= VIS Meeting on 2016/6/10 =
2016/6/10 13:30 - 15:00 @ Room 210
Participants: 
= Minutes of the VIS Meeting on 2016/6/10 =
2016/6/10 13:30 - 15:00 @ Room 210 Participants:
Line 6: Line 5:
Schedule Chart ([[https://www.dropbox.com/s/vft4x2etccvy70h/VIS-Overall-Schedule.pdf?dl=0|PDF]],[[https://www.dropbox.com/s/hvvby3p70eztmfd/VIS%20Overall%20Schedule-20160610.mpp?dl=0|MPP]])
Line 7: Line 8:
 * Type-A schedule chart  * Put a report here
Line 10: Line 11:
 * Type-B schedule chart  * Put a report here
Line 13: Line 14:
 * Type-Bp schedule chart  * 3D CAD model (Original & Latest modified version) -> DONE: Uploaded to ROOM214 (Shoda)
 * 1st draft of the installation procedure for modified parts -> Ongoing (Fujii+Shoda)
 * Rough LVDT model -> DONE: under discussion with Saito-san@ATC
 * We found that the suspension points of the optical bench are required to be shifted -> Shoda will design new adapters. (Deadline: Mid July)
Line 16: Line 20:
 * IMMT schedule chart  * Put a report here
Line 19: Line 23:
 * Put a report here

Minutes of the VIS Meeting on 2016/6/10

2016/6/10 13:30 - 15:00 @ Room 210 Participants:

Progress report

Schedule Chart (PDF,MPP)

Type-A (Takahashi)

  • Put a report here

Type-B (Mark)

  • Put a report here

Type-Bp (Shoda)

  • 3D CAD model (Original & Latest modified version) -> DONE: Uploaded to ROOM214 (Shoda)

  • 1st draft of the installation procedure for modified parts -> Ongoing (Fujii+Shoda)

  • Rough LVDT model -> DONE: under discussion with Saito-san@ATC

  • We found that the suspension points of the optical bench are required to be shifted -> Shoda will design new adapters. (Deadline: Mid July)

IMMT (Ohishi)

  • Put a report here

Watchdog system (Tanaka)

  • Put a report here

Safety

Issues

  • Accelerometers for IP
    • NIKHEF accelerometer measurement results (Fujii)
    • Geophone noise (Takahashi)
  • LVDT for BF damping
    • Any news from Virgo ? (Raffaele)
  • Interference of the interferometer beams with VIS structure

Site work plan for the next week

  • Mon:
  • Tue:
  • Wed:
  • Thu:
  • Fri:

BS crane will not be available: 13th -14th of June

Travel Plans

  • Travel (Week of 6/13)
    • Takahashi:
    • Shoda:
    • Mark:
    • Fabian:
    • Okutomi:
    • Fujii:
    • Ishizaki:
    • Hirata:
    • Ohishi:
    • Sato:
  • Travel (Week of 6/20):
    • Takahashi:
    • Shoda:
    • Mark:
    • Fabian:
    • Okutomi:
    • Fujii:
    • Ishizaki:
    • Hirata:
    • Ohishi:

Mark is away: July 8-20

Next meeting

2016/6/17(Fri) 13:30 -

Next VIS F2F 6/17

Next next F2F 7/8