Differences between revisions 15 and 16
Revision 15 as of 2016-04-15 12:53:28
Size: 13135
Editor: MarkBarton
Comment:
Revision 16 as of 2016-04-15 12:55:05
Size: 12901
Editor: MarkBarton
Comment:
Deletions are marked like this. Additions are marked like this.
Line 84: Line 84:
  * New drawings for dummy primary prisms and secondary prisms: [[http://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=5125| D1605125]], safety bar between IM and RM [[http://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=5127| D1605127]], and for the EQ stop [[http://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=5124|D1605124]]   * New drawings for dummy primary prisms and secondary prisms: [[http://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=5125| D1605125]]

VIS Meeting on 2016/4/15

2016/4/15 13:30 -

Room 210 & eZuce

Participants:

Schedule

  • #Schedule status (Aso)
  • #Will have a schedule meeting with Ando-san on April 15th in Kamioka (Takahashi, Mark, Shoda will come)

PR3

  • PR3 Operation Status (Aso)
  • Traverser and Stepper motor remote control (Shoda):
    • Aso will send a stepper motor driver from Kamioka to Mitaka for test.-> Done

iKAGRA ETM suspension

  • Current status (Ohishi)

Electronics

  • What are necessary in the next few weeks ?
  • Watch dog system (Tanaka)
  • #Electronics diagram and review
    • #Electronics document tree for VIS by Mark (E1604937)

    • #Updated PR3 schematic with OpLev wiring (D1604795)

    • #Who will manage the electronics of each suspension
      • Type-Bp will be controlled by Shoda but the diagram update will be done by Mark
      • Type-A may be maintained by a new engineer. Sould be discussed with the person before April .
    • #We need to count electronics and cables needed for the tests, such as temporary sensors and so on.

bKAGRA preparation

  • Three big categories of the tasks
    • Type-A: Leader = Takahashi, Okutomi, Ishizaki, a new engineer
    • Type-B (BS and SRC): Leader = Mark, Fabian, Hirata
    • Type-Bp modification: Leader = Shoda, Fujii, A new technician (?)

Common Issues

  • Policy of the screw types to be used (Mark, Fabian) E1605107 (draft)

  • Reflection type local sensor (Akutsu)
    • Test widening the opening next week (Akutsu) -> report

    • Continue to work on how to fit the reflective sensor into the current coil bobbin (Akutsu)
  • OSEM assembly (Akutsu)
    • Schedule for each suspension is now given to Akutsu-kun

Type-B

  • KAGRA/Subgroups/VIS/TypeB

  • Task list/schedule

  • Past Week Summary
  • Can we make SR wire breakers bigger?
    • Fukushima-san preparing test: 3/4/2016 + 1 month = ≈4/1/2016 -> Hirata-san and Takahashi-san talking to ATC 4/8 morning.

  • Flag design
    • BS Flag Redesign on OneDrive

    • Widen the OSEM opening (Akutsu)
    • A new local length sensing
      • Need to decide the strategy for BS: three choices
        • Use OSEMs as originally planned
        • Use OpLev, No OSEM flag

        • Use reflection type sensors, No OSEM flag
      • Decide later!
  • BS dummy optic
  • Prisms
    • New drawings for dummy primary prisms and secondary prisms: D1605125

  • EQ stop screws, extensions and lock nuts (in manufacture - promised for 4/22)
  • Ballast masses for payload
    • Hirata-san created drawings DropBox link

    • Drawings were checked by Mark, not yet ordered.
  • Lower breadboard stuff
    • Breadboard spring bases and associated cable clamps (in manufacture, expected 4/15)
    • Breadboard springs (in manufacture)
    • Damper ring mods (in manufacture, expected 4/28)
    • Nail-head parts: quote from Mirapro received, not urgent, will be combined with assembly frame order.
  • BS Assembly Frame Design (Mark, Hirata)
    • Quote received, drawings being checked. Will need minor modifications to support clean bag (see below).
  • Clean bag
    • Design done: T1605123

    • Aso-san will order
  • 2D and 3D CAD
  • Electronics
  • Procedure documents
    • No action since last week
  • Mirror box (Tatsumi)
    • Hirata-san is working on this as top priority - design decided, drawings being checked, will get them to Tatsumi-san ASAP.
    • BS clamp blocks already adjusted.
  • Not enough crane height problem (Hirata, Saito)
    • No action since last week

Type A

  • Task list (Takahashi)

  • Prototype test

    • The prototype EQ stop was transported from Kashiwa to Kamioka on 31th March.
    • Assembly of the EQ stop prototype on 6-7 April next to the SR3 chamber. -> Found a lot of things to improve. Report by Okutomi.

