 * Put a report here  * [[http://gwwiki.icrr.u-tokyo.ac.jp/JGWwiki/KAGRA/Subgroups/VIS/TypeA|Minutes of Type-A Meeting]]
 * Simulation (Okutomi)

Agenda/Minutes of the VIS Meeting on 2016/7/1

2016/7/1 13:30 - 15:00 @ Room 210

Participants:

Progress report

Schedule Chart (PDF,MPP)

Type-A (Takahashi)

Type-B (Mark)

  • Put a report here

Type-Bp (Shoda)

  • Type-Bp 3D Drawings
    • Discussed with Virgo people about F7 LVDTs.
      • Obtained Virgo LVDT 2D drawings. -> Sent to Saito-san@ATC to implement them to Type-Bp modification.

      • Sent some information about the KAGRA LVDT circuit to Virgo so that they can see if we can use the same circuits.
    • Type-Bp design review is planned to be held in the week of 19th.
  • Simulation
    • The matrices to simulate the coupling to other DOFs by shifting the actuator position is implemented.
      • The actuator position at BF does not seem to affect the performance so much. More detailed simulation required.
  • Installation related issues
    • Making the plan for the overall installation plan, such as how to install the optical bench and how the the assembly frame should look like.
      • Report will be submitted by 7th.
  • Others
    • ACC work is taken over to Type-B team.
      • Fujii-kun is making a report about ACC.

IMMT (Ohishi)

  • Put a report here

Watchdog system (Tanaka)

  • Experiment Report.PDF

Safety

  • Any issue?

Discussion

  • LVDT for BF damping (Shoda, Raffaele)
  • Inertial Sensors for Type-B (Mark, Fujii)

Site work plan for the next week

  • Mon:Mark and Fabian for BS preparation

  • Tue: Mark and Fabian for BS preparation, Takahashi and Ishizaki for Type-A preparation
  • Wed: Mark and Fabian for BS preparation, Takahashi and Ishizaki for Type-A preparation
  • Thu: Mark and Fabian for BS preparation, Takahashi and Ishizaki for Type-A preparation
  • Fri:

Travel Plans

  • Travel (Week of 7/4):
    • Takahashi: 4-7 (extended chief meeting, site check for the installation of Type-A)
    • Shoda: 4 (extended chief meeting)
    • Mark:4-6 (preparation for BS installation)

    • Fabian:
    • Okutomi:
    • Fujii:
    • Ishizaki:5-7 (site check for the installation of Type-A)

    • Hirata:4-6 (preparation for BS installation)

    • Sato: 5-7 (site check for the installation of Type-A)
    • Ohishi:
  • Travel (Week of 7/11):
    • Takahashi:
    • Shoda:
    • Mark:
    • Fabian:
    • Okutomi:
    • Fujii:
    • Ishizaki:
    • Hirata:
    • Sato:
    • Ohishi:

Mark is away: July 8-20