Tue: IMRM hanging
 * Wed: IM alignment
 * Thu: OSEM setup
 * Fri:
 * Mon: F2F
 * Tue: Re-cabling, LVDT check, fishing rod check, traverser check.
 * Wed: Vacuum installation preparation
 * Thu: Vacuum installation
 * Fri: Post-vacuum installation work
Line 39: Line 36:
 * Assembly of the suspension (Ohishi)
 * Missing parts (Tatsumi, Takahashi)
  * Insulation tubes for picomotor connectors
   * Tubes were delivered on Wed.
   * Cable ties are not yet delivered -> check the delivery date (Takahashi)
 * Suspension Test (Ohishi)
 * Coil winding (Takahashi)
  * Made 13 coils in total.
  * Need to send 3 bobins to the coil winding company
 * TAMA PRM transportation (Tatsumi) -> done today.
 * Current status (Ohishi)
Line 50: Line 38:
=== Plan for the next week ===
Line 52: Line 39:
 * Travel (Week of 2/15)
  * Takahashi:Mon-Thu
  * Shoda:Mon-Thu
 * Travel (Week of 2/22)
  * Takahashi:Wed - Thu (Fri: Akeno for the acceptance of IP from NIKHEF)
  * Shoda:Tue - Fri
Line 57: Line 44:
  * Okutomi:Mon-Thu
  * Fujii:Mon-Thu
  * Okutomi:Tue - Fri
  * Fujii:Tue - Fri
Line 62: Line 49:
  * Sekiguchi: Mon-Thu

VIS F2F 2/19
Line 68: Line 52:
 * Travel (Week of 2/22)
  * Takahashi:Wed - Thu (Fri: Akeno for the acceptance of IP from NIKHEF)
  * Shoda:Wed - Fri
 * Travel (Week of 2/29)
  * Takahashi:
  * Shoda:?
Line 73: Line 57:
  * Okutomi:Wed - Fri
  * Fujii:Wed - Fri
  * Okutomi: ?
  * Fujii:?
Line 80: Line 64:
 * Rotation angle of the PR3 mirror
  * 0.786deg counter clockwise from the line connecting the centers of the PR3 and BS chambers.
  * 0.619deg counter clockwise with respect to the chamber ([[https://www.dropbox.com/s/073wcbz652i016a/VM5920_KAGRA真空容器PR3_Type-Bp.pdf?dl=0|schematic]])
   * Currently the mirror is rotated by 0.65deg (measured at the time of the test hanging).
   * This is well within the actuation range of the traverser. -> Will not make any further adjustment.
 * #Wire winches
  * Now in the ATC clean room.
  * Asked Ikenue-san to repair it (Takahashi)

 * #Clean work procedure
  * Will be discussed at F2F.

 * #BF Optimal Weight (Takahashi)
  * #Balast masses: Delivered to Mitaka. Will send them to Kamioka (Hirata)
 * #IM wire clamps
  * #Need to send the wire clamps used for the test hanging to I-ject: it was sent to I-ject (Takahashi)
 * #Traverser actuation check (Shoda)

 * #Wire cleaning (Hirata)
  * Hirata will order 20m more wires. -> Delivered. Will wipe in the next week. -> Finished. Will send to Kamioka soon.
  * Will wash Tungsten wire delivery status -> Delivered. Will wipe in the next week -> Finished. Will send to Kamioka soon.
Line 120: Line 82:
 * Electronics diagram and review  * Watch dog system (Tanaka)
  * Ordered parts to Hokushin

  * About to order PCB to P-ban

 * #Electronics diagram and review
Line 123: Line 90:
 * Need to make Guradian script for PR3. Shoda + Fujii and Okutomi will write one after the mechanical installation is finished.
 * Watch dog system (Tanaka)

 * #LVDT distributor connector problem
  * Miyakawa-san circulated a design of the conversion cable (D9-D15): [[attachment:ESB-K003-G004-01A.pdf|drawing]]
 * #Need to make Guradian script for PR3. Shoda + Fujii and Okutomi will write one after the mechanical installation is finished.
Line 130: Line 93:

 * #Cable status (Takahashi)
  * Need to send more PTFE cable to finish the remaining two -> '''Will do it in the next week '''
  * Need to send the cables used for the test hanging once it is finished. -> '''Will send them once the test hanging is disassembled. '''

 * #Cable check
  * Liu-kun Zhao-kun finished checking all the cables. They found another broken cable.

