Agenda/Minutes of the VIS Meeting on 2016/7/1
2016/7/1 13:30 - 15:00 @ Room 210
Participants:
Progress report
Type-A (Takahashi)
- Put a report here
Type-B (Mark)
- Put a report here
Type-Bp (Shoda)
- Put a report here
IMMT (Ohishi)
- Put a report here
Watchdog system (Tanaka)
Experiment Report.http://gwdoc.icrr.u-tokyo.ac.jp/DocDB/0053/E1605344/002/Project%20WDS%20Experiment_20160701-2.pdf
Safety
- Any issue?
Discussion
- LVDT for BF damping (Shoda, Raffaele)
- Inertial Sensors for Type-B (Mark, Fujii)
Site work plan for the next week
Mon:Mark and Fabian for BS preparation
- Tue: Mark and Fabian for BS preparation, Takahashi and Ishizaki for Type-A preparation
- Wed: Mark and Fabian for BS preparation, Takahashi and Ishizaki for Type-A preparation
- Thu: Mark and Fabian for BS preparation, Takahashi and Ishizaki for Type-A preparation
- Fri:
Travel Plans
- Travel (Week of 7/4):
- Takahashi: 4-7 (extended chief meeting, site check for the installation of Type-A)
- Shoda: 4 (extended chief meeting)
Mark:4-6 (preparation for BS installation)
- Fabian:
- Okutomi:
- Fujii:
Ishizaki:5-7 (site check for the installation of Type-A)
Hirata:4-6 (preparation for BS installation)
- Sato: 5-7 (site check for the installation of Type-A)
- Ohishi:
- Travel (Week of 7/11):
- Takahashi:
- Shoda:
- Mark:
- Fabian:
- Okutomi:
- Fujii:
- Ishizaki:
- Hirata:
- Sato:
- Ohishi:
Mark is away: July 8-20
Next meeting
2016/7/8(Fri) 13:30 - F2F@Mitaka