Size: 8135
Comment:
|
Size: 7841
Comment:
|
Deletions are marked like this. | Additions are marked like this. |
Line 26: | Line 26: |
---- /!\ '''Edit conflict - other version:''' ---- ---- /!\ '''Edit conflict - your version:''' ---- |
|
Line 39: | Line 29: |
---- /!\ '''End of edit conflict''' ---- |
|
Line 91: | Line 76: |
---- /!\ '''Edit conflict - other version:''' ---- ---- /!\ '''Edit conflict - your version:''' ---- * Need to think about the organization more * Operation manual for digital system is necessary ---- /!\ '''End of edit conflict''' ---- |
* Need to think about the organization more * Operation manual for digital system is necessary |
Line 122: | Line 93: |
---- /!\ '''Edit conflict - other version:''' ---- |
|
Line 131: | Line 98: |
Line 135: | Line 100: |
* With the V-cut company being different from what LIGO used, the advantage of using US companies is not clear now. * One possibility for risk reduction: buy 2 from US, 4 from JP and use 2 from JP for test hanging to see if they work fine or not. If they work fine, we can continue to use them for SR. If they fail, we have another set to try from US. ---- /!\ '''Edit conflict - your version:''' ---- || ||Prisms ||Grooves ||Total || ||4 ||$3,600 ||$2,600 ||$6,200 || ||12 ||$9,000 ||$5,800 ||$14,800 || |
* We will order 6 to Shinko-sha * Takahashi will call the compnay to have a meeting * Aso will check with Ohashi-san about the budget * We will use the saphhire prisms for the test hanging too |
Line 155: | Line 111: |
---- /!\ '''End of edit conflict''' ---- |
|
Line 166: | Line 118: |
* Will test machine the dirty recoil mass. '''Will have another meeting with Fukushima-san''' (Takahashi) | * Will test machine the dirty recoil mass. * Brought back one RM to Mitaka * It will take more than 1 month (Fukushima-san) * Iwashita-san is preparing some tools for the machine. May take more than they initially expected. |
Line 172: | Line 127: |
* Will make a smaller foot print flag design (Mark) | |
Line 173: | Line 129: |
* Mark would like to make a test flag with magnetic attachment. * Use a key to determine the rotation angle of the flag |
|
Line 177: | Line 135: |
* '''Hirata-san will get quotes from companies (consult with Takahashi-san which company to ask)''' * IP base clamp (Fabian): Reduce the number of clamps-> Hirata-san finished 2D drawings. Trying to get quotation now.-> Still waiting for the quotation.-> Will get a quotation on the next Monday. * Bread board spring (Takahashi): Hirata-san is getting quotations.Asked quotation with the above one all at once. |
* Hirata-san is waiting for quotes from three companies * IP base clamp (Fabian): Ordered * Bread board spring (Takahashi): Got a quotation, but expensive. Looking for other companies. |
Line 183: | Line 141: |
* Asking Mirapro to make a modification | |
Line 184: | Line 143: |
* Will make a design change. | |
Line 188: | Line 148: |
* '''Check details with Hirata-san to make sure the interfaces with the hanging frame and the suspension (Mark)''' * '''Present the design at the next VIS meeting (Mark)''' |
* With check the structural strength * Will talk with Mirapro (contact Nakamura-san : Hirata) * Take photos of the BS area to see where is the optimal location of the assembly frame (Aso) * Making assembly drawings for BS (Hirata) |
Line 197: | Line 159: |
* Thinking about a possibility of testing the long filter chain using the prototype EQ stop in Kashiwa. * Organize a kick-off meeting in the later half of March, concentrating on the room temperature part. (Takahashi) * Prototype long maraging rods (heat treated) were delivered from Aoyama |
|
Line 201: | Line 167: |
* Aoshima can do the heat treatment for the long rod. Will ask them soon (Takahashi) -> Still waiting for a quotation. | * Aoyama can do the heat treatment for the long rod. Will ask them soon (Takahashi) -> Still waiting for a quotation. |
Line 208: | Line 174: |
* We need to send the spare mirror and the containers back to Kashiwa soon. * Bring back to Mitaka on 2/26. * Bring back CLIO suspension too (Takahashi) -> Not this time |
* Spare mirror is now back to Kashiwa * CLIO suspension * Ishizaki-san will come to pick it up |
Line 214: | Line 181: |
* |
VIS Meeting on 2016/3/4
2016/3/4 13:30 -
Kamioka NAOJ Room & SeeVogh
Participants:Takahashi, Ishizaki, Hirata, Mark, Fabian,Aso, Tanaka, Akutsu
Schedule
Schedule status (Aso) (Chart)
PR3
- PR3 Installation Status
- Mechanical Installation is done
- Damping control status (Okutomi)
- Actuator control (Shoda)
Plan for the next week
Mon:Okutomi will stay
Tue:Okutomi will stay
- Wed:
- Thu:
- Fri:
iKAGRA ETM suspension
- Current status (Ohishi)
- Picomotor check is to be done
- ETMX First contact remaining
- ETMY big scratches
Travel Plans
- Travel (Week of 3/7)
Takahashi:Mon-Tue
- Shoda:
- Mark:
- Fabian:
Okutomi:Mon-Tue
- Fujii:
- Ishizaki:
Hirata:10-11 not available
- Ohishi:
- Travel (Week of 3/14)
- Takahashi:
- Shoda:
- Mark:
- Fabian:
- Okutomi:
- Fujii:
- Ishizaki:
- Hirata:
- Ohishi:
Other Mechanical Issues
- #OSEM assembly status (Akutsu)
- #Missing items(to be purchased soon)
#Traverser motor driver (Shoda) -> Will discuss Uraguchi-san. Need a box for stepping motor driver. -> These are for PR2. Will be ordered sometime.
