Line 10: Line 10:
 * Put a report here  * [[http://gwwiki.icrr.u-tokyo.ac.jp/JGWwiki/KAGRA/Subgroups/VIS/TypeA|Minutes of Type-A Meeting]]
 * Simulation
  * '''Deadline is the end of June (Okutomi)'''
 * 5 blades for BF -> "The filters in Virgo are different from the GAS filters (no compression). 3 + 2 combination is no problem." (by E. Majorana)

Agenda/Minutes of the VIS Meeting on 2016/6/24

2016/6/24 13:30 - 15:00 @ Room 210

Participants:

Progress report

Schedule Chart (PDF,MPP)

Type-A (Takahashi)

  • Minutes of Type-A Meeting

  • Simulation
    • Deadline is the end of June (Okutomi)

  • 5 blades for BF -> "The filters in Virgo are different from the GAS filters (no compression). 3 + 2 combination is no problem." (by E. Majorana)

Type-B (Mark)

  • Put a report here

Type-Bp (Shoda)

  • Put a report here

IMMT (Ohishi)

  • Put a report here

Watchdog system (Tanaka)

  • I'm working on experiment for stability of PhotoMos Relay.

    • (I will be reported at the next meeting(Maybe..).

Safety

  • Any issue ?

Issues

  • LVDT for BF damping (Shoda, Raffaele)
    • Will have a meeting with Virgo on 6/27 from 4PM
    • Available size around the BFs (Shoda, Sato)
    • Length to pitch coupling simulation (Okutomi)
  • Dummy payloads for Type-A (Takahashi, Aso)
    • Dummy payload interferometer: unlikely to happen
    • Need to think about how to test the Type-A performance without Michelson.

Site work plan for the next week

  • Mon:Mark and Fabian for BS preparation.

  • Tue: Mark and Fabian for BS preparation.
  • Wed: Mark and Fabian for BS preparation.
  • Thu: Mark and Fabian for BS preparation.
  • Fri: Mark and Fabian for BS preparation.

Travel Plans

  • Travel (Week of 6/27)
    • Takahashi:
    • Shoda:
    • Mark:27 - 7/1

    • Fabian: 27 - 7/1
    • Okutomi:
    • Fujii: 27-29
    • Ishizaki:
    • Hirata:
    • Ohishi:
    • Sato:
  • Travel (Week of 7/4):
    • Takahashi: 5-7 (site check for the installation of Type-A)
    • Shoda:
    • Mark:4-7? (preparation for BS installation)

    • Fabian:4-8? (preparation for BS installation)

    • Okutomi:
    • Fujii:
    • Ishizaki:5-7 (site check for the installation of Type-A)

    • Hirata:
    • Sato: 5-7 (site check for the installation of Type-A)
    • Ohishi:

Mark is away: July 8-20

Next meeting

2016/7/1(Fri) 13:30 -

Next F2F 7/8

KAGRA/Subgroups/VIS/VISMinutes20160624 (last edited 2016-06-24 15:18:28 by YoichiAso)