* Put a report here | * 3D CAD model (Original & Latest modified version) -> DONE: Uploaded to ROOM214 (Shoda) * 1st draft of the installation procedure for modified parts -> Ongoing (Fujii+Shoda) * Rough LVDT model -> DONE: under discussion with Saito-san@ATC * We found that the suspension points of the optical bench are required to be shifted -> Shoda will design new adapters. (Deadline: Mid July) |
Minutes of the VIS Meeting on 2016/6/10
2016/6/10 13:30 - 15:00 @ Room 210 Participants:
Progress report
Type-A (Takahashi)
- Put a report here
Type-B (Mark)
- Put a report here
Type-Bp (Shoda)
3D CAD model (Original & Latest modified version) -> DONE: Uploaded to ROOM214 (Shoda)
1st draft of the installation procedure for modified parts -> Ongoing (Fujii+Shoda)
Rough LVDT model -> DONE: under discussion with Saito-san@ATC
We found that the suspension points of the optical bench are required to be shifted -> Shoda will design new adapters. (Deadline: Mid July)
IMMT (Ohishi)
- Put a report here
Watchdog system (Tanaka)
- Put a report here
Safety
Issues
- Accelerometers for IP
- NIKHEF accelerometer measurement results (Fujii)
- Geophone noise (Takahashi)
- LVDT for BF damping
- Any news from Virgo ? (Raffaele)
- Interference of the interferometer beams with VIS structure
Site work plan for the next week
- Mon:
- Tue:
- Wed:
- Thu:
- Fri:
BS crane will not be available: 13th -14th of June
Travel Plans
- Travel (Week of 6/13)
- Takahashi:
- Shoda:
- Mark:
- Fabian:
- Okutomi:
- Fujii:
- Ishizaki:
- Hirata:
- Ohishi:
- Sato:
- Travel (Week of 6/20):
- Takahashi:
- Shoda:
- Mark:
- Fabian:
- Okutomi:
- Fujii:
- Ishizaki:
- Hirata:
- Ohishi:
Mark is away: July 8-20
Next meeting
2016/6/17(Fri) 13:30 -
Next VIS F2F 6/17
Next next F2F 7/8