  * Will send the broken cables together with the other cable related items (Takahashi).
Line 144: Line 98:
  * Type-Bp modification: Continue discussion (Aso, Raffaele)   * Type-Bp modification: Leader = Shoda (Aso, Raffaele)
Line 157: Line 111:
   * Asked a quotation to Shinko-sha, gave the new drawing. Will ask about anealing (Takahashi)
   *
Line 163: Line 119:
    * 片振り放電加工機 may be better
    * Will test machine the dirty recoil mass. Will have another meeting with Fukushima-san (Takahashi)
Line 166: Line 124:
  * Shorter flag is desirable ?
  * Mark will sort out the ideas and organize a specialized meeting.-> will present an updated version in the next meeting.
 * IP base clamp (Fabian): [[attachment:image.png|Picture]] -> Reduce the number of clamps-> Hirata-san finished 2D drawings. Trying to get quotation now.
 * Bread board spring (Takahashi): Hirata-san is getting quotations.
  * [[attachment:kagraseis01414flagredesign.zip|Mark's drawings]]
  * Make shorter by small changes
  * Widen the OSEM opening (Akutsu)
 * BS dummy optics design (Fabian)
  * http://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=4811
  * Finalizing the design by the end of next week
 * IP base clamp (Fabian): Reduce the number of clamps-> Hirata-san finished 2D drawings. Trying to get quotation now.-> Still waiting for the quotation.
 * Bread board spring (Takahashi): Hirata-san is getting quotations.Asked quotation with the above one all at once.
Line 177: Line 139:
 * Need to decide members
Line 187: Line 150:
 * PRM traverser
  * Postpone the production to the next FY until we know the details of the modification.
  * Tell Uraguchi-san about the above plan (Takahashi) -> done
 * #PR2 Wire breaker problem
 * PR2 Wire breaker problem
Line 192: Line 152:
   * Not yet ready    * We need to send the spare mirror and the containers back to Kashiwa soon.
   * Bring out the spare mirror and two containers out from the tunnel on 24th.
   * Need to ask someone in the surface building to 積み込みのヘルプ
   * Bring back CLIO suspension too (Takahashi)
Line 196: Line 159:
  * No incident   * No incident for VIS
  * Some injuries in other groups
Line 202: Line 166:
2015/2/19 (Fri) 13:30 - @ Mitaka 2015/2/26 (Fri) ?

Next F2F 2016/4/1

VIS Meeting on 2016/2/19

2015/2/19 13:30 -

Room 210

Participants:Takahashi, Hirata, Raffaele, Tanaka, Mark, Fabian, Shoda, Okutomi, Fujii, Aso, Ishizaki, Akutsu

Schedule

  • Schedule status (Aso) (Chart)

PR3

  • PR3 Installation Status (Takahashi)
    • When releasing the IM, one of the flags on the TM was broken (came off).
    • We decided to fix the mirror with respect to the RM. Now the suspension acts as a double-pendulum, damped by the IM.
    • Yaw can be adjusted by the traverser, Pitch can be adjusted by the IM.
    • Transfer functions from IM to IM were measured.
      • Some strange results
      • The vertical resonant frequency is higher than expected
      • Length transfer function has many unknown peaks
  • The frame for the clean bag is bent.
    • Mirapro will come on 22nd to make changes.
  • Pre-installation cleaning of the suspension
    • Vacuum cleaner
    • Wiper-> Ask Hirose-san to send to Kamioka (Aso)

    • Ethanol-> Bring the bottle to the tunnel.

  • Crane will not be available on 2/25 in the morning for the crane upgrade to remote control.

Plan for the next week

  • Mon: F2F
  • Tue: Re-cabling, LVDT check, fishing rod check, traverser check.
  • Wed: Vacuum installation preparation
  • Thu: Vacuum installation
  • Fri: Post-vacuum installation work

iKAGRA ETM suspension

  • Current status (Ohishi)

Travel Plans

  • Travel (Week of 2/22)
    • Takahashi:Wed - Thu (Fri: Akeno for the acceptance of IP from NIKHEF)

    • Shoda:Tue - Fri

    • Mark:
    • Fabian:
    • Okutomi:Tue - Fri

    • Fujii:Tue - Fri

    • Ishizaki:
    • Hirata:
    • Ohishi:

KAGRA F2F 2/21 - 23

  • Travel (Week of 2/29)
    • Takahashi:
    • Shoda:?
    • Mark:
    • Fabian:
    • Okutomi: ?
    • Fujii:?
    • Ishizaki:
    • Hirata:
    • Ohishi:

Other Mechanical Issues

  • #Production of additional PR winches (Akutsu)
    • Shipping status (Takahashi, Hirata) -> Wrapped. Will be shipped with IP in the next week.

