Agenda/Minutes of the VIS Meeting on 2016/6/24
2016/6/24 13:30 - 15:00 @ Room 210
Participants:
Progress report
Type-A (Takahashi)
- Put a report here
Type-B (Mark)
- Put a report here
Type-Bp (Shoda)
- Put a report here
IMMT (Ohishi)
- Put a report here
Watchdog system (Tanaka)
I'm working on experiment for stability of PhotoMos Relay.
- (I will be reported at the next meeting(Maybe..).
Safety
- Any issue ?
Issues
- LVDT for BF damping (Shoda, Raffaele)
- Will have a meeting with Virgo on 6/27 from 4PM
- Available size around the BFs (Shoda, Sato)
- Length to pitch coupling simulation (Okutomi)
- Dummy payloads for Type-A (Takahashi, Aso)
- Dummy payload interferometer: unlikely to happen
- Need to think about how to test the Type-A performance without Michelson.
Site work plan for the next week
Mon:Mark and Fabian for BS preparation.
- Tue: Mark and Fabian for BS preparation.
- Wed: Mark and Fabian for BS preparation.
- Thu: Mark and Fabian for BS preparation.
- Fri: Mark and Fabian for BS preparation.
Travel Plans
- Travel (Week of 6/27)
- Takahashi:
- Shoda:
Mark:27 - 7/1
- Fabian: 27 - 7/1
- Okutomi:
- Fujii: 27-29
- Ishizaki:
- Hirata:
- Ohishi:
- Sato:
- Travel (Week of 7/4):
- Takahashi: 5-7 (site check for the installation of Type-A)
- Shoda:
Mark:4-7? (preparation for BS installation)
Fabian:4-8? (preparation for BS installation)
- Okutomi:
- Fujii:
Ishizaki:5-7 (site check for the installation of Type-A)
- Hirata:
- Sato: 5-7 (site check for the installation of Type-A)
- Ohishi:
Mark is away: July 8-20
Next meeting
2016/7/1(Fri) 13:30 -
Next F2F 7/8