Agenda/Minutes of the VIS Meeting on 2016/7/1

2016/7/1 13:30 - 15:00 @ Room 210

Participants:

Progress report

Schedule Chart (PDF,MPP)

Type-A (Takahashi)

  • Put a report here

Type-B (Mark)

  • Put a report here

Type-Bp (Shoda)

  • Put a report here

IMMT (Ohishi)

  • Put a report here

Watchdog system (Tanaka)

Safety

  • Any issue?

Discussion

  • LVDT for BF damping (Shoda, Raffaele)
  • Inertial Sensors for Type-B (Mark, Fujii)

Site work plan for the next week

  • Mon:Mark and Fabian for BS preparation

  • Tue: Mark and Fabian for BS preparation, Takahashi and Ishizaki for Type-A preparation
  • Wed: Mark and Fabian for BS preparation, Takahashi and Ishizaki for Type-A preparation
  • Thu: Mark and Fabian for BS preparation, Takahashi and Ishizaki for Type-A preparation
  • Fri:

Travel Plans

  • Travel (Week of 7/4):
    • Takahashi: 4-7 (extended chief meeting, site check for the installation of Type-A)
    • Shoda: 4 (extended chief meeting)
    • Mark:4-6 (preparation for BS installation)

    • Fabian:
    • Okutomi:
    • Fujii:
    • Ishizaki:5-7 (site check for the installation of Type-A)

    • Hirata:4-6 (preparation for BS installation)

    • Sato: 5-7 (site check for the installation of Type-A)
    • Ohishi:
  • Travel (Week of 7/11):
    • Takahashi:
    • Shoda:
    • Mark:
    • Fabian:
    • Okutomi:
    • Fujii:
    • Ishizaki:
    • Hirata:
    • Sato:
    • Ohishi:

Mark is away: July 8-20

Next meeting

2016/7/8(Fri) 13:30 - F2F@Mitaka