  • #OSEM assembly status (Akutsu)
  • #List of what should be changed for PR3 hanging
  • #Missing items(to be purchased soon)
    • #Traverser motor driver (Shoda) -> Will discuss Uraguchi-san. Need a box for stepping motor driver. -> These are for PR2. Will be ordered sometime.

Electronics

  • What are necessary in the next few weeks ?
    • Nothing
  • Watch dog system (Tanaka)
    • Ordered parts to Hokushin
    • About to order PCB to P-ban
  • #Electronics diagram and review
  • #Need to make Guradian script for PR3. Shoda + Fujii and Okutomi will write one after the mechanical installation is finished.
  • #Digital System (Okutomi, Fujii)

bKAGRA preparation

  • Three big categories of the tasks
    • Type-A: Leader = Takahashi: Task list, team members
    • Type-B (BS and SRC): Leader = Mark: Task list, team members
    • Type-Bp modification: Leader = Shoda (Aso, Raffaele)

Common Issues

Type-B

  • Task listKAGRA/Subgroups/VIS/TypeB/TaskList

    • Kick off meeting within February (Mark)
  • BS prism preparation (Mark)
    • 5mm prism drawing

    • Confirmed with Hirata-san that BS can use same 5 mm prism as SR (grooves, wire clearance all OK).
    • Confirmed with Tatsumi-san that not a big deal to use smaller BS prism as long as secondary position not changed.
    • Submitted 5 mm prism drawing to company that did LIGO HSTS prism (except grooves), waiting on response.
    • Second company that did LIGO groove cutting not interested in quoting - exploring other US companies.
    • Should contact Shinko-sha again (Takahashi)
      • Asked a quotation to Shinko-sha, gave the new drawing. Will ask about anealing (Takahashi)
  • Can we make SR wire breakers bigger ?
    • Check what happens if we widen the slit by 3.75mm and make a new M5 (Hirata) -> Result

      • Two concerns
        • The rework may bend the wing shaped parts.
        • The P.C.D. of the new screw holes may not coincide exactly with the other existing holes
      • Consult with Fukushima-san again. Takahashi will contact Fukushima-san
        • 片振り放電加工機 may be better
        • Will test machine the dirty recoil mass. Will have another meeting with Fukushima-san (Takahashi)
      • Do we need to widen the slits for PRC RMs ? -> Depends on how difficult it is to rework the RM.

      • Wider cuts will break the horizontal balance. Need to check how much compensation mass is reduced (Hirata) -> 2mm reduction will be necessary. We can do this.

  • Flag design (Mark)
    • Mark's drawings

    • Make shorter by small changes
    • Widen the OSEM opening (Akutsu)
  • BS dummy optics design (Fabian)
  • IP base clamp (Fabian): Reduce the number of clamps-> Hirata-san finished 2D drawings. Trying to get quotation now.-> Still waiting for the quotation.

  • Bread board spring (Takahashi): Hirata-san is getting quotations.Asked quotation with the above one all at once.
  • #BS Assembly Frame Design (Aso, Hirata)
  • #BS gluing jigs (Tatsumi)
  • #Not enough crane height problem (Hirata, Saito)
  • #BS clean bag (Aso)

Type A

  • Task list (Takahashi)

  • Need to decide members
  • #Type-A Filters Optimal Load Measurements
    • #Takahashi will make a plan for the optimal load check and ask ATC.-> Check two filters per month from April 2016. -> Will be presented to the ATC steering committee.

    • #How to manufacture the long maraging wires ?
      • One prototype was machined by Ojima
      • Aoshima can do the heat treatment for the long rod. Will ask them soon (Takahashi) -> Still waiting for a quotation.

      • How to test it ?
        • We can use the prototype assembly frame in TAMA.

Type-Bp modification

  • PR2 Wire breaker problem
    • Prism removal from PR2 (Hirose, Mark)
      • We need to send the spare mirror and the containers back to Kashiwa soon.
      • Bring out the spare mirror and two containers out from the tunnel on 24th.
      • Need to ask someone in the surface building to 積み込みのヘルプ
      • Bring back CLIO suspension too (Takahashi)

Other

  • Safety
    • No incident for VIS
    • Some injuries in other groups
  • #GAS blade inspection by Virgo (Takahashi)
    • Shipped the blades. Will get results in 1-2 months.

Next meeting

2015/2/26 (Fri) ?

Next F2F 2016/4/1

KAGRA/Subgroups/VIS/VISMinutes20160219 (last edited 2016-02-19 18:20:34 by YoichiAso)