Line 66: Line 66:
 * Put a report here  * No report
Line 71: Line 71:
 * Above 10Hz  * Above 10Hz, the resistance fluctuation seems small (1e-7 Ohm/rtHz level)
 * In the 20min time scale, the resistance is fluctuating with the amplitude of 0.5mOhm or so.
 * '''We will get more detailed report in the next week'''
Line 79: Line 81:
   * Shoda will give an overall presentation    * '''Shoda will give an overall presentation '''
Line 81: Line 83:
   * Electronics    * Discussion about the electronics. '''Ask Virgo people if they can give a short presentation on electronics (Raffaele)'''

Agenda/Minutes of the VIS Meeting on 2016/6/24

2016/6/24 13:30 - 15:00 @ Room 210

Participants:Fabian, Mark, Ohishi, Aso, Sato, Ishizaki, Tanaka, Hirata, Shoda, Raffaele, Akutsu

Progress report

Schedule Chart (PDF,MPP)

Type-A (Takahashi)

  • Minutes of Type-A Meeting

  • Simulation
    • Deadline is the end of June (Okutomi)

  • 5 blades for BF -> "The filters in Virgo are different from the GAS filters (no compression). 3 + 2 combination is no problem." (by E. Majorana)

Type-B (Mark)

  • Type B Past Week Summary
    • Mark and Fabian worked at Kamioka:
      • All the parts for the security structure were located. The clamp pieces for the IM are being taken back to Mitaka to have extra screw holes added.
      • The BS/PR2/SR2 area was cleaned and tidied to allow floor removal and assembly frame construction.
      • 21 "Type 1" cables (PI-Flange, Signal) and 15 "Type 5" cables (OSEM) were tested. They all passed. Sufficient tested "Type 2" cables (PI-Flange, Motor) were located in the PR3 area.
    • Hirata-san worked on the Inventor assembly, adding views (originally defined by Mark) of the different phases of construction.
    • Hirata-san shipped 7 SFs and some parts to Kamioka.
    • Hirata-san made assembly drawings of the damper rings and cable clamps for SR.
    • Hirata-san liaised with Mirapro about the frame assembly.
  • Type B ongoing issues
    • Wires
      • Need to decide RM wire thickness and order BS and RM wires. Lead time is a few days from Nilaco.
    • OSEMs
      • Akutsu-san is working to get wide-mouth OSEMs
    • Longer cables for BF->PI and SF->PI.

      • Takahashi-san has ordered extra connectors (due any day) and will get a company to make the cables.
    • Feedthrough Adapters
      • Need large quantity of male and female D-Sub 9, IDC ribbon connectors - Takahashi-san is getting a quote.
    • Can we make SR wire breakers bigger?
      • Fukushima-san will start on machining test soon (as of 5/27).
    • Installation stuff
      • Crane scale - RECEIVED
    • Ballast masses for payload
      • Initial batch received - ordered extra smaller ones to allow for adjustments.
    • Lower breadboard stuff
      • Installation to be incorporated into the procedure document. Mark/Takahashi to discuss.
      • Breadboard springs (in manufacture, expected end of July)
      • Nail-head parts: quote from Mirapro received, not urgent, will be combined with assembly frame order.
    • Documents

Type-Bp (Shoda)

  • Designed the additional masses for the IM JGWdoc(Shoda)

  • Created the 3D model of the vacuum tank with the PR suspensions also for PR2, 3, and M. Sectional View of PRs(Shoda)

  • Checked if the suspension parts clip any beams. Found the POX and POY beams are clipped at the RM. (Shoda)
  • Ckecked also the OpLev beam path inside the chamber except for PR2. Found that we cannot have the OpLev beam spot at the center of the PR3 optic. SVN(Shoda)

  • Summarized the information of iKAGRA PR3 measurement. Report(Fujii)

    • Now comparing the simulation and the measurement.
  • Design for the modification of the optical bench suspension points is on going. (Shoda)
    • We need the additional machining at the intermediate stage of the optical bench.
  • Design for the installation jigs for the optical bench is on going. (Shoda)
  • Detailed simulation for the modified Type-Bp is on going. (Fujii)
    • Created the Type-Bp model in both the SUMCON and simulink.
    • Checked the almost all the modes are damped within 1 min.
    • Design for the control filters are on going.
  • I asked Kasuya-san @ Somiya group to join the Type-Bp installation. And she agrees. How far she will be involved is under discussion.

IMMT (Ohishi)

  • No report

Watchdog system (Tanaka)

  • I'm working on experiment for stability of PhotoMos Relay.

    • (I will be reported at the next meeting(Maybe..).
  • Above 10Hz, the resistance fluctuation seems small (1e-7 Ohm/rtHz level)
  • In the 20min time scale, the resistance is fluctuating with the amplitude of 0.5mOhm or so.
  • We will get more detailed report in the next week

Safety

  • No issue

Issues

  • LVDT for BF damping (Shoda, Raffaele)
    • Will have a meeting with Virgo on 6/27 from 4PM
      • Shoda will give an overall presentation

        • Show the fit check drawings
      • Discussion about the electronics. Ask Virgo people if they can give a short presentation on electronics (Raffaele)

    • Available size around the BFs (Shoda, Sato)
      • Type-Bp: 6 of them will fit if we rotate the vertical ones around the wire axis.
      • Type-A: We need to use the openings for the flanges in the cross-tube
    • Length to pitch coupling simulation (Okutomi)
  • Dummy payloads for Type-A (Takahashi, Aso)
    • Dummy payload interferometer: unlikely to happen
    • Need to think about how to test the Type-A performance without Michelson.

Site work plan for the next week

  • Mon:Mark and Fabian for BS preparation, Fujii for accelerometer, Akutsu and Simon for BS length sensing OpLev

  • Tue: Mark and Fabian for BS preparation, Fujii for accelerometer, Akutsu and Simon for BS length sensing OpLev

  • Wed: Mark and Fabian for BS preparation, Fujii for accelerometer
  • Thu: Mark and Fabian for BS preparation.
  • Fri: Mark and Fabian for BS preparation.

Travel Plans

  • Travel (Week of 6/27)
    • Takahashi:
    • Shoda:
    • Mark:27 - 7/1

    • Fabian: 27 - 7/1
    • Okutomi:
    • Fujii: 27-29
    • Ishizaki:
    • Hirata:
    • Ohishi:
    • Sato:
    • Akutsu: 27-28
    • Simon: 27-28
  • Travel (Week of 7/4):
    • Takahashi: 4-7 (extended chief meeting, site check for the installation of Type-A)
    • Shoda: 4 (extended chief meeting)
    • Mark:4-6 (preparation for BS installation)

    • Fabian:
    • Okutomi:
    • Fujii:
    • Ishizaki:5-7 (site check for the installation of Type-A)

    • Hirata:4-6 (preparation for BS installation)

    • Sato: 5-7 (site check for the installation of Type-A)
    • Ohishi:

Mark is away: July 8-20

Next meeting

2016/7/1(Fri) 13:30 -

Next F2F 7/8