      • Will redeisgn the EQ stops for the actual Type-A suepsnions.
    • Demonstration of installation procedure using prototype filters (SFx1 + BFx2) from May
      • Use the prototype EQ stops with the old Type-B assembly frame
      • Clean booth construction for SR will start from July 1st.
      • The location will be between SR2 and SR3. Will talk with Saito-san if this plan is OK or not on 4/15 (Takahashi)
  • The next Type-A meeting will be on 4/14.
  • The test of prototype long maraging rod was started. Detail is here: http://klog.icrr.u-tokyo.ac.jp/osl/index.php?r=1185

    • Load dependence was measured using a laser position sensor. Extension of 2.84mm was observed for the load of 272.8kg. The extension is consistent with the calculation (2.75mm).
  • Maraging rod preparation status
    • 2 sets for magnetic dampers are missing
    • 4 long maraging rods will
  • Care on the humidity should be taken to store maraging steel to avoid cracking noise.
  • Type-A Filters Optimal Load Measurements
    • Started the measurements and installation of fishing rods: report

  • Simultion (Okutomi)
    • Simulation with a dummy payload (report)
    • Will update the seismic noise data.
    • Need to implement the damping control part to see the damped RMS.
    • Ballast masses for the top filter may interfere with the magic wands.
      • Need to check how many ballast masses are necessaryfor Type-B and see if they interfere (Mark). If so we need to modify the mass like making some cuts.

Type-Bp modification

  • Traverser motor driver (Shoda)
    • Need a box for stepping motor driver. Miyakawa-san is thinking about ordering chassis and boxes for motors. We discussed and agreed that the design of the boxes will be unified. The boxes will be designed and ordered together with those. (16/03/10)
    • Miyakawa-san wants to have a driver and a motor to test
      • Shoda is also asking Uraguchi-san to provide one more Traverser motor driver for the test.
        • -> Done, It must be sent to Kamioka today.

  • Modification for bKAGRA
    • wiki

    • Status of the plan IP
      • Fujii is writing the assembly procedure and the base design proposal for Uraguchi-san.Now it is in review inside the Type-Bp team.
    • Status of the plan BF
      • Hirata-san probided the latest CAD model for the BF, which includes the material information.
      • Please check the Report (Shoda)

        • Structure analysis of the EQ stop for active damping on BF
        • Minimam weight we need for the BFRM in order to damp the resonance enough
        • The first draft of the BF cap modification
    • Action items for Type-Bp modification
      • Update the document for Uraguchi-san (Fujii)
      • Simulation to decide the sensors and actuators for IP (Fujii)
      • Make first draft of the rigid BFRM structure (Shoda)
      • Work on the motor remote control (Shoda)
    • Will have a meeting with Virgo people sometime soon. Then have a review for Type-Bp

Site work plan for the next week

  • Mon:
  • Tue:
  • Wed:
  • Thu:
  • Fri:

Travel Plans

  • Travel (Week of 4/18)
    • Takahashi:23-25 (Shift)

    • Shoda:
    • Mark:
    • Fabian:
    • Okutomi:
    • Fujii:
    • Ishizaki:
    • Hirata:
    • Ohishi:
  • Travel (Week of 4/25)
    • Takahashi:
    • Shoda:
    • Mark:
    • Fabian:
    • Okutomi:
    • Fujii:
    • Ishizaki:
    • Hirata:
    • Ohishi:

Other

  • Safety
  • #GAS blade inspection by Virgo (Takahashi)
    • Shipped the blades. Will get results in 1-2 months.

Next meeting

2016/4/22 (Fri) 13:30 -

KAGRA/Subgroups/VIS/VISMinutes20160415 (last edited 2016-04-15 16:14:26 by YoichiAso)