= VIS Meeting on 2016/2/19 = 2015/2/19 13:30 - Room 210 Participants:Takahashi, Hirata, Raffaele, Tanaka, Mark, Fabian, Shoda, Okutomi, Fujii, Aso, Ishizaki, Akutsu == Schedule == * Schedule status (Aso) ([[https://www.dropbox.com/s/y586flgsr0usmvx/05_VIS-20160212.pdf?dl=0|Chart]]) == PR3 == * PR3 Installation Status (Takahashi) * When releasing the IM, one of the flags on the TM was broken (came off). * We decided to fix the mirror with respect to the RM. Now the suspension acts as a double-pendulum, damped by the IM. * Yaw can be adjusted by the traverser, Pitch can be adjusted by the IM. * Transfer functions from IM to IM were measured. * Some strange results * The vertical resonant frequency is higher than expected * Length transfer function has many unknown peaks * The frame for the clean bag is bent. * Mirapro will come on 22nd to make changes. * Pre-installation cleaning of the suspension * Vacuum cleaner * Wiper-> Ask Hirose-san to send to Kamioka (Aso) * Ethanol-> Bring the bottle to the tunnel. * Crane will not be available on 2/25 in the morning for the crane upgrade to remote control. === Plan for the next week === * Mon: F2F * Tue: Re-cabling, LVDT check, fishing rod check, traverser check. * Wed: Vacuum installation preparation * Thu: Vacuum installation * Fri: Post-vacuum installation work == iKAGRA ETM suspension == * Current status (Ohishi) == Travel Plans == * Travel (Week of 2/22) * Takahashi:Wed - Thu (Fri: Akeno for the acceptance of IP from NIKHEF) * Shoda:Tue - Fri * Mark: * Fabian: * Okutomi:Tue - Fri * Fujii:Tue - Fri * Ishizaki: * Hirata: * Ohishi: KAGRA F2F 2/21 - 23 * Travel (Week of 2/29) * Takahashi: * Shoda:? * Mark: * Fabian: * Okutomi: ? * Fujii:? * Ishizaki: * Hirata: * Ohishi: == Other Mechanical Issues == * #Production of additional PR winches (Akutsu) * Shipping status (Takahashi, Hirata) -> Wrapped. Will be shipped with IP in the next week. * #OSEM assembly status (Akutsu) * #List of what should be changed for PR3 hanging * People should share ideas whenever they come up with missing thigns. * Shoda made a spread sheet for keep tracking the ideas * https://docs.google.com/spreadsheets/d/1zZaLObWjDSEOTrr85Hz0ApXxEUChK3xJ_chk0f7r5nY/edit?usp=sharing * All the items are now done or being taken care of * #Missing items(to be purchased soon) * #Traverser motor driver (Shoda)''' ''' -> Will discuss Uraguchi-san. Need a box for stepping motor driver. -> These are for PR2. Will be ordered sometime. == Electronics == * What are necessary in the next few weeks ? * Nothing * Watch dog system (Tanaka) * Ordered parts to Hokushin * About to order PCB to P-ban * #Electronics diagram and review * Mark: detailed schematics nearly ready to post - [[http://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=3615|D1503615 (full PR3)]], [[http://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=4795|D1604795 (iKAGRA PR3)]] * Mark: started overview schematic [[attachment:Cabling Overview.graffle.pdf|diagram]], * #Need to make Guradian script for PR3. Shoda + Fujii and Okutomi will write one after the mechanical installation is finished. * #Digital System (Okutomi, Fujii) == bKAGRA preparation == * Three big categories of the tasks * Type-A: Leader = Takahashi: Task list, team members * Type-B (BS and SRC): Leader = Mark: Task list, team members * Type-Bp modification: Leader = Shoda (Aso, Raffaele) == Common Issues == == Type-B == * Task list[[KAGRA/Subgroups/VIS/TypeB/TaskList]] * Kick off meeting within February (Mark) * BS prism preparation (Mark) * 5mm prism [[attachment:JGW-D1604796.pdf|drawing]] * Confirmed with Hirata-san that BS can use same 5 mm prism as SR (grooves, wire clearance all OK). * Confirmed with Tatsumi-san that not a big deal to use smaller BS prism as long as secondary position not changed. * Submitted 5 mm prism drawing to company that did LIGO HSTS prism (except grooves), waiting on response. * Second company that did LIGO groove cutting not interested in quoting - exploring other US companies. * Should contact Shinko-sha again (Takahashi) * Asked a quotation to Shinko-sha, gave the new drawing. Will ask about anealing (Takahashi) * * Can we make SR wire breakers bigger ? * Check what happens if we widen the slit by 3.75mm and make a new M5 (Hirata) -> [[https://www.dropbox.com/sh/f5lnexvb6k9bovo/AABEYf4_C19GXYEuJZZiy7cqa?dl=0|Result]] * Two concerns * The rework may bend the wing shaped parts. * The P.C.D. of the new screw holes may not coincide exactly with the other existing holes * Consult with Fukushima-san again. Takahashi will contact Fukushima-san * 型振り放電加工機 may be better * Will test machine the dirty recoil mass. Will have another meeting with Fukushima-san (Takahashi) * Do we need to widen the slits for PRC RMs ? -> Depends on how difficult it is to rework the RM. * Wider cuts will break the horizontal balance. Need to check how much compensation mass is reduced (Hirata) -> 2mm reduction will be necessary. We can do this. * Flag design (Mark) * [[attachment:kagraseis01414flagredesign.zip|Mark's drawings]] * Make shorter by small changes * Widen the OSEM opening (Akutsu) * BS dummy optics design (Fabian) * http://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=4811 * Finalizing the design by the end of next week * IP base clamp (Fabian): Reduce the number of clamps-> Hirata-san finished 2D drawings. Trying to get quotation now.-> Still waiting for the quotation. * Bread board spring (Takahashi): Hirata-san is getting quotations.Asked quotation with the above one all at once. * #BS Assembly Frame Design (Aso, Hirata) * #BS gluing jigs (Tatsumi) * #Not enough crane height problem (Hirata, Saito) * #BS clean bag (Aso) == Type A == * [[http://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=4792|Task list]] (Takahashi) * Need to decide members * #Type-A Filters Optimal Load Measurements * #Takahashi will make a plan for the optimal load check and ask ATC.-> Check two filters per month from April 2016. -> Will be presented to the ATC steering committee. * #How to manufacture the long maraging wires ? * One prototype was machined by Ojima * Aoshima can do the heat treatment for the long rod. Will ask them soon (Takahashi) -> Still waiting for a quotation. * How to test it ? * We can use the prototype assembly frame in TAMA. == Type-Bp modification == * PR2 Wire breaker problem * Prism removal from PR2 (Hirose, Mark) * We need to send the spare mirror and the containers back to Kashiwa soon. * Bring out the spare mirror and two containers out from the tunnel on 24th. * Need to ask someone for loading help * Bring back CLIO suspension too (Takahashi) == Other == * Safety * No incident for VIS * Some injuries in other groups * #GAS blade inspection by Virgo (Takahashi) * Shipped the blades. Will get results in 1-2 months. == Next meeting == 2015/2/26 (Fri) 13:30 - Next F2F 2016/4/1