Line 85: Line 85:
  * Hirata-san made production drawings of ballast masses for checking. IMR is still on going.   * Hirata-san made production drawings of ballast masses for checking.
  * Hirata-san updated TM and RM assembly drawings.
  * Hirata-san worked on
IM, IMR and full payload assembly drawings - still on going.
Line 90: Line 92:
  * Prism meeting postponed to 3/29.

VIS Meeting on 2016/3/25

2016/3/25 13:30 -

Room 210 & SeeVogh

Participants:

Schedule

  • Schedule status (Aso)

PR3

  • PR3 Operation Status (Aso)
    • DAC problem persists
    • Sometimes, there are long large drifts together with MC mirrors. Floor drift ? http://klog.icrr.u-tokyo.ac.jp/osl/?r=1098

    • #Yaw picomotor does not work ? -> Try a manual pad control at some point.

  • Traverser and Stepper motor remote control (Shoda)

Plan for the next week

  • Mon:
  • Tue:
  • Wed:
  • Thu:
  • Fri:

iKAGRA ETM suspension

  • Current status (Ohishi)

Travel Plans

  • Travel (Week of 3/28)
    • Takahashi:
    • Shoda:
    • Mark:
    • Fabian:
    • Okutomi:
    • Fujii:
    • Ishizaki:
    • Hirata:
    • Ohishi:
  • Travel (Week of 4/4)
    • Takahashi:
    • Shoda:
    • Mark:
    • Fabian:
    • Okutomi:
    • Fujii:
    • Ishizaki:
    • Hirata:
    • Ohishi:

Electronics

  • What are necessary in the next few weeks ?
    • Nothing
  • Watch dog system (Tanaka)
  • Guardian script for PR3 (Shoda, Okutomi, Fujii)
    • Mark adapted sustools.py library from LIGO into vistools.py, wrote scripts to automate making safe.snap files.
  • Electronics diagram and review

bKAGRA preparation

  • Three big categories of the tasks
    • Type-A: Leader = Takahashi, Okutomi, Ishizaki, a new engineer
    • Type-B (BS and SRC): Leader = Mark, Fabian, Hirata
    • Type-Bp modification: Leader = Shoda, Fujii, A new technician (?)

Common Issues

  • Policy of the screw types to be used (Mark)
  • OSEM assembly (Akutsu)
    • Schedule for each suspension is necessary
    • Each leader will tell Akutsu-kun when and how many OSEMs they need.

Type-B

  • KAGRA/Subgroups/VIS/TypeB

  • Task list/schedule

  • Quick summary, week to 3/18
    • Hirata-san made production drawings of ballast masses for checking.
    • Hirata-san updated TM and RM assembly drawings.
    • Hirata-san worked on IM, IMR and full payload assembly drawings - still on going.
    • Hirata-san and Takahashi-san began building setup to measure SF optimum loads.
    • Fabian was at Kamioka helping with iKAGRA.
    • Mark was at Kamioka helping with iKAGRA, and worked on Python stuff to support Guardian etc.
    • Mark took more photos of the BS clean booth and worked on assembly procedure.
    • Prism meeting postponed to 3/29.
  • BS prism preparation (Mark)
    • We decided to order 6 to Shinko-sha
      • Meeting with company was set for 3/24 in Yokohama, but postponed to 3/29.

      • Aso will check with Ohashi-san about the budget -> we can place an order now.

      • We will use the sapphire prisms for the test hanging too
      • Since we need to go forward on the BS and we can't make a decision on SR, we decided to go with tall 6.28 mm prisms, which saves adjusting other parts.
  • Can we make SR wire breakers bigger ?
    • Fukushima-san preparing test: 3/4/2016 + 1 month = ≈4/1/2016
  • Flag design
    • BS Flag Redesign on OneDrive

    • Optic flag design
      • Concepts 4 and 5 under consideration
    • IM Flag design
      • Need to do drawings for self-assembling and rigid designs
    • Widen the OSEM opening (Akutsu)
    • A new local length sensing
    • Discussed a possibility to remove the sensing function from the mirror OSEM.
      • Chop off the flag part from the magnet holder
        • Safer (less possibility of flag damage)
        • Wider range
      • OpLev with two QPD sensors may be used instead to sense the longitudinal motion (Virgo is doing this)

