Line 28: Line 28:
 * LVDT for BF damping (Shoda, Raffaele)
  * The next meeting on July 11th
  * Check if the current design of Virgo LVDT will fit to our systems
  * If so, we will produce them in Japan
  * Two sample LVDTs will be sent to Japan

Agenda/Minutes of the VIS Meeting on 2016/7/8

2016/7/8 13:30 - @ Room 210

Participants:

Progress report

Schedule Chart (PDF,MPP)

Type-A (Takahashi)

  • Put a report here

Type-B (Mark)

  • Put a report here

Type-Bp (Shoda)

  • Put a report here

IMMT (Ohishi)

  • Put a report here

Watchdog system (Tanaka)

  • Put a report here

Safety

  • Any issue ?

Discussion

  • Inertial Sensors for Type-B (Mark, Fujii)
    • Geophone performance results (Fabian)

Site work plan for the next week

  • Mon: Takahshi (witness/supervise the installation of a cross-tube)
  • Tue:
  • Wed:
  • Thu:
  • Fri:

Travel Plans

  • Travel (Week of 7/11):
    • Takahashi:11 (Cross tube installation)

    • Shoda:
    • Mark:
    • Fabian:
    • Okutomi:
    • Fujii:
    • Ishizaki:
    • Hirata:
    • Sato:
    • Ohishi:
  • Travel (Week of 7/18):
    • Takahashi:
    • Shoda:
    • Mark:
    • Fabian:
    • Okutomi:
    • Fujii:
    • Ishizaki:
    • Hirata:
    • Sato:
    • Ohishi:

Mark is away: July 8-20

Next meeting

2016/7/15(Fri) 13:30 - (Aso will be absent)