Differences between revisions 3 and 4
Revision 3 as of 2016-07-01 10:40:48
Size: 1896
Comment:
Revision 4 as of 2016-07-01 12:00:02
Size: 2802
Editor: AyakaShoda
Comment:
Deletions are marked like this. Additions are marked like this.
Line 16: Line 16:
 * Put a report here  * Type-Bp 3D Drawings
  * Discussed with Virgo people about F7 LVDTs.
   * Obtained Virgo LVDT 2D drawings. -> Sent to Saito-san@ATC to implement them to Type-Bp modification.
   * Sent some information about the KAGRA LVDT circuit to Virgo so that they can see if we can use the same circuits.
  * Type-Bp design review is planned to be held in the week of 19th.

 * Simulation
  * The matrices to simulate the coupling to other DOFs by shifting the actuator position is implemented.
   The actuator position at BF does not seem to affect the performance so much. More detailed simulation required.

 * Installation related issues
  * Making the plan for the overall installation plan, such as how to install the optical bench and how the the assembly frame should look like.
   Report will be submitted by 7th.

 * Others
  * ACC work is taken over to Type-B team.
   Fujii-kun is making a report about ACC.

Agenda/Minutes of the VIS Meeting on 2016/7/1

2016/7/1 13:30 - 15:00 @ Room 210

Participants:

Progress report

Schedule Chart (PDF,MPP)

Type-A (Takahashi)

  • Put a report here

Type-B (Mark)

  • Put a report here

Type-Bp (Shoda)

  • Type-Bp 3D Drawings
    • Discussed with Virgo people about F7 LVDTs.
      • Obtained Virgo LVDT 2D drawings. -> Sent to Saito-san@ATC to implement them to Type-Bp modification.

      • Sent some information about the KAGRA LVDT circuit to Virgo so that they can see if we can use the same circuits.
    • Type-Bp design review is planned to be held in the week of 19th.
  • Simulation
    • The matrices to simulate the coupling to other DOFs by shifting the actuator position is implemented.
      • The actuator position at BF does not seem to affect the performance so much. More detailed simulation required.
  • Installation related issues
    • Making the plan for the overall installation plan, such as how to install the optical bench and how the the assembly frame should look like.
      • Report will be submitted by 7th.
  • Others
    • ACC work is taken over to Type-B team.
      • Fujii-kun is making a report about ACC.

IMMT (Ohishi)

  • Put a report here

Watchdog system (Tanaka)

  • Experiment Report.PDF

Safety

  • Any issue?

Discussion

  • LVDT for BF damping (Shoda, Raffaele)
  • Inertial Sensors for Type-B (Mark, Fujii)

Site work plan for the next week

  • Mon:Mark and Fabian for BS preparation

  • Tue: Mark and Fabian for BS preparation, Takahashi and Ishizaki for Type-A preparation
  • Wed: Mark and Fabian for BS preparation, Takahashi and Ishizaki for Type-A preparation
  • Thu: Mark and Fabian for BS preparation, Takahashi and Ishizaki for Type-A preparation
  • Fri:

Travel Plans

  • Travel (Week of 7/4):
    • Takahashi: 4-7 (extended chief meeting, site check for the installation of Type-A)
    • Shoda: 4 (extended chief meeting)
    • Mark:4-6 (preparation for BS installation)

    • Fabian:
    • Okutomi:
    • Fujii:
    • Ishizaki:5-7 (site check for the installation of Type-A)

    • Hirata:4-6 (preparation for BS installation)

    • Sato: 5-7 (site check for the installation of Type-A)
    • Ohishi:
  • Travel (Week of 7/11):
    • Takahashi:
    • Shoda:
    • Mark:
    • Fabian:
    • Okutomi:
    • Fujii:
    • Ishizaki:
    • Hirata:
    • Sato:
    • Ohishi:

Mark is away: July 8-20

Next meeting

2016/7/8(Fri) 13:30 - F2F@Mitaka

KAGRA/Subgroups/VIS/VISMinutes20160701 (last edited 2016-07-02 14:44:28 by MarkBarton)