      • Question is whether the sensing noise is good enough or not
      • Raffaele will look for documents/data in Virgo
      • Akutsu will consider if this option is possible in KAGRA OpLev

  • BS dummy optics design (Fabian)
    • T1604811

    • Hirata-san received one quote, is waiting on a second.
  • BS secondary prisms (no action)
  • EQ stop screws, extensions and lock nuts - designed, drawn; will order in new financial year (April)
  • Ballast masses for payload
  • Lower breadboard stuff
    • Breadboard spring bases and associated cable clamps: in manufacture
    • Breadboard springs: in manufacture
    • Damper ring needs to have central hole enlarged to allow passage of suspension during installation.
      • Received quote from Mirapro. Rings were removed from KAGRA.
    • Nail-head parts too short
      • No progress since last week but Hirata-san will ask for quote from Mirapro.
  • Extension springs for IM pico motors: need to do new drawing from Promec, have made
  • BS Assembly Frame Design (Mark, Hirata)
    • Design is almost complete
    • Need to add some mechanism to hook a load gauge
    • Need to add some attachment points (e.g., ferromagnetic plates) for placing wind-shield panels.
    • Need to check the structural strength, did mass budget (see above)
    • Mirapro postponed setting a meeting date till after 3/25.
  • 2D and 3D CAD
    • Assembly drawings
      • Hirata-san worked on IM assembly drawing for BS - nearly finished.
      • IRM on-going.
    • BS 3D Assembly
      • Needs updates for BF and SF blade spring configuration.
  • Procedure documents
    • BS team need to visit the site in the first week of April for checking the installation procedure.

    • Mark worked on main assembly.
    • Fabian worked on payload assembly.
  • #BS gluing jigs (Tatsumi)
  • #Not enough crane height problem (Hirata, Saito)
  • #BS clean bag (Aso)

Type A

  • Task list (Takahashi)

  • Thinking about a possibility of testing the long filter chain using the prototype EQ stop in Kashiwa.
    • The prototype EQ stop will be transported from Kashiwa to Kamioka on 31th March.
  • The kick-off meeting will be held on 31th March.
  • The test of prototype long maraging rod was started. Detail is here: http://klog.icrr.u-tokyo.ac.jp/osl/index.php?r=1077

    • Measuring two points along the wire to only measure the wire elongation
    • Should check if the wire comes back to the original length after off-loading.
  • Simultion: Okutomi will work with Fujii
    • Will have a draft simulation results by the Type-A kick-off meeting.
      • Got simulation information from Fujii-kun.
      • Now able to run simulation code
      • Need to confirm parameters with the actually delivered ones (like the weight)
  • #Type-A Filters Optimal Load Measurements
    • #Takahashi will make a plan for the optimal load check and ask ATC.-> Check two filters per month from April 2016. -> Will be presented to the ATC steering committee.

Type-Bp modification

  • Traverser motor driver (Shoda)
    • Need a box for stepping motor driver. Miyakawa-san is thinking about ordering chassis and boxes for motors. We discussed and agreed that the design of the boxes will be unified. The boxes will be designed and ordered together with those. (16/03/10)
    • Miyakawa-san wants to have a driver and a motor to test
      • Will give them to MIyakawa-san when Shoda-san come to Kamioka for the shifts

  • #PR2 Wire breaker problem
    • Prism removal from PR2 (Hirose, Mark)
      • Spare mirror is now back to Kashiwa
  • #CLIO suspension
    • Ishizaki-san will come to pick it up
  • Modification for bKAGRA
    • wiki

      • Uraguchi-san proposed us the new IP plan
      • Shoda updated the proposal(concerns?) for the BF active damping plan
    • Will have a brainstorming after the JSPS meeting
    • Review in April

Other

  • Safety
    • Two vacuum related accidents
    • Replace all the view ports (2 out of 3 were already replaced)
    • Mirapro will check the vacuum screws
  • #GAS blade inspection by Virgo (Takahashi)
    • Shipped the blades. Will get results in 1-2 months.

Next meeting

2016/4/1 (Fri) 13:30 -

Next F2F 2016/4/8

KAGRA/Subgroups/VIS/VISMinutes20160325 (last edited 2016-03-27 16:52:55 by MarkBarton)