Line 74: Line 74:
  * Kick off meeting within February (Mark)
Line 77: Line 76:
   * '''Takahashi will call the compnay to have a meeting '''    * '''Takahashi will call the company to have a meeting '''
Line 79: Line 78:
   * We will use the Sapphire prisms for the test hanging too    * We will use the sapphire prisms for the test hanging too
Line 82: Line 81:
Line 95: Line 93:
  * The above design seems fine.
Line 97: Line 94:
 * IP base clamp (Fabian): Ordered
 * Bread board spring: In manufacture
 * Issues with lower optical bench and damper ring.
 * BS secondary prisms (no action)
 * EQ stop extensions - designed, drawn; will order in new financial year (April)
 * Lower breadboard stuff
  * Breadboard spring bases and associated cable clamps: in manufacture
  * Breadboard springs: in manufacture
Line 104: Line 103:
 * Extension springs for IM pico motors: need to do new drawing from Promec, have made
Line 111: Line 111:
 * 2D and 3D assemblies  * 2D and 3D CAD

VIS Meeting on 2016/3/11

2016/3/11 13:00 -

Kamioka NAOJ Room & SeeVogh

Participants:

Schedule

  • Schedule status (Aso)

PR3

  • PR3 Operation Status (Fujii)
  • Traverser and Stepper motor remote control (Shoda)

Plan for the next week

  • Mon:
  • Tue:
  • Wed:
  • Thu:
  • Fri:

iKAGRA ETM suspension

  • Current status (Ohishi)

Travel Plans

  • Travel (Week of 3/14)
    • Takahashi:
    • Shoda:
    • Mark:
    • Fabian:
    • Okutomi:
    • Fujii:
    • Ishizaki:
    • Hirata:
    • Ohishi:
  • Travel (Week of 3/21)
    • Takahashi:
    • Shoda:
    • Mark:
    • Fabian:
    • Okutomi:
    • Fujii:
    • Ishizaki:
    • Hirata:
    • Ohishi:

Electronics

bKAGRA preparation

  • Three big categories of the tasks
    • Type-A: Leader = Takahashi
    • Type-B (BS and SRC): Leader = Mark
    • Type-Bp modification: Leader = Shoda

Common Issues

  • #OSEM assembly status (Akutsu)

Type-B

  • KAGRA/Subgroups/VIS/TypeB

  • Task list/schedule

  • BS prism preparation (Mark)
    • We decided to order 6 to Shinko-sha
      • Takahashi will call the company to have a meeting

      • Aso will check with Ohashi-san about the budget

      • We will use the sapphire prisms for the test hanging too
      • Since we need to go forward on the BS and we can't make a decision on SR, we decided to go with tall 6.28 mm prisms, which saves adjusting other parts.
  • Can we make SR wire breakers bigger ?
    • Status of RM mass modification
  • Flag design
    • BS Flag Redesign on OneDrive

    • Optic flag design
      • Mark made a medium footprint flag design "BS Optic Flag Concept 4 (Small Magnet, Small Hole).pdf".
    • IM Flag design
      • Fabian improved rigid IM flag design ("BS_IM_flag_Concept_Screwed2.pdf")
      • Mark would (still) like to make a test flag with magnetic attachment.
      • Mark designed a tool for aligning the magnetically self-assembling IM flag design (drawing to be posted, hopefully before meeting).
    • Widen the OSEM opening (Akutsu)
  • BS dummy optics design (Fabian)
  • BS secondary prisms (no action)
  • EQ stop extensions - designed, drawn; will order in new financial year (April)
  • Lower breadboard stuff
    • Breadboard spring bases and associated cable clamps: in manufacture
    • Breadboard springs: in manufacture
    • Damper ring needs to have central hole enlarged to allow passage of suspension during installation.
      • Mirapro contacted - will remove rings from clean booth ≈3/12, inspect and quote.
    • Nail-head parts too short
      • Hirata-san has adjusted design and made new drawings.
  • Extension springs for IM pico motors: need to do new drawing from Promec, have made
  • BS Assembly Frame Design (Mark, Hirata)
    • Design is almost complete
    • Need to add some mechanism to hook a load gauge
      • Mark did initial mass budget (E1604966) and wrote up some specs for load gauge adapter.

    • Need to add some attachment points (e.g., ferromagnetic plates) for placing wind-shield panels.
    • Need to check the structural strength, did mass budget (see above)
    • Hirata-san contacted Mirapro: they will suggest a date after the iKAGRA vacuum work is done this week.
  • 2D and 3D CAD
    • Hirata-san worked on IM assembly drawing for BS
    • BS 3D Assembly
      • Hirata-san made much more up-to-date version of BS in chamber.
        • Has cable clamps, lower breadboard stuff.
        • Needs updates for BF and SF blade spring configuration.
  • #BS gluing jigs (Tatsumi)
  • #Not enough crane height problem (Hirata, Saito)
  • #BS clean bag (Aso)

Type A

  • Task list (Takahashi)

  • Thinking about a possibility of testing the long filter chain using the prototype EQ stop in Kashiwa.
  • Organize a kick-off meeting in the later half of March, concentrating on the room temperature part. (Takahashi)

  • Prototype long maraging rods (heat treated) were delivered from Aoyama
  • #Type-A Filters Optimal Load Measurements
    • #Takahashi will make a plan for the optimal load check and ask ATC.-> Check two filters per month from April 2016. -> Will be presented to the ATC steering committee.

    • #How to manufacture the long maraging wires ?
      • One prototype was machined by Ojima
      • Aoyama can do the heat treatment for the long rod. Will ask them soon (Takahashi) -> Still waiting for a quotation.

      • How to test it ?
        • We can use the prototype assembly frame in TAMA.

Type-Bp modification

  • Traverser motor driver (Shoda)
    • Need a box for stepping motor driver. Miyakawa-san is thinking about ordering chassis and boxes for motors. We discussed and agreed that the design of the boxes will be unified. The boxes will be designed and ordered together with those. (16/03/10)
    • Miyakawa-san wants to have a driver and a motor to test
  • PR2 Wire breaker problem
    • Prism removal from PR2 (Hirose, Mark)
      • Spare mirror is now back to Kashiwa
  • CLIO suspension
    • Ishizaki-san will come to pick it up

Other

  • Safety
    • Using Bel wires for the safety of working on the 2F may be good
      • Ishizaki will check if there is clean compatible ones -> Status

  • #GAS blade inspection by Virgo (Takahashi)
    • Shipped the blades. Will get results in 1-2 months.

Next meeting

2016/3/18 (Fri) 13:30 -

Next F2F 2016/4/1

KAGRA/Subgroups/VIS/VISMinutes20160311 (last edited 2016-03-12 05:09:36 by YoichiAso)