Agenda/Minutes of the VIS Meeting on 2016/7/1
2016/7/1 13:30 - 15:00 @ Room 210
Participants:
Progress report
Type-A (Takahashi)
- Simulation (Okutomi)
Type-B (Mark)
- Put a report here
Type-Bp (Shoda)
- Type-Bp 3D Drawings
- Discussed with Virgo people about F7 LVDTs.
Obtained Virgo LVDT 2D drawings. -> Sent to Saito-san@ATC to implement them to Type-Bp modification.
- Sent some information about the KAGRA LVDT circuit to Virgo so that they can see if we can use the same circuits.
- Type-Bp design review is planned to be held in the week of 19th.
- Discussed with Virgo people about F7 LVDTs.
- Simulation
- The matrices to simulate the coupling to other DOFs by shifting the actuator position is implemented.
- The actuator position at BF does not seem to affect the performance so much. More detailed simulation required.
- The matrices to simulate the coupling to other DOFs by shifting the actuator position is implemented.
- Installation related issues
- Making the plan for the overall installation plan, such as how to install the optical bench and how the the assembly frame should look like.
- Report will be submitted by 7th.
- Making the plan for the overall installation plan, such as how to install the optical bench and how the the assembly frame should look like.
- Others
- ACC work is taken over to Type-B team.
- Fujii-kun is making a report about ACC.
- ACC work is taken over to Type-B team.
IMMT (Ohishi)
- Put a report here
Watchdog system (Tanaka)
Experiment Report.PDF
Safety
- Any issue?
Discussion
- LVDT for BF damping (Shoda, Raffaele)
- Inertial Sensors for Type-B (Mark, Fujii)
Site work plan for the next week
Mon:Mark and Fabian for BS preparation
- Tue: Mark and Fabian for BS preparation, Takahashi and Ishizaki for Type-A preparation
- Wed: Mark and Fabian for BS preparation, Takahashi and Ishizaki for Type-A preparation
- Thu: Mark and Fabian for BS preparation, Takahashi and Ishizaki for Type-A preparation
- Fri:
Travel Plans
- Travel (Week of 7/4):
- Takahashi: 4-7 (extended chief meeting, site check for the installation of Type-A)
- Shoda: 4 (extended chief meeting)
Mark:4-6 (preparation for BS installation)
- Fabian:
- Okutomi:
- Fujii:
Ishizaki:5-7 (site check for the installation of Type-A)
Hirata:4-6 (preparation for BS installation)
- Sato: 5-7 (site check for the installation of Type-A)
- Ohishi:
- Travel (Week of 7/11):
- Takahashi:
- Shoda:
- Mark:
- Fabian:
- Okutomi:
- Fujii:
- Ishizaki:
- Hirata:
- Sato:
- Ohishi:
Mark is away: July 8-20
Next meeting
2016/7/8(Fri) 13:30 - F2F@Mitaka