Electronics
- What are necessary in the next few weeks ?
- Nothing
- Watch dog system (Tanaka)
- PCB delivered
- Operation check of the prototype board is done
- Will stuff the PCM for the mass production board next
- #Need to make Guradian script for PR3. Shoda + Fujii and Okutomi will write one after the mechanical installation is finished.
- Electronics diagram and review
Electronics document tree for VIS by Mark (http://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=4937)
Updated PR3 schematic with OpLev wiring (http://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=4795)
- Need to think about the organization more
- Operation manual for digital system is necessary
bKAGRA preparation
- Three big categories of the tasks
- Type-A: Leader = Takahashi
- Type-B (BS and SRC): Leader = Mark
- Type-Bp modification: Leader = Shoda
Common Issues
Type-B
- Kick off meeting within February (Mark)
- BS prism preparation (Mark)
- Now have quotes for both prisms and grooves for orders of both 4 and 12:
|
Prisms |
Grooves |
Total |
4 |
$3,600 |
$2,600 |
$6,200 |
12 |
$9,000 |
$5,800 |
$14,800 |
- Got a quotation from Shinko-sha (Takahashi)
- 260KJPY for two. Lead time = 1.5month
- We will order 6 to Shinko-sha
- Takahashi will call the compnay to have a meeting
- Aso will check with Ohashi-san about the budget
- We will use the saphhire prisms for the test hanging too
The company suggested another US company for V-cut. Mark will contact them.
- Got a quotation from Shinko-sha (Takahashi)
- 260KJPY for two. Lead time = 1.5month
- With the V-cut company being different from what LIGO used, the advantage of using US companies is not clear now.
- One possibility for risk reduction: buy 2 from US, 4 from JP and use 2 from JP for test hanging to see if they work fine or not. If they work fine, we can continue to use them for SR. If they fail, we have another set to try from US.
- Can we make SR wire breakers bigger ?
Check what happens if we widen the slit by 3.75mm and make a new M5 (Hirata) -> Result
- Two concerns
- The rework may bend the wing shaped parts.
- The P.C.D. of the new screw holes may not coincide exactly with the other existing holes
- Consult with Fukushima-san again. Takahashi will contact Fukushima-san
- 型振り放電加工機 may be better
- Will test machine the dirty recoil mass.
- Brought back one RM to Mitaka
- It will take more than 1 month (Fukushima-san)
- Iwashita-san is preparing some tools for the machine. May take more than they initially expected.
Do we need to widen the slits for PRC RMs ? -> Depends on how difficult it is to rework the RM.
- Two concerns
- Flag design (Mark)
- Could make BS optic flag shorter by about 4 mm ("BS Optic Flag Concept 3 (Small Magnet, Short)") but it would cause work for Tatsumi-san for little benefit.
- Recommend "BS Optic Flag Concept 2 (Small Magnet)"
- Will make a smaller foot print flag design (Mark)
- Fabian did rigid IM flag design ("TBD")
- Mark would like to make a test flag with magnetic attachment.
- Use a key to determine the rotation angle of the flag
- Widen the OSEM opening (Akutsu)
- BS dummy optics design (Fabian)
http://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=4811
- The above design seems fine.
- Hirata-san is waiting for quotes from three companies
- IP base clamp (Fabian): Ordered
- Bread board spring (Takahashi): Got a quotation, but expensive. Looking for other companies.
- Issues with lower optical bench and damper ring.
- Last week's problem solved: support blocks on damper ring can be moved circumferentially to match support blocks on lower optical bench.
- New problem: damper ring needs to have central hole enlarged to allow passage of suspension during installation.
- Asking Mirapro to make a modification
- New problem: nail-head parts are too short to hook in support blocks - need to be remade longer (and rods shortened to match).
- Will make a design change.
- BS Assembly Frame Design (Mark, Hirata)
- Design is almost complete
- Need to add some mechanism to hook a load gauge
- Need to add some attachment points (e.g., ferromagnetic plates) for placing wind-shield panels.
- With check the structural strength
- Will talk with Mirapro (contact Nakamura-san : Hirata)
- Take photos of the BS area to see where is the optimal location of the assembly frame (Aso)
- Making assembly drawings for BS (Hirata)
- #BS gluing jigs (Tatsumi)
- #Not enough crane height problem (Hirata, Saito)
- #BS clean bag (Aso)
Type A
Task list (Takahashi)
- Thinking about a possibility of testing the long filter chain using the prototype EQ stop in Kashiwa.
- Organize a kick-off meeting in the later half of March, concentrating on the room temperature part. (Takahashi)
- Prototype long maraging rods (heat treated) were delivered from Aoyama
- #Type-A Filters Optimal Load Measurements
#Takahashi will make a plan for the optimal load check and ask ATC.-> Check two filters per month from April 2016. -> Will be presented to the ATC steering committee.
- #How to manufacture the long maraging wires ?
- One prototype was machined by Ojima
Aoyama can do the heat treatment for the long rod. Will ask them soon (Takahashi) -> Still waiting for a quotation.
- How to test it ?
- We can use the prototype assembly frame in TAMA.
Type-Bp modification
- PR2 Wire breaker problem
- Prism removal from PR2 (Hirose, Mark)
- Spare mirror is now back to Kashiwa
- Prism removal from PR2 (Hirose, Mark)
- CLIO suspension
- Ishizaki-san will come to pick it up
Other
- Safety
- #GAS blade inspection by Virgo (Takahashi)
- Shipped the blades. Will get results in 1-2 months.
Next meeting
2016/3/11 (Fri) 13:30 -
Next F2F 2016/4/1